[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-40":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":735},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,40,50,2160,[13,38,53,68,83,97,112,127,142,157,171,186,201,215,225,240,254,269,284,298,311,325,339,353,368,382,396,410,425,439,453,467,482,496,510,523,537,551,565,579,593,607,621,635,650,664,678,692,707,721],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1113850,2,"多选题","绿色施工是指工程建设中，在保证质量、安全等基本要求的前提下，实现节能、节地、（ ）和环境保护。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","节资金",false,{"key":24,"text":25,"correct":22},"B","节资源",{"key":27,"text":28,"correct":29},"C","节水",true,{"key":31,"text":32,"correct":29},"D","节材",{"key":34,"text":35,"correct":22},"E","节时间","CD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1113851,"在下列控制措施中，属于绿色施工光污染控制措施的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"夜间电焊作业应采取遮挡措施，避免电弧焊光外泄",{"key":24,"text":45,"correct":22},"采取隔声与隔振措施",{"key":27,"text":47,"correct":29},"大型灯应控制照射角度，防止强光外泄",{"key":31,"text":49,"correct":22},"生活垃圾实行袋装化，及时清运",{"key":34,"text":51,"correct":22},"及时清掏各类池内沉淀物","AC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1113852,"在下列做法中，属于绿色施工环境保护控制措施的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"对粉末状材料应封闭存放",{"key":24,"text":60,"correct":22},"对施工场区及周边的古树名木进行移植",{"key":27,"text":62,"correct":29},"应针对不同的污水，设置相应的处理设施",{"key":31,"text":64,"correct":22},"有毒有害废弃物作为建筑垃圾外运",{"key":34,"text":66,"correct":29},"高层建筑清理垃圾采用容器吊运","ACE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1113853,"内部沟通协调的主要方法包括（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"定期召开协调会",{"key":24,"text":75,"correct":29},"利用巡检深入班组随时交流与沟通",{"key":27,"text":77,"correct":22},"建立协调调度室或设立调度员",{"key":31,"text":79,"correct":22},"项目经理指令",{"key":34,"text":81,"correct":29},"定期通报现场信息","ABE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":67,"analysis":37},1113854,"绿色施工管理的主要内容包括（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":29},"组织管理",{"key":24,"text":90,"correct":22},"咨询管理",{"key":27,"text":92,"correct":29},"规划管理",{"key":31,"text":94,"correct":22},"设计管理",{"key":34,"text":96,"correct":29},"评价管理",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1113855,"下列费用，属于企业管理费的有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"施工机械安拆费",{"key":24,"text":104,"correct":22},"仪器仪表维修费",{"key":27,"text":106,"correct":29},"财产保险费",{"key":31,"text":108,"correct":29},"检验试验费",{"key":34,"text":110,"correct":29},"工具用具使用费","CDE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1113856,"机电工程施工中材料成本的控制内容有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":29},"加强材料采购成本的管理",{"key":24,"text":119,"correct":29},"加强限额发料的管理",{"key":27,"text":121,"correct":22},"强化作业人员的技术素质",{"key":31,"text":123,"correct":29},"控制施工中材料消耗",{"key":34,"text":125,"correct":29},"从量差和价差的方面控制","ABDE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1113857,"降低成本的经济措施包括（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"将成本责任分解落实到各个岗位、落实到专人",{"key":24,"text":134,"correct":29},"加强员工的技术教育和培训工作，提升员工的工作水平",{"key":27,"text":136,"correct":22},"在施工过程中加强技术、质量检验力度",{"key":31,"text":138,"correct":29},"严格材料进场验收和限额领料控制制度",{"key":34,"text":140,"correct":22},"对引起成本变动的风险因素识别和分析，采取风险对策","BD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1113858,"成本计划的编制方法包括（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"按进度计划编制",{"key":24,"text":149,"correct":29},"按成本构成编制",{"key":27,"text":151,"correct":22},"按资源需求编制",{"key":31,"text":153,"correct":29},"按项目结构编制",{"key":34,"text":155,"correct":29},"按工程实施阶段编制","BDE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":126,"analysis":37},1113859,"项目成本控制的原则包括（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":29},"成本最低化原则",{"key":24,"text":164,"correct":29},"全面成本控制原则",{"key":27,"text":166,"correct":22},"按实控制原则",{"key":31,"text":168,"correct":29},"动态控制原则",{"key":34,"text":170,"correct":29},"责权利相结合原则",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},1113860,"按工程费用组成划分的建筑安装工程费包括（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":29},"人工费",{"key":24,"text":178,"correct":29},"材料费",{"key":27,"text":180,"correct":29},"施工机具使用费",{"key":31,"text":182,"correct":29},"企业管理费",{"key":34,"text":184,"correct":22},"措施项目费","ABCD",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":200,"analysis":37},1113861,"信息传递方式回访包括（ ）。",[190,192,194,196,198],{"key":20,"text":191,"correct":29},"邮件",{"key":24,"text":193,"correct":22},"座谈会",{"key":27,"text":195,"correct":29},"电话",{"key":31,"text":197,"correct":29},"传真",{"key":34,"text":199,"correct":22},"巡回式","ACD",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":126,"analysis":37},1113862,"工程回访工作计划内容有（ ）。",[205,207,209,211,213],{"key":20,"text":206,"correct":29},"回访对象及其工程名称",{"key":24,"text":208,"correct":29},"回访时间安排和主要内容",{"key":27,"text":210,"correct":22},"回访收费项目和标准",{"key":31,"text":212,"correct":29},"回访保修的执行单位",{"key":34,"text":214,"correct":29},"主管回访保修业务的部门",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":67,"analysis":37},1113863,"信息传递方式回访，一般可采用（ ）等方式。",[219,220,221,222,224],{"key":20,"text":191,"correct":29},{"key":24,"text":193,"correct":22},{"key":27,"text":195,"correct":29},{"key":31,"text":223,"correct":22},"巡回",{"key":34,"text":197,"correct":29},{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":239,"analysis":37},1113864,"在保修期内，对于用户投诉的处理，正确的做法有（ ）。",[229,231,233,235,237],{"key":20,"text":230,"correct":29},"应迅速及时处理，切勿拖延",{"key":24,"text":232,"correct":29},"认真调查分析，作出适当处理",{"key":27,"text":234,"correct":29},"对投诉进行友好解释和答复",{"key":31,"text":236,"correct":22},"对投诉有误的，可不作解释",{"key":34,"text":238,"correct":22},"对非施工单位责任，可拒绝处理","ABC",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":200,"analysis":37},1113865,"某施工单位承包某工厂新型锅炉项目安装任务，该锅炉竣工验收合格后，施工单位在保修期内需要进行的回访有（ ）。",[244,246,248,250,252],{"key":20,"text":245,"correct":29},"冬季回访",{"key":24,"text":247,"correct":22},"春季回访",{"key":27,"text":249,"correct":29},"技术性回访",{"key":31,"text":251,"correct":29},"保修期满前回访",{"key":34,"text":253,"correct":22},"夏季回访",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":268,"analysis":37},1113866,"根据《建设工程质量管理条例》规定，保修期最低2年的工程有（ ）。",[258,260,262,264,266],{"key":20,"text":259,"correct":29},"设备安装",{"key":24,"text":261,"correct":29},"电气管线",{"key":27,"text":263,"correct":22},"供热系统",{"key":31,"text":265,"correct":22},"屋面防水",{"key":34,"text":267,"correct":22},"地基基础","AB",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":283,"analysis":37},1113867,"机电工程验收的程序包括（ ）。",[273,275,277,279,281],{"key":20,"text":274,"correct":29},"做好施工项目竣工验收前的收尾工作",{"key":24,"text":276,"correct":22},"技术资料整理",{"key":27,"text":278,"correct":29},"全部验收",{"key":31,"text":280,"correct":29},"单项验收",{"key":34,"text":282,"correct":29},"组织好工程自检","ACDE",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":185,"analysis":37},1113868,"工程竣工结算价款包括（ ）。",[288,290,292,294,296],{"key":20,"text":289,"correct":29},"合同价款",{"key":24,"text":291,"correct":29},"施工过程中调整预算",{"key":27,"text":293,"correct":29},"预付及已结算工程价款",{"key":31,"text":295,"correct":29},"质量保证金",{"key":34,"text":297,"correct":22},"管理费",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":310,"analysis":37},1113869,"施工单位竣工验收的准备工作包括（ ）。",[302,303,305,307,309],{"key":20,"text":274,"correct":29},{"key":24,"text":304,"correct":22},"整理汇总技术资料、竣工图，装订成册，分类编目",{"key":27,"text":306,"correct":22},"核实工程量并评定质量",{"key":31,"text":308,"correct":29},"组织相关人员编制竣工结算",{"key":34,"text":282,"correct":29},"ADE",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":82,"analysis":37},1113870,"施工记录资料包括（ ）。",[315,317,319,321,323],{"key":20,"text":316,"correct":29},"定位放线记录",{"key":24,"text":318,"correct":29},"特种设备安装检验及验收检验报告",{"key":27,"text":320,"correct":22},"分部工程使用功能检测记录",{"key":31,"text":322,"correct":22},"单位工程质量验收记录",{"key":34,"text":324,"correct":29},"隐蔽工程验收记录",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":111,"analysis":37},1113872,"机电工程项目单机试运行前提供的相关资料和文件有（ ）。",[329,331,333,335,337],{"key":20,"text":330,"correct":22},"试运行方案",{"key":24,"text":332,"correct":22},"安全措施方案",{"key":27,"text":334,"correct":29},"各种产品的合格证书或复验报告",{"key":31,"text":336,"correct":29},"施工记录、隐蔽工程记录和各种检验、试验合格文件",{"key":34,"text":338,"correct":29},"与单机试运行相关的电气和仪表调校合格资料等",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":185,"analysis":37},1113873,"根据《计量法》、《计量法实施细则》以及有关法律、法规的规定，（ ）的，给国家和消费者造成损失的，责令其赔偿损失，没收计量器具和全部违法所得，可并处罚款。",[343,345,347,349,351],{"key":20,"text":344,"correct":29},"使用不合格计量器具",{"key":24,"text":346,"correct":29},"使用以欺骗消费者为目的计量器具",{"key":27,"text":348,"correct":29},"破坏计量器具准确度",{"key":31,"text":350,"correct":29},"伪造计量数据",{"key":34,"text":352,"correct":22},"使用不当",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":367,"analysis":37},1113874,"强制检定是指（ ）。",[357,359,361,363,365],{"key":20,"text":358,"correct":29},"由行政主管部门强制实行",{"key":24,"text":360,"correct":29},"应定点送检",{"key":27,"text":362,"correct":29},"实行定点定期的检定",{"key":31,"text":364,"correct":22},"使用单位有权选择检定机构",{"key":34,"text":366,"correct":29},"检定周期由执行强制检定的技术机构按照计量检定规程确定","ABCE",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":239,"analysis":37},1113875,"施工现场需管理的计量器具范围，包括（ ）的计量器具。",[372,374,376,378,380],{"key":20,"text":373,"correct":29},"企业自有",{"key":24,"text":375,"correct":29},"项目部租用",{"key":27,"text":377,"correct":29},"由建设方提供",{"key":31,"text":379,"correct":22},"分包方自带",{"key":34,"text":381,"correct":22},"检测单位",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":185,"analysis":37},1113876,"《中华人民共和国计量法>规定：用于（ ）等方面列入强检目录的工作计量器具，依法实施强制检定。",[386,388,390,392,394],{"key":20,"text":387,"correct":29},"环境监测",{"key":24,"text":389,"correct":29},"医疗卫生",{"key":27,"text":391,"correct":29},"贸易结算",{"key":31,"text":393,"correct":29},"安全防护",{"key":34,"text":395,"correct":22},"建筑安装",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":185,"analysis":37},1113877,"（ ）等计量器具，属于C类计量器具。",[400,402,404,406,408],{"key":20,"text":401,"correct":29},"游标塞尺",{"key":24,"text":403,"correct":29},"弯尺",{"key":27,"text":405,"correct":29},"钢直尺",{"key":31,"text":407,"correct":29},"对角检测尺",{"key":34,"text":409,"correct":22},"温度计",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":424,"analysis":37},1113878,"（ ）属于强制检定的计量器具范围。",[414,416,418,420,422],{"key":20,"text":415,"correct":29},"用电计量装置",{"key":24,"text":417,"correct":29},"兆欧表",{"key":27,"text":419,"correct":22},"电流表",{"key":31,"text":421,"correct":29},"测量噪声的声级计",{"key":34,"text":423,"correct":22},"电压表","ABD",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":367,"analysis":37},1113879,"企业、事业单位使用计量标准器具（简称计量标准）必须具备的条件有（ ）。",[429,431,433,435,437],{"key":20,"text":430,"correct":29},"必须经计量检定合格",{"key":24,"text":432,"correct":29},"具有正常工作所需要的环境条件",{"key":27,"text":434,"correct":29},"具有称职的保存、维护、使用人员",{"key":31,"text":436,"correct":22},"具有充足的资金投入",{"key":34,"text":438,"correct":29},"具有完善的管理制度",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":111,"analysis":37},1113880,"杜绝任何（ ）计量器具流入工作岗位。",[443,445,447,449,451],{"key":20,"text":444,"correct":22},"精度低的",{"key":24,"text":446,"correct":22},"等级低的",{"key":27,"text":448,"correct":29},"未经检定的",{"key":31,"text":450,"correct":29},"经检定不合格的",{"key":34,"text":452,"correct":29},"超过检定周期的",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":283,"analysis":37},1113881,"计量器具的选择原则包括（ ）。",[457,459,461,463,465],{"key":20,"text":458,"correct":29},"与工程项目的内容、检测要求相适应",{"key":24,"text":460,"correct":22},"所确定的施工方法和检验方法",{"key":27,"text":462,"correct":29},"检测器具的测量极限误差必须小于或等于被测对象所能允许的测量极限误差",{"key":31,"text":464,"correct":29},"必须具有技术鉴定书或产品合格证书",{"key":34,"text":466,"correct":29},"技术上先进，操作培训较容易",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":481,"analysis":37},1113882,"（ ）等计量器具，属于B类计量器具范围。",[471,473,475,477,479],{"key":20,"text":472,"correct":22},"与设备配套，平时不允许拆装的指示用计量器具",{"key":24,"text":474,"correct":29},"5m以上（不含5m）钢卷尺",{"key":27,"text":476,"correct":29},"水准仪",{"key":31,"text":478,"correct":29},"经纬仪",{"key":34,"text":480,"correct":29},"焊接检验尺","BCDE",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":239,"analysis":37},1113883,"计量器具经检定机构检定后，由其出具的可用来评定计量器具的性能和质量是否符合法定要求的检定印、证有（ ）。",[486,488,490,492,494],{"key":20,"text":487,"correct":29},"检定证书",{"key":24,"text":489,"correct":29},"检定结果通知书",{"key":27,"text":491,"correct":29},"检定印记",{"key":31,"text":493,"correct":22},"检定规程",{"key":34,"text":495,"correct":22},"检定项目",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":185,"analysis":37},1113884,"新购入的钢卷尺必须有（ ）。",[500,502,504,506,508],{"key":20,"text":501,"correct":29},"CMC计量器具生产许可证标志",{"key":24,"text":503,"correct":29},"批准生产编号",{"key":27,"text":505,"correct":29},"尺盒应无残缺",{"key":31,"text":507,"correct":29},"出厂合格证",{"key":34,"text":509,"correct":22},"生产日期",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":82,"analysis":37},1113885,"下列施工计量器具中，属于强制性检定范畴的是（ ）。",[514,516,518,520,521],{"key":20,"text":515,"correct":29},"声级计",{"key":24,"text":517,"correct":29},"绝缘电阻表",{"key":27,"text":519,"correct":22},"电阻表",{"key":31,"text":423,"correct":22},{"key":34,"text":522,"correct":29},"接地电阻测量仪",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":185,"analysis":37},1113886,"计量器具的使用人员应经过培训并具有相应的资格，熟悉并掌握计量检测设备的（ ）。",[527,529,531,533,535],{"key":20,"text":528,"correct":29},"性能",{"key":24,"text":530,"correct":29},"结构",{"key":27,"text":532,"correct":29},"相应的操作规程",{"key":31,"text":534,"correct":29},"使用要求",{"key":34,"text":536,"correct":22},"重量",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":67,"analysis":37},1113887,"以下属于C类计量器具范围的是（ ）。",[541,543,545,547,549],{"key":20,"text":542,"correct":29},"计量性能稳定，量值不易改变的计量器具",{"key":24,"text":544,"correct":22},"使用中不易损耗",{"key":27,"text":546,"correct":29},"使用要求精度不高的计量器具",{"key":31,"text":548,"correct":22},"经常拆装的指示用计量器具",{"key":34,"text":550,"correct":29},"非标准计量器具",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":126,"analysis":37},1113889,"用户申请用电时，应向供电企业提供用电工程项目批准的文件及有关的用电资料包括（ ）。",[555,557,559,561,563],{"key":20,"text":556,"correct":29},"电力用途",{"key":24,"text":558,"correct":29},"用电性质",{"key":27,"text":560,"correct":22},"用电路径",{"key":31,"text":562,"correct":29},"用电规划",{"key":34,"text":564,"correct":29},"用电设备清单",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":111,"analysis":37},1113890,"临时用电工程的检查验收，正确的说法是（ ）。",[569,571,573,575,577],{"key":20,"text":570,"correct":22},"临时用电工程必须由技术人员施工",{"key":24,"text":572,"correct":22},"临时用电工程安装完毕，由相关部门组织检查验收",{"key":27,"text":574,"correct":29},"检查情况应做好记录，并由相关人员签字确认",{"key":31,"text":576,"correct":29},"临时用电工程应定期检查",{"key":34,"text":578,"correct":29},"临时用电工程安全技术档案由主管现场的电气技术人员建立并保管",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":481,"analysis":37},1113891,"任何单位和个人在杆塔、拉线基础保护区范围外进行（ ）活动时，还必须遵守取土范围、坡度和预留通道的要求。",[583,585,587,589,591],{"key":20,"text":584,"correct":22},"种植",{"key":24,"text":586,"correct":29},"倾倒酸、碱、盐",{"key":27,"text":588,"correct":29},"开挖",{"key":31,"text":590,"correct":29},"钻探",{"key":34,"text":592,"correct":29},"打桩",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":67,"analysis":37},1113892,"施工现场临时用电安全技术要求包括（ ）。",[597,599,601,603,605],{"key":20,"text":598,"correct":29},"配电箱的电器安装板上必须分设N线端子板和PE线端子板",{"key":24,"text":600,"correct":22},"N线端子板必须与金属电器安装板可靠连接",{"key":27,"text":602,"correct":29},"两级漏电保护器的额定动作电流和额定动作时间应作合理配合",{"key":31,"text":604,"correct":22},"首级开关箱的漏电开关的额定动作电流不应大于30mA",{"key":34,"text":606,"correct":29},"末级开关箱的漏电开关的额定动作时间不应大于0.1s",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":481,"analysis":37},1113893,"制定在电力设施保护区内安装作业的施工方案前，先要摸清周边（ ）的实情，然后编制施工方案。",[611,613,615,617,619],{"key":20,"text":612,"correct":22},"地质情况",{"key":24,"text":614,"correct":29},"地下电缆的位置和标高",{"key":27,"text":616,"correct":29},"架空线路的高度",{"key":31,"text":618,"correct":29},"架空线路的电压等级",{"key":34,"text":620,"correct":29},"爆破点离设施的距离",{"id":622,"libraryId":5,"type":15,"typeLabel":16,"stem":623,"options":624,"answer":185,"analysis":37},1113894,"《中华人民共和国电力法》规定：（ ）和终止用电，应当依照规定的程序办理手续。",[625,627,629,631,633],{"key":20,"text":626,"correct":29},"申请新装用电",{"key":24,"text":628,"correct":29},"临时用电",{"key":27,"text":630,"correct":29},"增加用电容量",{"key":31,"text":632,"correct":29},"变更用电",{"key":34,"text":634,"correct":22},"购买用电计量装置",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":649,"analysis":37},1113895,"《中华人民共和国电力法》对用电计量装置的使用规定了（ ）等要求。",[639,641,643,645,647],{"key":20,"text":640,"correct":22},"用电计量装置由授权的检定机构进行检定合格",{"key":24,"text":642,"correct":29},"用电计量装置的设计应征得当地供电部门认可",{"key":27,"text":644,"correct":29},"施工单位安装完毕应由供电部门检查确认",{"key":31,"text":646,"correct":22},"用户在新装、换装及现场校验后，应对用电计量装置加封",{"key":34,"text":648,"correct":22},"用电计量装置加封后，供电企业应在工作凭证上签章","BC",{"id":651,"libraryId":5,"type":15,"typeLabel":16,"stem":652,"options":653,"answer":649,"analysis":37},1113896,"《中华人民共和国电力法》规定用户使用的电力电量，以计量检定机构依法认可的用电计量装置的记录为准。用户受电装置的设计、施工安装和运行管理，应当符合（ ）。",[654,656,658,660,662],{"key":20,"text":655,"correct":22},"设计标准",{"key":24,"text":657,"correct":29},"国家标准",{"key":27,"text":659,"correct":29},"电力行业标准",{"key":31,"text":661,"correct":22},"施工安装企业标准",{"key":34,"text":663,"correct":22},"用户要求",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":111,"analysis":37},1113897,"临时用电工程安装完毕后，由安全部门组织检查验收，参加人员有主管临时用电安全的项目部领导、有关技术人员、（ ）。必要时请主管部门代表和业主的代表参加。",[668,670,672,674,676],{"key":20,"text":669,"correct":22},"工程项目经理",{"key":24,"text":671,"correct":22},"监理工程师",{"key":27,"text":673,"correct":29},"临时用电施工组织设计编制人员",{"key":31,"text":675,"correct":29},"电工班长及安全员",{"key":34,"text":677,"correct":29},"施工现场主管人",{"id":679,"libraryId":5,"type":15,"typeLabel":16,"stem":680,"options":681,"answer":185,"analysis":37},1113898,"在电力设施保护区内进行大件吊装或卸载，制定施工方案前先要摸清周边电力设施的实情，例如（ ）等。",[682,684,686,688,690],{"key":20,"text":683,"correct":29},"地下电缆的位置",{"key":24,"text":685,"correct":29},"地下电缆的标高",{"key":27,"text":687,"correct":29},"空中架空线路的高度",{"key":31,"text":689,"correct":29},"空中架空线路的电压等级",{"key":34,"text":691,"correct":22},"该电力保护区的主管单位",{"id":693,"libraryId":5,"type":15,"typeLabel":16,"stem":694,"options":695,"answer":706,"analysis":37},1113899,"临时用电的用户，应安装用电计量装置。对不具备安装条件的，可按（ ）计收电费。",[696,698,700,702,704],{"key":20,"text":697,"correct":22},"用电电压",{"key":24,"text":699,"correct":29},"用电容量",{"key":27,"text":701,"correct":29},"使用时间",{"key":31,"text":703,"correct":29},"规定的电价",{"key":34,"text":705,"correct":22},"用电次数","BCD",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":424,"analysis":37},1113901,"电力设施保护的主体有（ ）。",[711,713,715,717,719],{"key":20,"text":712,"correct":29},"电力管理部门",{"key":24,"text":714,"correct":29},"公安部门",{"key":27,"text":716,"correct":22},"司法部门",{"key":31,"text":718,"correct":29},"电力企业",{"key":34,"text":720,"correct":22},"人民群众",{"id":722,"libraryId":5,"type":15,"typeLabel":16,"stem":723,"options":724,"answer":239,"analysis":37},1113902,"对未经许可擅自从事特种设备制造、安装、改造活动的，会受到的处罚有（ ）。",[725,727,729,731,733],{"key":20,"text":726,"correct":29},"由特种设备安全监督管理部门予以取缔，没收非法制造的产品",{"key":24,"text":728,"correct":29},"已经实施安装、改造的，责令恢复原状",{"key":27,"text":730,"correct":29},"处以罚款",{"key":31,"text":732,"correct":22},"三年内不予受理该单位的制造、安装、改造许可申请或者不予许可",{"key":34,"text":734,"correct":22},"触犯刑律的，对负有责任的主管人员和其他直接责任人员依法追究刑事责任",[736,740,743,746,749,752],{"id":737,"name":738,"category":7,"favorite":739},1,"领导干部任职前廉政法规知识测试题",92,{"id":741,"name":742,"category":7,"favorite":737},595,"建筑结构与设备",{"id":744,"name":745,"category":7,"favorite":737},715,"招标采购专业知识与法律法规",{"id":747,"name":748,"category":7,"favorite":737},848,"市政方向-通用基础",{"id":750,"name":751,"category":7,"favorite":8},534,"BIM工程师",{"id":753,"name":751,"category":7,"favorite":8},535]