[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-39":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":735},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,39,50,2160,[13,38,53,68,83,98,113,127,141,156,171,185,200,211,226,241,255,270,284,298,312,326,339,354,368,383,397,411,426,440,452,467,481,495,509,524,536,551,565,580,594,608,623,637,651,665,679,693,707,721],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1113798,2,"多选题","高层建筑管道常用的连接方式有（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","螺纹连接",true,{"key":24,"text":25,"correct":22},"B","法兰连接",{"key":27,"text":28,"correct":29},"C","胶水连接",false,{"key":31,"text":32,"correct":22},"D","电焊连接",{"key":34,"text":35,"correct":22},"E","热熔连接","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1113799,"通向室外的排水管，穿过墙壁或基础必须下翻时，应采用的连接方式是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"90°斜四通",{"key":24,"text":45,"correct":22},"45°三通",{"key":27,"text":47,"correct":22},"45°弯头",{"key":31,"text":49,"correct":29},"90°斜三通",{"key":34,"text":51,"correct":29},"45°四通","BC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1113800,"建筑管道安装的一般要求包括（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"先安装钢质管道，后安装塑料管道",{"key":24,"text":60,"correct":29},"先穿过地下室侧墙，后室内管道安装",{"key":27,"text":62,"correct":22},"冷热水管道上下平行安装时热水管道应在冷水管道上方",{"key":31,"text":64,"correct":29},"禁止管道安装时穿越抗震缝",{"key":34,"text":66,"correct":29},"方形补偿器在供暖管道上水平安装时，应设排气及泄水装置","AC",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1113801,"下列材料中，属于有机绝缘材料的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"矿物油",{"key":24,"text":75,"correct":29},"石棉",{"key":27,"text":77,"correct":29},"硫磺",{"key":31,"text":79,"correct":22},"树脂",{"key":34,"text":81,"correct":22},"橡胶","ADE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1113802,"关于高层建筑管道的连接方式，正确的有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":29},"镀锌钢管宜用螺纹连接，铝塑复合管一般也用螺纹连接",{"key":24,"text":90,"correct":22},"法兰连接一般用在主干道连接阀门、止回阀、水表、水泵等处",{"key":27,"text":92,"correct":29},"卡箍连接连接件连接可用于消防水、空调冷热水等系统直径小于或等于100mm的管道",{"key":31,"text":94,"correct":22},"铜管的连接可采用螺纹卡套压接",{"key":34,"text":96,"correct":22},"承插连接用于给排水铸铁管的连接","BDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1113803,"室内生活污水管道应按管道的（ ）设置排水坡度。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"不同材质",{"key":24,"text":105,"correct":22},"不同管径",{"key":27,"text":107,"correct":29},"不同长度",{"key":31,"text":109,"correct":29},"不同高度",{"key":34,"text":111,"correct":29},"不同弯头","AB",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":82,"analysis":37},1113804,"管道穿过墙壁和楼板时，设置套管正确的有（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"楼板内套管高出装饰地面20mm",{"key":24,"text":120,"correct":29},"楼板内套管高出装饰地面50mm",{"key":27,"text":122,"correct":29},"卫生间内套管高出装饰地面20mm",{"key":31,"text":124,"correct":22},"卫生间内套管高出装饰地面50mm",{"key":34,"text":126,"correct":22},"安装在墙壁内套管两端与饰面齐平",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":97,"analysis":37},1113805,"室内塑料排水管道系统的检验试验有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":29},"水压试验",{"key":24,"text":134,"correct":22},"通水试验",{"key":27,"text":136,"correct":29},"泄漏试验",{"key":31,"text":138,"correct":22},"灌水试验",{"key":34,"text":140,"correct":22},"通球试验",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1113806,"管道的防腐方法主要有（ ）等。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"涂漆",{"key":24,"text":148,"correct":22},"衬里",{"key":27,"text":150,"correct":22},"静电保护",{"key":31,"text":152,"correct":29},"阳极保护",{"key":34,"text":154,"correct":22},"阴极保护","ABCE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1113807,"民用建筑的排水通气管安装要求有（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"不得与烟道连接",{"key":24,"text":163,"correct":29},"可与风道连接",{"key":27,"text":165,"correct":29},"应高出屋面600mm",{"key":31,"text":167,"correct":29},"应高出屋顶门窗300mm",{"key":34,"text":169,"correct":22},"在有人停留的平屋顶上应高出屋面2m","AE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":82,"analysis":37},1113808,"机房、泵房管道安装前，详细检查设备本体（ ）等情况，经验证无误后方可配管。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"标高",{"key":24,"text":178,"correct":29},"中心线",{"key":27,"text":180,"correct":29},"管口方位",{"key":31,"text":182,"correct":22},"进出口管径",{"key":34,"text":184,"correct":22},"连接方法",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},1113809,"坡度不应小于5‰的供暖管道有（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":29},"汽、水同向流动的热水供暖管道",{"key":24,"text":192,"correct":29},"汽、水同向流动的蒸汽管道",{"key":27,"text":194,"correct":22},"汽、水逆向流动的热水供暖管道",{"key":31,"text":196,"correct":22},"汽、水逆向流动的蒸汽管道",{"key":34,"text":198,"correct":29},"凝结水管道","CD",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":112,"analysis":37},1113810,"安装在主干管上起切断作用的闭路阀门，应逐个做（ ）。",[204,206,208,209,210],{"key":20,"text":205,"correct":22},"严密性试验",{"key":24,"text":207,"correct":22},"强度试验",{"key":27,"text":134,"correct":29},{"key":31,"text":138,"correct":29},{"key":34,"text":140,"correct":29},{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":225,"analysis":37},1113811,"关于室内塑料给水系统的压力试验说法，正确的有（ ）。",[215,217,219,221,223],{"key":20,"text":216,"correct":29},"试验压力为设计压力的1.5倍",{"key":24,"text":218,"correct":29},"在试验压力下稳压30min",{"key":27,"text":220,"correct":22},"试验压力下稳压过程中，压力降不得超过0.05MPA",{"key":31,"text":222,"correct":22},"还需在工作压力的1.15倍状态下稳压2h",{"key":34,"text":224,"correct":22},"合格标准是不渗不漏","CDE",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":240,"analysis":37},1113812,"室内给水金属管道立管管卡的设置要求，正确的是（ ）。",[230,232,234,236,238],{"key":20,"text":231,"correct":22},"楼层高度小于或等于5m每层必须设置不少于1个",{"key":24,"text":233,"correct":29},"管道支架高度距地面为1.2m",{"key":27,"text":235,"correct":22},"管道支架高度距地面为1.5m",{"key":31,"text":237,"correct":22},"管道支架高度距地面为1.8m",{"key":34,"text":239,"correct":22},"楼层高度大于5m时，每层不得少于2个","ACDE",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":112,"analysis":37},1113813,"沟槽式连接水平钢管，支、吊架与接头的净间距要求（ ）。",[245,247,249,251,253],{"key":20,"text":246,"correct":22},"不宜小于150mm",{"key":24,"text":248,"correct":22},"不宜大于300mm",{"key":27,"text":250,"correct":29},"不宜小于300mm",{"key":31,"text":252,"correct":29},"不宜小于120mm",{"key":34,"text":254,"correct":29},"以上都对",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":269,"analysis":37},1113814,"以下管道常用的连接方式，正确的有（ ）。",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"管径小于或等于100mm的镀锌钢管宜用螺纹连接",{"key":24,"text":262,"correct":22},"直径较大的管道可采用法兰连接或焊接连接",{"key":27,"text":264,"correct":22},"直径大于或等于IOOrnm的镀锌钢管采用卡箍连接",{"key":31,"text":266,"correct":22},"铝塑复合管一般采用螺纹卡套压接",{"key":34,"text":268,"correct":29},"PR管采用热熔器进行电熔连接","ABCD",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":97,"analysis":37},1113815,"室内给水管道的安装工艺流程中，管道安装后的工序有（ ）。",[274,276,278,280,282],{"key":20,"text":275,"correct":29},"管道支架安装",{"key":24,"text":277,"correct":22},"防腐绝热",{"key":27,"text":279,"correct":29},"管道支管安装",{"key":31,"text":281,"correct":22},"系统压力试验",{"key":34,"text":283,"correct":22},"系统清洗、消毒",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":199,"analysis":37},1113816,"在管线测量前，安装单位应进行测量基准的交接的是（ ）。",[288,290,292,294,296],{"key":20,"text":289,"correct":29},"土建单位",{"key":24,"text":291,"correct":29},"测绘单位",{"key":27,"text":293,"correct":22},"建设单位",{"key":31,"text":295,"correct":22},"监理单位",{"key":34,"text":297,"correct":29},"以上全部",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":199,"analysis":37},1113817,"金属排水管道上的吊钩或卡箍应固定在承重结构上，固定件间距是（ ）。",[302,304,306,308,310],{"key":20,"text":303,"correct":29},"横管不大于3m",{"key":24,"text":305,"correct":29},"立管不大于4m",{"key":27,"text":307,"correct":22},"楼层高度小于或等于4m时，每层必须安装1个固定件",{"key":31,"text":309,"correct":22},"立管底部的弯管处应设支墩或采取固定措施",{"key":34,"text":311,"correct":29},"楼层高度大于5m时，每层不得少于2个固定件",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":325,"analysis":37},1113818,"高层建筑的雨水系统，管材正确的是（ ）。",[316,318,320,322,324],{"key":20,"text":317,"correct":22},"高层建筑的雨水系统采用镀锌焊接钢管",{"key":24,"text":319,"correct":22},"超高层建筑的雨水系统采用镀锌无缝钢管",{"key":27,"text":321,"correct":22},"高层和超高层建筑的重力流雨水管道系统采用球墨铸铁管",{"key":31,"text":323,"correct":29},"高层和超高层建筑的重力流雨水管道系统采用塑料管",{"key":34,"text":254,"correct":29},"ABC",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":269,"analysis":37},1113819,"下列试验中，建筑管道工程应进行的试验有（ ）。",[330,332,334,336,337],{"key":20,"text":331,"correct":22},"承压管道系统压力试验",{"key":24,"text":333,"correct":22},"非承压管道灌水试验",{"key":27,"text":335,"correct":22},"排水干管通球试验",{"key":31,"text":134,"correct":22},{"key":34,"text":338,"correct":29},"消火栓系统灌水试验",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":353,"analysis":37},1113820,"评标委员会由5人以上组成，但必须包括（ ）等方面专家。",[343,345,347,349,351],{"key":20,"text":344,"correct":29},"管理",{"key":24,"text":346,"correct":29},"财务",{"key":27,"text":348,"correct":29},"环保",{"key":31,"text":350,"correct":22},"技术",{"key":34,"text":352,"correct":22},"经济","DE",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":325,"analysis":37},1113821,"经批准后可以不进行施工招标的工程项目包括（ ）。",[358,360,362,364,366],{"key":20,"text":359,"correct":22},"涉及国家安全的项目",{"key":24,"text":361,"correct":22},"需采用不可替代的专利或者专有技术",{"key":27,"text":363,"correct":22},"采购人依法能够自行建设、生产或者提供",{"key":31,"text":365,"correct":29},"项目技术复杂",{"key":34,"text":367,"correct":29},"受自然地域环境限制",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":382,"analysis":37},1113822,"施工方案编制的内容中应包括（ ）。",[372,374,376,378,380],{"key":20,"text":373,"correct":22},"施工安排",{"key":24,"text":375,"correct":29},"工程索赔程序",{"key":27,"text":377,"correct":22},"施工进度计划",{"key":31,"text":379,"correct":29},"费用控制措施",{"key":34,"text":381,"correct":22},"质量安全保证措施","ACE",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":225,"analysis":37},1113823,"下列施工组织设计编制、审核和审批工作实行分级管理制度的说法，正确的有（ ）。",[387,389,391,393,395],{"key":20,"text":388,"correct":29},"施工组织总设计应由总承包单位项目负责人审批",{"key":24,"text":390,"correct":29},"单位工程施工组织设计应由项目技术负责人审批",{"key":27,"text":392,"correct":22},"施工方案应由项目技术负责人审批",{"key":31,"text":394,"correct":22},"重点、难点分部（分项工程和专项工程施工方案应由施工单位技术部门组织相关专家评审，施工单位技术负责人批准。",{"key":34,"text":396,"correct":22},"由专业承包单位施工的分部（分项工程或专项工程的施工方案，应由专业承包单位技术负责人或技术负责人授权的技术人员审批",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":382,"analysis":37},1113824,"施工组织设计编制依据包括（ ）。",[401,403,405,407,409],{"key":20,"text":402,"correct":22},"有关标准和技术经济指标",{"key":24,"text":404,"correct":29},"建设单位基本情况",{"key":27,"text":406,"correct":22},"工程施工合同",{"key":31,"text":408,"correct":29},"监理文件",{"key":34,"text":410,"correct":22},"工程现场条件",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":425,"analysis":37},1113825,"在材料进场时，项目部进行材料数量和质量验收的依据有（ ）。",[415,417,419,421,423],{"key":20,"text":416,"correct":22},"送料凭证",{"key":24,"text":418,"correct":22},"进料计划",{"key":27,"text":420,"correct":29},"施工图纸",{"key":31,"text":422,"correct":29},"用料计划",{"key":34,"text":424,"correct":22},"质量保证书","ABE",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":97,"analysis":37},1113826,"在施工机具的使用中，对于重要施工机械设备使用，要执行的制度有（ ）。",[430,432,434,436,438],{"key":20,"text":431,"correct":29},"定期检修制",{"key":24,"text":433,"correct":22},"专机专人负责制",{"key":27,"text":435,"correct":29},"进退场交接制",{"key":31,"text":437,"correct":22},"操作人员持证上岗制",{"key":34,"text":439,"correct":22},"机长负责制",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":155,"analysis":37},1113827,"重要施工机具的使用应贯彻的原则包括（ ）。",[444,446,448,449,451],{"key":20,"text":445,"correct":22},"“人机固定”原则",{"key":24,"text":447,"correct":22},"“三定”制度",{"key":27,"text":433,"correct":22},{"key":31,"text":450,"correct":29},"单位责任人负责制",{"key":34,"text":437,"correct":22},{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":466,"analysis":37},1113828,"在项目部现场“八大员”配备中，需要根据项目专业情况配备的施工管理人员有（ ）。",[456,458,460,462,464],{"key":20,"text":457,"correct":29},"安全员",{"key":24,"text":459,"correct":22},"施工员",{"key":27,"text":461,"correct":29},"材料员",{"key":31,"text":463,"correct":29},"资料员",{"key":34,"text":465,"correct":22},"质量员","BE",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":382,"analysis":37},1113829,"特种作业人员的资格条件要求有（ ）。",[471,473,475,477,479],{"key":20,"text":472,"correct":22},"具备相应工种的安全技术知识",{"key":24,"text":474,"correct":29},"具有5年以上类似工作的实际经验",{"key":27,"text":476,"correct":22},"取得特种作业操作证",{"key":31,"text":478,"correct":29},"具有本科以上的学历",{"key":34,"text":480,"correct":22},"参加国家规定的安全技术理论和实践操作考核并成绩合格",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":269,"analysis":37},1113830,"根据材料储存与保管要求，对于现场材料必须要采取（ ）措施",[485,487,489,491,493],{"key":20,"text":486,"correct":22},"防雨",{"key":24,"text":488,"correct":22},"防盗",{"key":27,"text":490,"correct":22},"防火",{"key":31,"text":492,"correct":22},"防变质",{"key":34,"text":494,"correct":29},"防错拿错用",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":269,"analysis":37},1113831,"施工组织设计交底的内容包括（ ）。",[499,501,503,505,507],{"key":20,"text":500,"correct":22},"工程特点、难点",{"key":24,"text":502,"correct":22},"主要施工工艺及施工方法",{"key":27,"text":504,"correct":22},"进度安排",{"key":31,"text":506,"correct":22},"安全技术措施",{"key":34,"text":508,"correct":29},"操作方法",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":523,"analysis":37},1113832,"下列作业活动中，需进行安全技术交底的是（ ）。",[513,515,517,519,521],{"key":20,"text":514,"correct":29},"钢结构焊接",{"key":24,"text":516,"correct":22},"大件物品的运输",{"key":27,"text":518,"correct":22},"高空作业",{"key":31,"text":520,"correct":22},"地下作业",{"key":34,"text":522,"correct":29},"离心泵试运行","BCD",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":225,"analysis":37},1113834,"施工方案的交底内容有（ ）。",[528,529,531,533,534],{"key":20,"text":504,"correct":29},{"key":24,"text":530,"correct":29},"组织机构设置",{"key":27,"text":532,"correct":22},"施工程序和顺序",{"key":31,"text":508,"correct":22},{"key":34,"text":535,"correct":22},"施工要点",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":550,"analysis":37},1113835,"机电工程在确定各项工程的开竣工时间和相互搭接关系时，应考虑的因素有（ ）。",[540,542,544,546,548],{"key":20,"text":541,"correct":22},"优先安排工程量大的工业生产主线",{"key":24,"text":543,"correct":22},"满足机电工程连续均衡施工要求",{"key":27,"text":545,"correct":29},"在机电工程施工过程中能加班加点",{"key":31,"text":547,"correct":22},"考虑各种不利条件的限制和影响",{"key":34,"text":549,"correct":29},"考虑各种不利环境的限制和影响","ABD",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":199,"analysis":37},1113836,"下列进度控制措施中，属于经济措施的是（ ）。",[555,557,559,561,563],{"key":20,"text":556,"correct":29},"明确工程现场进度控制人员及其分工",{"key":24,"text":558,"correct":29},"合同中要有专款专用条款，防止因资金问题而影响施工进度",{"key":27,"text":560,"correct":22},"施工中及时办理工程预付款",{"key":31,"text":562,"correct":22},"对工期提前给予奖励",{"key":34,"text":564,"correct":29},"施工前应加强图纸审查，严格控制随意变更",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":579,"analysis":37},1113837,"机电工程采用横道图来表示施工进度计划时的优点有（ ）。",[569,571,573,575,577],{"key":20,"text":570,"correct":22},"便于实际进度与计划进度比较",{"key":24,"text":572,"correct":29},"便于看出影响工期的关键工作",{"key":27,"text":574,"correct":22},"便于计算劳动力的需要量",{"key":31,"text":576,"correct":22},"便于计算材料和资金的需要量",{"key":34,"text":578,"correct":29},"便于施工进度的动态控制","ACD",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":67,"analysis":37},1113838,"作业进度计划的交底内容有（ ）。",[584,586,588,590,592],{"key":20,"text":585,"correct":22},"计划目标和执行计划的相关条件",{"key":24,"text":587,"correct":29},"施工用人力资源和物资供应保障情况",{"key":27,"text":589,"correct":22},"计划执行中可能遇见的问题与解决办法",{"key":31,"text":591,"correct":29},"各专业队组分工和衔接关系",{"key":34,"text":593,"correct":29},"单位工程质量目标",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":269,"analysis":37},1113839,"质量控制点是指对工程的（ ）等有严重影响的关键部位或对下道工序有严重影响的关键工序。",[598,600,602,604,606],{"key":20,"text":599,"correct":22},"性能",{"key":24,"text":601,"correct":22},"安全",{"key":27,"text":603,"correct":22},"寿命",{"key":31,"text":605,"correct":22},"可靠性",{"key":34,"text":607,"correct":29},"观感",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":622,"analysis":37},1113840,"下列施工质量控制，属于事中控制的有（ ）。",[612,614,616,618,620],{"key":20,"text":613,"correct":29},"施工资格审查",{"key":24,"text":615,"correct":22},"设备监造控制",{"key":27,"text":617,"correct":29},"单位工程质量评定",{"key":31,"text":619,"correct":22},"分项工程质量验收",{"key":34,"text":621,"correct":29},"工程质量文件建档","BD",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":112,"analysis":37},1113841,"下列工序质量控制的方法，属于工序质量预控的有（ ）。",[627,629,631,633,635],{"key":20,"text":628,"correct":22},"工序分析",{"key":24,"text":630,"correct":22},"质量控制点设置",{"key":27,"text":632,"correct":29},"隐蔽工程质量控制",{"key":31,"text":634,"correct":29},"观感质量检验",{"key":34,"text":636,"correct":29},"检测过程控制",{"id":638,"libraryId":5,"type":15,"typeLabel":16,"stem":639,"options":640,"answer":112,"analysis":37},1113842,"下列工程项目索赔中，属于按索赔目的分类的有（ ）。",[641,643,645,647,649],{"key":20,"text":642,"correct":22},"工期索赔",{"key":24,"text":644,"correct":22},"费用索赔",{"key":27,"text":646,"correct":29},"延期索赔",{"key":31,"text":648,"correct":29},"施工加速索赔",{"key":34,"text":650,"correct":29},"道义索赔",{"id":652,"libraryId":5,"type":15,"typeLabel":16,"stem":653,"options":654,"answer":579,"analysis":37},1113843,"合同控制应从（ ）进行，保证合同的顺利履行。",[655,657,659,661,663],{"key":20,"text":656,"correct":22},"合同实施监督",{"key":24,"text":658,"correct":29},"工程范围控制",{"key":27,"text":660,"correct":22},"跟踪与调整",{"key":31,"text":662,"correct":22},"工程变更管理",{"key":34,"text":664,"correct":29},"资金控制",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":155,"analysis":37},1113844,"施工安全技术措施费管理原则包括（ ）。",[669,671,673,675,677],{"key":20,"text":670,"correct":22},"企业提取",{"key":24,"text":672,"correct":22},"政府监管",{"key":27,"text":674,"correct":22},"确保需要",{"key":31,"text":676,"correct":29},"专项列账",{"key":34,"text":678,"correct":22},"规范使用",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":579,"analysis":37},1113846,"施工现场的交接与协调内容包括（ ）。",[683,685,687,689,691],{"key":20,"text":684,"correct":22},"机电与土建、装饰专业的交接与协调",{"key":24,"text":686,"correct":29},"施工用设备和材料的有序供应",{"key":27,"text":688,"correct":22},"专业施工顺序与施工工艺的协调",{"key":31,"text":690,"correct":22},"技术协调",{"key":34,"text":692,"correct":29},"管理情况的定期通报与奖惩",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":82,"analysis":37},1113847,"在下列保护控制措施中，属于绿色施工环境保护的有（ ）。",[697,699,701,703,705],{"key":20,"text":698,"correct":22},"水污染控制",{"key":24,"text":700,"correct":29},"安全健康保护",{"key":27,"text":702,"correct":29},"风险控制",{"key":31,"text":704,"correct":22},"土壤保护",{"key":34,"text":706,"correct":22},"地下设施、文物和资源保护",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":325,"analysis":37},1113848,"在下列管理中，属于绿色施工管理内容方面的有（ ）。",[711,713,715,717,719],{"key":20,"text":712,"correct":22},"规划管理",{"key":24,"text":714,"correct":22},"实施管理",{"key":27,"text":716,"correct":22},"评价管理",{"key":31,"text":718,"correct":29},"安全管理",{"key":34,"text":720,"correct":29},"质量管理",{"id":722,"libraryId":5,"type":15,"typeLabel":16,"stem":723,"options":724,"answer":82,"analysis":37},1113849,"对于与安监，质监，特检，消防和税务等对工程施工具有行政监督职能单位的沟通协调，项目部应采取的做法有（ ）。",[725,727,729,731,733],{"key":20,"text":726,"correct":22},"积极配合其监督检查活动",{"key":24,"text":728,"correct":29},"求得其对工程施工和员工生活的支持",{"key":27,"text":730,"correct":29},"平等协商、相互沟通、求得共识",{"key":31,"text":732,"correct":22},"认真落实检查发现的整改事项",{"key":34,"text":734,"correct":22},"为其监督检查提供工作和生活上的方便",[736,740,743,746,749,752],{"id":737,"name":738,"category":7,"favorite":739},1,"领导干部任职前廉政法规知识测试题",92,{"id":741,"name":742,"category":7,"favorite":737},595,"建筑结构与设备",{"id":744,"name":745,"category":7,"favorite":737},715,"招标采购专业知识与法律法规",{"id":747,"name":748,"category":7,"favorite":737},848,"市政方向-通用基础",{"id":750,"name":751,"category":7,"favorite":8},534,"BIM工程师",{"id":753,"name":751,"category":7,"favorite":8},535]