[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-42":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":736},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,42,50,2160,[13,38,53,68,82,97,112,127,141,155,170,185,200,214,228,242,257,271,285,300,314,329,343,355,369,383,394,408,422,436,450,464,479,493,508,522,536,551,565,579,593,607,621,635,650,664,679,694,708,722],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1113955,2,"多选题","下列装配方法中，属于过盈配合件装配方法的有（）。2016",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","锤击法",false,{"key":24,"text":25,"correct":26},"B","加热装配法",true,{"key":28,"text":29,"correct":26},"C","低温冷装配法",{"key":31,"text":32,"correct":22},"D","铰孔装配法",{"key":34,"text":35,"correct":26},"E","压入装配法","BCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1113956,"下列关于垫铁设置的说法，符合规范要求的（）。2015",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"每个地螺栓旁边至少应有一组垫铁",{"key":24,"text":45,"correct":22},"垫铁不得设置在底座主要承受力部位",{"key":28,"text":47,"correct":26},"设备底座接缝处的两侧各设置一组垫铁",{"key":31,"text":49,"correct":26},"每组垫铁的块数不宜超过5块",{"key":34,"text":51,"correct":22},"设备调平后，垫铁应与设备底座点焊牢固","ACD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1113957,"工业机电设备负荷联动试运转中，主要考核的内容有（ ）。2019",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"安装质量",{"key":24,"text":60,"correct":26},"设备性能",{"key":28,"text":62,"correct":22},"自控功能",{"key":31,"text":64,"correct":26},"生产能力",{"key":34,"text":66,"correct":26},"生产工艺","ABDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":67,"analysis":37},1113959,"（2020年真题）设备找正时，常用的检测方法有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"钢丝挂线法",{"key":24,"text":75,"correct":26},"放大镜观察接触法",{"key":28,"text":77,"correct":22},"显微镜观察法",{"key":31,"text":79,"correct":26},"高精度经纬仪测量法",{"key":34,"text":81,"correct":26},"导电接触讯号法",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1113960,"室内电缆敷设时，正确的做法有（）。2014",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"电力电缆敷设在控制电缆的上部",{"key":24,"text":89,"correct":26},"敷设时电缆从电缆盘的上端引出",{"key":28,"text":91,"correct":22},"电缆平行敷设在热力管道的上方",{"key":31,"text":93,"correct":22},"并列敷设电缆中间接头可在任意位置",{"key":34,"text":95,"correct":26},"电缆应在切断4小时内进行封头","ABE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1113961,"电缆上装设的标志牌，应注明的内容有（）。2017",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"线路编号",{"key":24,"text":104,"correct":26},"电缆型号",{"key":28,"text":106,"correct":26},"电缆规格",{"key":31,"text":108,"correct":26},"起讫地点",{"key":34,"text":110,"correct":22},"使用年限","ABCD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1113962,"防爆电气设备应有（）标志。2010",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"EX",{"key":24,"text":119,"correct":26},"类型",{"key":28,"text":121,"correct":26},"级别",{"key":31,"text":123,"correct":22},"色别",{"key":34,"text":125,"correct":26},"组别","ABCE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":67,"analysis":37},1113963,"室外电力线路的形式有（）。2012",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"高压架空线路",{"key":24,"text":134,"correct":26},"保护管内电缆",{"key":28,"text":136,"correct":22},"桥架电缆",{"key":31,"text":138,"correct":26},"直埋电缆",{"key":34,"text":140,"correct":26},"隧道电缆",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":67,"analysis":37},1113964,"在电缆敷设过程中，应做的工作包括（）。2011",[145,147,149,151,153],{"key":20,"text":146,"correct":26},"标明电缆型号",{"key":24,"text":148,"correct":26},"排列整齐",{"key":28,"text":150,"correct":22},"避免平行重叠",{"key":31,"text":152,"correct":26},"横平竖直",{"key":34,"text":154,"correct":26},"标明起讫地点",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},1113965,"电气柜内二次回路的接线要求有（）2013",[159,161,163,165,167],{"key":20,"text":160,"correct":26},"按图施工，接线正确",{"key":24,"text":162,"correct":22},"导线允许有一个中间接头",{"key":28,"text":164,"correct":26},"电缆和导线的端部应标明其回路编号",{"key":31,"text":166,"correct":22},"每个接线端子上的接线最多不超过三根",{"key":34,"text":168,"correct":26},"配线应整齐、清晰和美观","ACE",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},1113966,"封闭母线安装程序中，外壳焊接前的工序有（）。2015",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"绝缘子安装",{"key":24,"text":177,"correct":26},"找正固定",{"key":28,"text":179,"correct":26},"导体焊接",{"key":31,"text":181,"correct":22},"电气试验",{"key":34,"text":183,"correct":22},"与设备连接","BC",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},1113967,"正确的电缆直埋敷设做法有（）。2016",[189,191,193,195,197],{"key":20,"text":190,"correct":26},"电缆敷设后铺100mm 厚的细沙再盖混凝土保护板",{"key":24,"text":192,"correct":26},"铠装电缆的金属保护层可靠接地",{"key":28,"text":194,"correct":22},"沟底铺设100mm 厚碎石",{"key":31,"text":196,"correct":26},"电缆进入建筑物时采用金属管保护",{"key":34,"text":198,"correct":22},"电缆可平行敷设在管道的上方","ABD",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":169,"analysis":37},1113968,"绝缘油注入油浸电气设备前，绝缘油应进行试验的项目有（ ）。2019",[204,206,208,210,212],{"key":20,"text":205,"correct":26},"电气强度试验",{"key":24,"text":207,"correct":22},"直流耐压试验",{"key":28,"text":209,"correct":26},"介质损失角正切值试验",{"key":31,"text":211,"correct":22},"局部放电试验",{"key":34,"text":213,"correct":26},"色谱分析",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":36,"analysis":37},1113969,"（2020年真题）关于电力架空线路架设及试验的说法中，正确的有（ ）",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"导线连接电阻不应超过同长度导线电阻的2倍",{"key":24,"text":221,"correct":26},"检查架空线各相两侧的相位应一致",{"key":28,"text":223,"correct":26},"在额定电压下对空载线路的冲击合闸试验应进行3次",{"key":31,"text":225,"correct":22},"导线连接处的机械强度不应低于导线强度的测温仪90%",{"key":34,"text":227,"correct":26},"检验导线接头的连接质量可用红外线测温仪",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":199,"analysis":37},1113970,"关于阀门的安装要求，正确的说法有（）。2013",[232,234,236,238,240],{"key":20,"text":233,"correct":26},"截止阀门安装时应按介质流向确定其安装方向",{"key":24,"text":235,"correct":26},"阀门与管道以螺纹方式连接时，阀门应处于关闭状态",{"key":28,"text":237,"correct":22},"阀门与管道以焊接连接时，阀门应处于关闭状态",{"key":31,"text":239,"correct":26},"闸阀与管道以法兰方式连接时，阀门应处于关闭状态",{"key":34,"text":241,"correct":22},"安全阀应水平安装以方便操作",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},1113971,"工业管道系统泄漏性试验的正确实施要点有（）。2016",[246,248,250,252,254],{"key":20,"text":247,"correct":26},"泄漏性试验的试验介质宜采用空气",{"key":24,"text":249,"correct":22},"试验压力为设计压力的1.5倍",{"key":28,"text":251,"correct":22},"泄漏性试验应在压力试验前进行",{"key":31,"text":253,"correct":26},"泄漏性试验可结合试车一并进行",{"key":34,"text":255,"correct":26},"输送极度和高度危害介质的管道必须进行泄漏性试验","ADE",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":52,"analysis":37},1113972,"关于管道系统压力试验前应具备条件的说法，正确的有（）。2017",[261,263,265,267,269],{"key":20,"text":262,"correct":26},"管道上的膨胀节已设置了临时约束装置",{"key":24,"text":264,"correct":22},"管道防腐及绝热工程已全部结束",{"key":28,"text":266,"correct":26},"符合压力试验要求的液体或气体已经备齐",{"key":31,"text":268,"correct":26},"试验方案已经过批准，并已进行安全交底",{"key":34,"text":270,"correct":22},"至少有1块在周检期内检验合格的压力表",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":111,"analysis":37},1113973,"下列工业管道水冲洗实施要点，正确的有（）。2015",[275,277,279,281,283],{"key":20,"text":276,"correct":26},"冲水流速不得低于1.5m\u002Fs",{"key":24,"text":278,"correct":26},"排水时不得形成负压",{"key":28,"text":280,"correct":26},"排出口的水色和透明度与入口水目测一致",{"key":31,"text":282,"correct":26},"使用洁净水连续进行冲洗",{"key":34,"text":284,"correct":22},"水中氢离子含量不得超过30pm",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":299,"analysis":37},1113974,"管道系统安装完毕后，输送介质为（）的管道必须进行泄漏性试验。2014",[289,291,293,295,297],{"key":20,"text":290,"correct":26},"天然气",{"key":24,"text":292,"correct":22},"蒸汽",{"key":28,"text":294,"correct":26},"氰化物",{"key":31,"text":296,"correct":26},"乙炔",{"key":34,"text":298,"correct":26},"煤气","ACDE",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":111,"analysis":37},1113975,"下列管道器件中，属于管道组成件的有（ ）。2019",[304,306,308,310,312],{"key":20,"text":305,"correct":26},"过滤器",{"key":24,"text":307,"correct":26},"密封件",{"key":28,"text":309,"correct":26},"疏水器",{"key":31,"text":311,"correct":26},"紧固件",{"key":34,"text":313,"correct":22},"锚固件",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":328,"analysis":37},1113976,"（2020年真题）下列设备中，属于工业整装锅炉附件的有（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":26},"省煤器",{"key":24,"text":321,"correct":26},"引风机",{"key":28,"text":323,"correct":26},"风管除尘器",{"key":31,"text":325,"correct":22},"汽包",{"key":34,"text":327,"correct":22},"水冷壁","ABC",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":169,"analysis":37},1113977,"（2020年真题）关于工业管道系统压力试验的说法，正确的有（）。",[333,335,337,339,341],{"key":20,"text":334,"correct":26},"脆性材料管道严禁气压试验",{"key":24,"text":336,"correct":22},"在热处理前完成管道压力试验",{"key":28,"text":338,"correct":26},"试验合格后应及时填写实验记录",{"key":31,"text":340,"correct":22},"压力试验宜采用液体作为试验介质",{"key":34,"text":342,"correct":26},"严禁在金属脆性转变温度下试验",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":111,"analysis":37},1113978,"汽包是将锅炉各部分受热面包括（）等连接在一起的构件。",[347,349,350,352,353],{"key":20,"text":348,"correct":26},"下降管",{"key":24,"text":327,"correct":26},{"key":28,"text":351,"correct":26},"过热器",{"key":31,"text":319,"correct":26},{"key":34,"text":354,"correct":22},"预热器",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":52,"analysis":37},1113979,"锅炉组件吊装原则有（）。2012",[359,361,363,365,367],{"key":20,"text":360,"correct":26},"先上后下",{"key":24,"text":362,"correct":22},"先小件后大件",{"key":28,"text":364,"correct":26},"先两侧后中间",{"key":31,"text":366,"correct":26},"先中心再炉前炉后",{"key":34,"text":368,"correct":22},"先外围后内部",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":52,"analysis":37},1113980,"用于发电机的冷却介质有（）。2013",[373,375,377,379,381],{"key":20,"text":374,"correct":26},"空气",{"key":24,"text":376,"correct":22},"惰性气体",{"key":28,"text":378,"correct":26},"氢气",{"key":31,"text":380,"correct":26},"水",{"key":34,"text":382,"correct":22},"润滑油",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":256,"analysis":37},1113981,"电站锅炉中的炉是由燃烧器以及（）等组成。2010",[387,389,390,391,393],{"key":20,"text":388,"correct":26},"炉膛",{"key":24,"text":351,"correct":22},{"key":28,"text":319,"correct":22},{"key":31,"text":392,"correct":26},"烟道",{"key":34,"text":354,"correct":26},{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":111,"analysis":37},1113982,"汽轮机按热力特性可以划分为（）汽轮机。2011",[398,400,402,404,406],{"key":20,"text":399,"correct":26},"凝气式",{"key":24,"text":401,"correct":26},"背压式",{"key":28,"text":403,"correct":26},"抽气式",{"key":31,"text":405,"correct":26},"多压式",{"key":34,"text":407,"correct":22},"塔式",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":299,"analysis":37},1113983,"轴系对轮中心找正时，应做到（）。",[412,414,416,418,420],{"key":20,"text":413,"correct":26},"以低压转子为基准",{"key":24,"text":415,"correct":22},"汽轮机的高、中、低压缸都已就位",{"key":28,"text":417,"correct":26},"对轮找中心都以全实缸、凝汽器灌水至模拟运行状态进行调整",{"key":31,"text":419,"correct":26},"各对轮找中时的开口和高低差要有预留值",{"key":34,"text":421,"correct":26},"在各不同阶段要进行多次对轮中心的复查和找正",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":96,"analysis":37},1113984,"发电机由定子和转子两部分组成，其中定子主要的组成部分有（）。",[426,428,430,432,434],{"key":20,"text":427,"correct":26},"机座",{"key":24,"text":429,"correct":26},"定子铁心",{"key":28,"text":431,"correct":22},"护环",{"key":31,"text":433,"correct":22},"激磁绕组",{"key":34,"text":435,"correct":26},"端盖",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":169,"analysis":37},1113985,"光伏发电设备安装的常用支架有（ ）。2019",[440,442,444,446,448],{"key":20,"text":441,"correct":26},"固定支架",{"key":24,"text":443,"correct":22},"弹簧支架",{"key":28,"text":445,"correct":26},"可调支架",{"key":31,"text":447,"correct":22},"抗震支架",{"key":34,"text":449,"correct":26},"跟踪支架",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":52,"analysis":37},1113986,"制作压力容器产品焊接试板是检验压力容器产品焊接头的力学性能的需要，产品焊接试板试样进行检验项目有（）。",[454,456,458,460,462],{"key":20,"text":455,"correct":26},"拉力试验",{"key":24,"text":457,"correct":22},"硬度试验",{"key":28,"text":459,"correct":26},"冷弯试验",{"key":31,"text":461,"correct":26},"冲击试验",{"key":34,"text":463,"correct":22},"压力试验",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":478,"analysis":37},1113987,"分段到货塔器如炼油装置的分离塔，其组对安装方式主要有（）。",[468,470,472,474,476],{"key":20,"text":469,"correct":26},"卧装",{"key":24,"text":471,"correct":26},"由下至上逐段组对安装",{"key":28,"text":473,"correct":22},"散装",{"key":31,"text":475,"correct":22},"倒装",{"key":34,"text":477,"correct":22},"顶升法组对安装","AB",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":36,"analysis":37},1113988,"关于压力容器焊接试板要求的说法，正确的有（）。2014",[483,485,487,489,491],{"key":20,"text":484,"correct":22},"试板应采用与施焊压力容器相同的条件和工艺在试验场完成制作",{"key":24,"text":486,"correct":26},"试板应由该压力容器的施焊工进行焊接",{"key":28,"text":488,"correct":26},"试板检测不合格，允许返修",{"key":31,"text":490,"correct":22},"不得避开试板焊缝外观不合格的部分截取试样",{"key":34,"text":492,"correct":26},"焊接试板应同炉、同工艺随容器进行热处理",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":507,"analysis":37},1113989,"钢网架结构中要求测定挠度值不应超过设计值的1.5倍，其测定应该在（）工序完成后进行。",[497,499,501,503,505],{"key":20,"text":498,"correct":22},"网架地面组装",{"key":24,"text":500,"correct":22},"网架试吊中",{"key":28,"text":502,"correct":26},"结构总拼装",{"key":31,"text":504,"correct":26},"屋面工程",{"key":34,"text":506,"correct":22},"单元网格安装","CD",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":67,"analysis":37},1113991,"（2020年真题）金属浮顶罐充水试验的检验内容主要有（ ）。",[512,514,516,518,520],{"key":20,"text":513,"correct":26},"罐壁强度",{"key":24,"text":515,"correct":26},"浮顶升降试验",{"key":28,"text":517,"correct":22},"储罐容积",{"key":31,"text":519,"correct":26},"排水管严密性",{"key":34,"text":521,"correct":26},"罐底严密性",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":199,"analysis":37},1113992,"下列奥氏体不锈钢立式储罐绝热施工顺序的描述中，正确的有（）。2016",[526,528,530,532,534],{"key":20,"text":527,"correct":26},"焊接在罐体上的绝热层固定件，应在罐体绝热施工前完成",{"key":24,"text":529,"correct":26},"储罐气密性试验合格后，进行绝热施工",{"key":28,"text":531,"correct":22},"储罐绝热施工完成后，整罐进行水压试验",{"key":31,"text":533,"correct":26},"储罐外表面已按要求进行铝箔隔离才能进行绝热层施工",{"key":34,"text":535,"correct":22},"储罐绝热施工完成后才能进行储罐上仪表的接管工作",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":550,"analysis":37},1113993,"下列需除锈的材料或工件中，不宜采用火焰除锈的有（）。2014",[540,542,544,546,548],{"key":20,"text":541,"correct":22},"油浸过的金属表面",{"key":24,"text":543,"correct":22},"厚钢板",{"key":28,"text":545,"correct":26},"薄壁钢管",{"key":31,"text":547,"correct":26},"退火钢",{"key":34,"text":549,"correct":26},"淬火钢","CDE",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":169,"analysis":37},1113994,"保温棉的进场复检指标有（）。2015",[555,557,559,561,563],{"key":20,"text":556,"correct":26},"密度",{"key":24,"text":558,"correct":22},"绝热结构",{"key":28,"text":560,"correct":26},"含水率",{"key":31,"text":562,"correct":22},"几何形状",{"key":34,"text":564,"correct":26},"导热系数",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":550,"analysis":37},1113995,"高层建筑的采暖系统安装工艺流程中，采暖器具安装后的工序有（）。2013",[569,571,573,575,577],{"key":20,"text":570,"correct":22},"支架安装",{"key":24,"text":572,"correct":22},"支管安装",{"key":28,"text":574,"correct":26},"系统试压",{"key":31,"text":576,"correct":26},"系统冲洗",{"key":34,"text":578,"correct":26},"管道保温",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":96,"analysis":37},1113996,"高层建筑的排水通气管，应满足（）的要求。2010",[583,585,587,589,591],{"key":20,"text":584,"correct":26},"不能与风管连接",{"key":24,"text":586,"correct":26},"不能与烟道连接",{"key":28,"text":588,"correct":22},"不能穿过屋面",{"key":31,"text":590,"correct":22},"出口处不能有风",{"key":34,"text":592,"correct":26},"出口处必要时设置防雷装置",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":169,"analysis":37},1113997,"对金属管道做钝化处理。可采用0.1%左右的（）溶液。2015",[597,599,601,603,605],{"key":20,"text":598,"correct":26},"重铬酸",{"key":24,"text":600,"correct":22},"氢氧化钠",{"key":28,"text":602,"correct":26},"重铬酸钠",{"key":31,"text":604,"correct":22},"磷酸三钠",{"key":34,"text":606,"correct":26},"重铬酸钾",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":478,"analysis":37},1113998,"高层建筑中要求安装坡度应为3‰，不得小于2‰的管道有（）。2011",[611,613,615,617,619],{"key":20,"text":612,"correct":26},"汽水同向流动的热水采暖管道",{"key":24,"text":614,"correct":26},"汽水同向流动的蒸汽管道",{"key":28,"text":616,"correct":22},"汽水逆向流动的热水采暖管道",{"key":31,"text":618,"correct":22},"冷结水管道",{"key":34,"text":620,"correct":22},"散热器支管",{"id":622,"libraryId":5,"type":15,"typeLabel":16,"stem":623,"options":624,"answer":478,"analysis":37},1113999,"室内生活污水管道应按管道的（）设置排水坡度。",[625,627,629,631,633],{"key":20,"text":626,"correct":26},"不同材质",{"key":24,"text":628,"correct":26},"不同管径",{"key":28,"text":630,"correct":22},"不同长度",{"key":31,"text":632,"correct":22},"不同高度",{"key":34,"text":634,"correct":22},"不同弯头",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":649,"analysis":37},1114000,"关于建筑供热管道支、吊架安装的说法，正确的有（）。2016",[639,641,643,645,647],{"key":20,"text":640,"correct":26},"无热伸长管道的吊架应垂直安装",{"key":24,"text":642,"correct":22},"滑动支架滑托与滑槽接触应紧密",{"key":28,"text":644,"correct":26},"固定在建筑结构上的管道吊架不得影响结构安全",{"key":31,"text":646,"correct":22},"有热伸长管道的吊架应向热膨胀的方向偏移",{"key":34,"text":648,"correct":22},"固定支架与管道之间应留有3～5m的间隙","AC",{"id":651,"libraryId":5,"type":15,"typeLabel":16,"stem":652,"options":653,"answer":199,"analysis":37},1114001,"高层建筑排水管道按设计要求应设置（）。2018",[654,656,658,660,662],{"key":20,"text":655,"correct":26},"阻火圈",{"key":24,"text":657,"correct":26},"防火套管",{"key":28,"text":659,"correct":22},"防雷装置",{"key":31,"text":661,"correct":26},"伸缩节",{"key":34,"text":663,"correct":22},"补偿器",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":678,"analysis":37},1114002,"高层住宅给水排水及室内雨水管道应在（）后，再穿外墙做出户管道。",[668,670,672,674,676],{"key":20,"text":669,"correct":22},"室内管道安装",{"key":24,"text":671,"correct":22},"室内管道试压",{"key":28,"text":673,"correct":22},"室内管道防腐施工",{"key":31,"text":675,"correct":26},"结构封顶",{"key":34,"text":677,"correct":26},"初沉降","DE",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":693,"analysis":37},1114003,"高层建筑排水通气管的安装要求有（）。2012",[683,685,687,689,691],{"key":20,"text":684,"correct":22},"通气管应高出斜顶屋面0.3m.",{"key":24,"text":686,"correct":26},"在经常有人停留的平顶屋面通气管高出屋面2m",{"key":28,"text":688,"correct":22},"通气管应与风道或烟道连接",{"key":31,"text":690,"correct":26},"通气管应按防雷要求设置防雷装置",{"key":34,"text":692,"correct":22},"高出屋顶的通气管高度必须大于最大积水厚度","BD",{"id":695,"libraryId":5,"type":15,"typeLabel":16,"stem":696,"options":697,"answer":67,"analysis":37},1114004,"下列分项工程中，属于建筑饮用水供应系统的有（ ）。2019",[698,700,702,704,706],{"key":20,"text":699,"correct":26},"管道及配件安装",{"key":24,"text":701,"correct":26},"防腐",{"key":28,"text":703,"correct":22},"给水设备安装",{"key":31,"text":705,"correct":26},"绝热",{"key":34,"text":707,"correct":26},"试验与调试",{"id":709,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":711,"answer":36,"analysis":37},1114005,"（2020年真题）关于建筑管道安装的说法正确的是（ ）。",[712,714,716,718,720],{"key":20,"text":713,"correct":22},"不同材质管道应先安装塑料管后安装钢制管道",{"key":24,"text":715,"correct":26},"埋地管道在安装结束隐蔽之前应进行隐蔽工程",{"key":28,"text":717,"correct":26},"冷热水管道垂直安装时热水管道左侧",{"key":31,"text":719,"correct":22},"金属排水管横管固定在承重结构上的固定件间距不大于3m",{"key":34,"text":721,"correct":26},"室内排水立管与排出管端部的连接可采用两个45°弯头",{"id":723,"libraryId":5,"type":15,"typeLabel":16,"stem":724,"options":725,"answer":678,"analysis":37},1114006,"利用建筑物底板内钢筋作为接地体时，整个接地系统完工后，应抽检系统的（）2013",[726,728,730,732,734],{"key":20,"text":727,"correct":22},"钢筋的直径",{"key":24,"text":729,"correct":22},"钢筋焊接点",{"key":28,"text":731,"correct":22},"绝缘电阻值",{"key":31,"text":733,"correct":26},"导通状况",{"key":34,"text":735,"correct":26},"接地电阻值",[737,741,744,747,750,753],{"id":738,"name":739,"category":7,"favorite":740},1,"领导干部任职前廉政法规知识测试题",92,{"id":742,"name":743,"category":7,"favorite":738},595,"建筑结构与设备",{"id":745,"name":746,"category":7,"favorite":738},715,"招标采购专业知识与法律法规",{"id":748,"name":749,"category":7,"favorite":738},848,"市政方向-通用基础",{"id":751,"name":752,"category":7,"favorite":8},534,"BIM工程师",{"id":754,"name":752,"category":7,"favorite":8},535]