[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-38":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":738},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,38,50,2160,[13,38,53,68,82,97,112,126,141,156,171,186,199,213,228,242,257,272,286,301,315,330,344,359,373,387,400,414,428,442,456,471,483,498,513,527,541,555,569,584,598,612,626,640,654,668,682,696,711,725],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1113745,2,"多选题","下列金属风管中，应采取加固措施的有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","直径800mm，长度1200mm的圆形风管",false,{"key":24,"text":25,"correct":26},"B","直径1000mm，长度1500mm的螺旋风管",true,{"key":28,"text":29,"correct":26},"C","总表面积5m2的圆形风管",{"key":31,"text":32,"correct":22},"D","边长650mm，长度1000mm低压矩形风管",{"key":34,"text":35,"correct":26},"E","单边面积大于1.5m2中压风管","BCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1113746,"矩形风管通常采用（ ）加固件进行加固。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"角钢",{"key":24,"text":45,"correct":22},"工字钢",{"key":28,"text":47,"correct":26},"轻钢型材",{"key":31,"text":49,"correct":26},"钢板折叠",{"key":34,"text":51,"correct":22},"圆钢","ACD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1113747,"关于风管系统安装要点包括（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"切断支吊架的型钢应采用机械加工",{"key":24,"text":60,"correct":26},"支吊架不宜设在风口、阀门、检查门、自控装置处",{"key":28,"text":62,"correct":22},"输送含有腐蚀介质的气体的风管应采用硬聚氯乙烯",{"key":31,"text":64,"correct":22},"风管穿过需要封闭的防火墙体或楼板时，应设厚度不小于1.5mm的预埋管或防护套管",{"key":34,"text":66,"correct":26},"风管与防护套管之间应采用不燃柔性材料封堵","ABE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":52,"analysis":37},1113748,"风管安装就位的程序通常为（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"先上层后下层",{"key":24,"text":75,"correct":22},"先下层后上层",{"key":28,"text":77,"correct":26},"先立管后水平管",{"key":31,"text":79,"correct":26},"先主干管后支管",{"key":34,"text":81,"correct":22},"先支管后主干管",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1113749,"洁净空调系统制作风管的（ ），均按高压和中压系统的风管要求。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"洁净度",{"key":24,"text":89,"correct":22},"表面平整度",{"key":28,"text":91,"correct":26},"刚度",{"key":31,"text":93,"correct":22},"加固",{"key":34,"text":95,"correct":26},"严密性","CE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1113750,"风管安装时，其支、吊架或托架不宜设置在（）。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"风口处",{"key":24,"text":104,"correct":22},"消声器处",{"key":28,"text":106,"correct":26},"阀门处",{"key":31,"text":108,"correct":26},"检查门处",{"key":34,"text":110,"correct":26},"自控装置","ACDE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":111,"analysis":37},1113751,"风管系统安装完后，对风管进行严密性检验的主要部位有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"咬口缝",{"key":24,"text":119,"correct":22},"板材",{"key":28,"text":121,"correct":26},"铆接孔",{"key":31,"text":123,"correct":26},"法兰翻边",{"key":34,"text":125,"correct":26},"管段连接处",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1113752,"下列现场安装条件中，高效过滤器安装前必备的是（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":26},"洁净室的内装修工程全部完成",{"key":24,"text":133,"correct":26},"洁净室已经全面清扫、擦拭、空吹12～24h",{"key":28,"text":135,"correct":26},"高效过滤器已在洁净室外拆除外包装",{"key":31,"text":137,"correct":22},"洁净室的洁净度已达到设计要求",{"key":34,"text":139,"correct":26},"高效过滤器已经扫描检漏，且达到合格","ABCE",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1113753,"下列风管的制作材料，必须为不燃材料的是（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"低温送风空调风管",{"key":24,"text":148,"correct":26},"防排烟的柔性短管",{"key":28,"text":150,"correct":22},"净化空调送风风管",{"key":31,"text":152,"correct":26},"复合风管的覆面材料",{"key":34,"text":154,"correct":22},"高压系统送风风管","BD",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1113754,"关于变风量空调系统非设计满负荷条件下联合试运转及调试的描述，正确的是（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"空气处理机组在设计机外余压条件下，系统总风量实测值与设计风量的偏差允许值不应大于10%",{"key":24,"text":163,"correct":26},"系统空气处理机组应能在设计参数范围内对风机实现变频调速",{"key":28,"text":165,"correct":26},"空气处理机组新风量与设计新风量的允许偏差为O～+1O%",{"key":31,"text":167,"correct":26},"空调冷（热）水系统、冷却水系统总流量与设计流量的偏差不应大于10%",{"key":34,"text":169,"correct":22},"各变风量末端装置的最大风量调试结果与设计风量的允许偏差不应大于15%","BCD",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},1113755,"风管系统上经常拆卸的（ ）可采用可单独拆卸的绝热结构。",[175,177,179,181,183],{"key":20,"text":176,"correct":26},"法兰",{"key":24,"text":178,"correct":26},"阀门",{"key":28,"text":180,"correct":26},"过滤器",{"key":31,"text":182,"correct":22},"消声器",{"key":34,"text":184,"correct":22},"静压箱","ABC",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":170,"analysis":37},1113756,"通风空调中，与换热设备、蓄冷蓄热设备相连的管道应按要求设置（ ）。",[190,192,193,195,197],{"key":20,"text":191,"correct":22},"减振器",{"key":24,"text":178,"correct":26},{"key":28,"text":194,"correct":26},"压力表",{"key":31,"text":196,"correct":26},"温度计",{"key":34,"text":198,"correct":22},"疏水器",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":185,"analysis":37},1113758,"制冷剂管道系统安装完毕，外观检查合格后，应进行（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":26},"吹污",{"key":24,"text":206,"correct":26},"气密性试验",{"key":28,"text":208,"correct":26},"抽真空试验",{"key":31,"text":210,"correct":22},"通球试验",{"key":34,"text":212,"correct":22},"通水试验",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},1113759,"智能化系统检测前应提交的资料包括（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":26},"工程技术文件",{"key":24,"text":220,"correct":26},"设备材料进场检验记录",{"key":28,"text":222,"correct":22},"设计变更记录",{"key":31,"text":224,"correct":26},"自检记录",{"key":34,"text":226,"correct":22},"分部工程质量验收记录","ABD",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":140,"analysis":37},1113760,"确定建筑智能化工程的实施界面，应贯彻于（ ）的全过程中。",[232,234,236,238,240],{"key":20,"text":233,"correct":26},"设备采购",{"key":24,"text":235,"correct":26},"施工图深化",{"key":28,"text":237,"correct":26},"工程施工",{"key":31,"text":239,"correct":22},"成本核算",{"key":34,"text":241,"correct":26},"检测验收",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},1113761,"信息设施系统电话交换设备和通信接入设备安装要求包括（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":22},"交换机机柜，上下两端垂直偏差不应大于2mm",{"key":24,"text":249,"correct":22},"机柜应排列成直线，误差不应大于5mm",{"key":28,"text":251,"correct":26},"各种配线架底座水平误差每米不大于2mm",{"key":31,"text":253,"correct":26},"直流电源线应测试正负线间和负线对地面的绝缘电阻",{"key":34,"text":255,"correct":26},"交流电源线线芯间和芯线对地的绝缘电阻均不得小于1MΩ","CDE",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},1113762,"建筑智能化工程中使用有特殊要求的产品，其功能和性能等项目的检测可按（ ）进行。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"施工要求",{"key":24,"text":264,"correct":26},"合同规定",{"key":28,"text":266,"correct":26},"设计要求",{"key":31,"text":268,"correct":22},"使用要求",{"key":34,"text":270,"correct":22},"调试性能","BC",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":36,"analysis":37},1113763,"卫星接收天线设备系统调试内容包括（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"系统功能检查",{"key":24,"text":279,"correct":26},"卫星接收机上的信号强度和信号质量",{"key":28,"text":281,"correct":26},"测试天线底座接地电阻值",{"key":31,"text":283,"correct":22},"对各个分区进行音质试听",{"key":34,"text":285,"correct":26},"卫星接收天线的方位角和仰角",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":300,"analysis":37},1113764,"承包商提供的建筑智能化重要设备可靠性检测要求，正确的有（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":26},"可靠性检测需要长时间的统计数据",{"key":24,"text":293,"correct":22},"现场可以对产品的可靠性进行检测",{"key":28,"text":295,"correct":22},"现场可以对产品的可靠性进行分析",{"key":31,"text":297,"correct":26},"设备可靠性检测需进行第三方检测",{"key":34,"text":299,"correct":26},"参考厂商提供可靠性产品检测报告","ADE",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":300,"analysis":37},1113766,"有关智能化系统的检测，下列说法正确的是（ ）。",[305,307,309,311,313],{"key":20,"text":306,"correct":26},"系统检测应在系统试运行合格后进行",{"key":24,"text":308,"correct":22},"施工单位应组织项目检测小组",{"key":28,"text":310,"correct":22},"检测方案经施工单位技术负责人批准后实施",{"key":31,"text":312,"correct":26},"一般项目有两项及以上不合格的，系统检测结论应为不合格",{"key":34,"text":314,"correct":26},"系统检测程序：分项工程→子分部工程→分部工程",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":329,"analysis":37},1113767,"火灾自动报警系统设备安装要求包括（ ）。",[319,321,323,325,327],{"key":20,"text":320,"correct":26},"端子箱和模块箱宜设置在弱电间内",{"key":24,"text":322,"correct":22},"控制室引出的干线和火灾报警器及其他的控制线路应一起绑扎成束",{"key":28,"text":324,"correct":26},"端子板左侧为干线",{"key":31,"text":326,"correct":22},"设备接地采用镀锌扁铁",{"key":34,"text":328,"correct":26},"工作接地线与保护接地线应分开","ACE",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":256,"analysis":37},1113768,"国内生产的建筑智能化监控设备到达施工现场，应检查的文件包括（ ）。",[334,336,338,340,342],{"key":20,"text":335,"correct":22},"原产地证明",{"key":24,"text":337,"correct":22},"商检证明",{"key":28,"text":339,"correct":26},"产品合格证",{"key":31,"text":341,"correct":26},"质检报告",{"key":34,"text":343,"correct":26},"安装说明书",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":358,"analysis":37},1113769,"电动阀门安装前应进行的试验项目有（ ）。",[348,350,352,354,356],{"key":20,"text":349,"correct":26},"压力试验",{"key":24,"text":351,"correct":22},"行程试验",{"key":28,"text":353,"correct":22},"关紧力试验",{"key":31,"text":355,"correct":22},"绝缘测试",{"key":34,"text":357,"correct":26},"模拟动作试验","AE",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":329,"analysis":37},1113770,"电动风阀控制器安装前应进行的检查内容有（ ）。",[363,365,367,369,371],{"key":20,"text":364,"correct":26},"线圈和阀体间电阻",{"key":24,"text":366,"correct":22},"驱动速度",{"key":28,"text":368,"correct":26},"供电电压",{"key":31,"text":370,"correct":22},"负载电流",{"key":34,"text":372,"correct":26},"输入信号",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":185,"analysis":37},1113771,"选择建筑智能化产品主要考虑（ ）等信息。",[377,379,381,383,385],{"key":20,"text":378,"correct":26},"产品的品牌和生产地",{"key":24,"text":380,"correct":26},"产品支持的系统规模及监控距离",{"key":28,"text":382,"correct":26},"产品的网络性能及标准化程度",{"key":31,"text":384,"correct":22},"工程管理的特点",{"key":34,"text":386,"correct":22},"监控要求",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":67,"analysis":37},1113772,"进口的智能化设备，应提供的文件资料有（ ）。",[391,393,395,397,399],{"key":20,"text":392,"correct":26},"质量合格证明",{"key":24,"text":394,"correct":26},"检测报告",{"key":28,"text":396,"correct":22},"设备开箱记录",{"key":31,"text":398,"correct":22},"采购合同证明",{"key":34,"text":337,"correct":26},{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":329,"analysis":37},1113773,"智能化工程施工中，线路敷设满足要求的包括（ ）",[404,406,408,410,412],{"key":20,"text":405,"correct":26},"线缆敷设前，应做外观及导通检查",{"key":24,"text":407,"correct":22},"将设备及元件连接一起测量线路绝缘电阻",{"key":28,"text":409,"correct":26},"线路应按最短路径集中敷设",{"key":31,"text":411,"correct":22},"线路在任何情况下都不应有中间接头",{"key":34,"text":413,"correct":26},"线路敷设完毕，应进行校验及标号，并再次作外观及导通检查",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":140,"analysis":37},1113774,"建筑设备监控系统设备联动调试要求包括（ ）。",[418,420,422,424,426],{"key":20,"text":419,"correct":26},"监控中心设备、软件安装完毕，线缆敷设和接线符合设计和产品说明书要求",{"key":24,"text":421,"correct":26},"现场控制器应安装完毕，线缆敷设和接线符合设计和产品说明书要求",{"key":28,"text":423,"correct":26},"各种传感器、执行器等应安装完毕，线缆敷设和接线符合设计和产品说明书要求",{"key":31,"text":425,"correct":22},"建筑设备监控系统调试时间不少于24h",{"key":34,"text":427,"correct":26},"建筑设备监控设备与子系统间的通信接口及线缆敷设符合设计要求",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":329,"analysis":37},1113776,"关于光缆敷设的要求，正确的有（ ）。",[432,434,436,438,440],{"key":20,"text":433,"correct":26},"牵引力应加在加强芯上",{"key":24,"text":435,"correct":22},"光纤接头的预留长度不应小于5m",{"key":28,"text":437,"correct":26},"牵引力不应超过150kg",{"key":31,"text":439,"correct":22},"一次牵引的直线长度不宜超过2km",{"key":34,"text":441,"correct":26},"牵引速度宜为1Om\u002Fmin",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":140,"analysis":37},1113777,"消防验收的顺序包括（ ）。",[446,448,450,452,454],{"key":20,"text":447,"correct":26},"验收受理",{"key":24,"text":449,"correct":26},"现场检查",{"key":28,"text":451,"correct":26},"现场验收",{"key":31,"text":453,"correct":22},"隐蔽工程验收",{"key":34,"text":455,"correct":26},"结论评定",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":470,"analysis":37},1113778,"消防验收现场检查主要是核查工程实体是否符合经审核批准的消防设计，其内容包括（ ）等。",[460,462,464,466,468],{"key":20,"text":461,"correct":26},"房屋建筑的类别",{"key":24,"text":463,"correct":26},"消防车通道的布置",{"key":28,"text":465,"correct":22},"消防实战演练情况",{"key":31,"text":467,"correct":26},"各类消防设施的配备",{"key":34,"text":469,"correct":26},"安全疏散通道的布置","ABDE",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":470,"analysis":37},1113779,"消防验收时，施工单位应提交的资料包括（ ）等。",[475,476,478,480,481],{"key":20,"text":396,"correct":26},{"key":24,"text":477,"correct":26},"隐蔽工程验收记录",{"key":28,"text":479,"correct":22},"检测测试记录",{"key":31,"text":222,"correct":26},{"key":34,"text":482,"correct":26},"调试报告",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":497,"analysis":37},1113780,"消防工程资料移交包括消防工程在设计、施工和验收过程中所形成的（ ）。",[487,489,491,493,495],{"key":20,"text":488,"correct":22},"安装文件",{"key":24,"text":490,"correct":22},"招标文件",{"key":28,"text":492,"correct":26},"技术文件",{"key":31,"text":494,"correct":26},"经济文件",{"key":34,"text":496,"correct":22},"合同文件","CD",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":512,"analysis":37},1113781,"精装修消防验收，是对（ ）等部件的消防验收，是准备房屋建筑投入使用前的验收。",[502,504,506,508,510],{"key":20,"text":503,"correct":22},"消防设备和干线管网就位并调试",{"key":24,"text":505,"correct":22},"消防泵房的设备安装调试",{"key":28,"text":507,"correct":22},"室内自动喷水灭火管网连通",{"key":31,"text":509,"correct":26},"火灾报警探测器",{"key":34,"text":511,"correct":26},"疏散指示灯","DE",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":227,"analysis":37},1113782,"消防工程的子分部工程有：自动喷水灭火系统、干粉灭火系统、泡沫灭火系统、气体灭火系统（ ）等。",[517,519,521,523,525],{"key":20,"text":518,"correct":26},"火灾自动报警及消防联动控制系统",{"key":24,"text":520,"correct":26},"防排烟系统",{"key":28,"text":522,"correct":22},"应急疏散系统",{"key":31,"text":524,"correct":26},"固定消防炮灭火系统",{"key":34,"text":526,"correct":22},"通风系统",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":329,"analysis":37},1113783,"下列建筑或工程，属于需要申请消防验收的特殊建设工程有（ ）。",[531,533,535,537,539],{"key":20,"text":532,"correct":26},"广播电视楼",{"key":24,"text":534,"correct":22},"单体建筑总面积50000m2的居民住宅楼",{"key":28,"text":536,"correct":26},"建筑总面积12000m2的市场",{"key":31,"text":538,"correct":22},"发电、变配电工程",{"key":34,"text":540,"correct":26},"加油站",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":256,"analysis":37},1113784,"施工过程中的消防验收包括（ ）。",[545,547,549,551,553],{"key":20,"text":546,"correct":22},"消防器材验收",{"key":24,"text":548,"correct":22},"消防通道验收",{"key":28,"text":550,"correct":26},"隐蔽工程消防验收",{"key":31,"text":552,"correct":26},"粗装修消防验收",{"key":34,"text":554,"correct":26},"精装修消防验收",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":67,"analysis":37},1113785,"消防工程验收资料中应提供建筑消防产品的（ ）等合格证明。",[559,561,563,565,567],{"key":20,"text":560,"correct":26},"消防设施检测合格证明文件",{"key":24,"text":562,"correct":26},"具有防火性能要求的装修材料符合国家标准或者行业标准的证明文件",{"key":28,"text":564,"correct":22},"认可证书",{"key":31,"text":566,"correct":22},"验收报告",{"key":34,"text":568,"correct":26},"符合要求的检测机构出具的消防设施及系统检测合格文件",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":583,"analysis":37},1113786,"火力发电厂容量为90MV.A及以上的油浸变压器应设置（ ）系统。",[573,575,577,579,581],{"key":20,"text":574,"correct":26},"火灾自动报警",{"key":24,"text":576,"correct":26},"水喷雾灭火",{"key":28,"text":578,"correct":22},"自动喷洒灭火",{"key":31,"text":580,"correct":22},"消防炮灭火",{"key":34,"text":582,"correct":22},"泡沫灭火","AB",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":155,"analysis":37},1113787,"单台发电机组容量为300MW及以上的火电厂的企业消防站，应设置不少于2辆消车，消防车的类型是（ ）。",[588,590,592,594,596],{"key":20,"text":589,"correct":22},"泵浦消防车",{"key":24,"text":591,"correct":26},"水罐或泡沫消防车",{"key":28,"text":593,"correct":22},"云梯消防车",{"key":31,"text":595,"correct":26},"干粉或干粉泡沫联用车",{"key":34,"text":597,"correct":22},"登高平台消防车",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":329,"analysis":37},1113788,"有关消防水架空管道中的防晃支架，下列说法正确的是（ ）。 A.管径为",[602,604,606,608,610],{"key":20,"text":603,"correct":26},"N100的，每段配水干管设置防晃支架不应少于1个",{"key":24,"text":605,"correct":22},"防晃支架的间距不超过10m",{"key":28,"text":607,"correct":26},"管道改变方向时，应增设1个防晃支架",{"key":31,"text":609,"correct":22},"防晃支架的强度，应满足管道、配件及管内水的重量再加50%的竖直方向推力时不损坏",{"key":34,"text":611,"correct":26},"当管道穿梁安装时，管道用紧固件固定于混凝土结构上，宜可作为1个防晃支架",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":470,"analysis":37},1113789,"消防工程验收应具备的条件包括（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":26},"完成消防工程合同规定的工作量和变更增减工作量",{"key":24,"text":619,"correct":26},"与消防工程相关的分部工程已具备竣工验收条件或已进行验收",{"key":28,"text":621,"correct":22},"施工单位应提交：消防产品质量合格证明文件",{"key":31,"text":623,"correct":26},"建设单位应正式向当地公安消防机构提交申请验收报告并送交有关技术资料",{"key":34,"text":625,"correct":26},"所需资料应完整、合法、有效",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":140,"analysis":37},1113790,"从空间占位看，电梯一般由（ ）组成。",[630,632,634,636,638],{"key":20,"text":631,"correct":26},"机房",{"key":24,"text":633,"correct":26},"井道",{"key":28,"text":635,"correct":26},"轿厢",{"key":31,"text":637,"correct":22},"对重",{"key":34,"text":639,"correct":26},"层站",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":185,"analysis":37},1113791,"电梯安装前，安装单位书面告知应提交的资料包括（ ）等。",[644,646,648,650,652],{"key":20,"text":645,"correct":26},"安装监督检验约请书",{"key":24,"text":647,"correct":26},"特种设备安装改造维修告知单",{"key":28,"text":649,"correct":26},"施工现场作业人员持有的特种设备作业证",{"key":31,"text":651,"correct":22},"型式试验报告",{"key":34,"text":653,"correct":22},"产品质量证明文件",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":170,"analysis":37},1113792,"电梯导轨安装验收要求包括（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"安装位置必须符合制造厂规定",{"key":24,"text":661,"correct":26},"预埋件应符合土建布置图要求",{"key":28,"text":663,"correct":26},"锚栓连接强度满足电梯产品设计要求",{"key":31,"text":665,"correct":26},"混凝土构件的压缩强度应符合土建布置图要求",{"key":34,"text":667,"correct":22},"设有安全钳的对重导轨工作面接头缝隙处连续",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":470,"analysis":37},1113793,"自动扶梯、自动人行道施工程序有（ ）",[672,674,676,678,680],{"key":20,"text":673,"correct":26},"扶手带等构配件安装",{"key":24,"text":675,"correct":26},"梯段桁架吊装就位",{"key":28,"text":677,"correct":22},"设置门锁装置",{"key":31,"text":679,"correct":26},"设备进场验收",{"key":34,"text":681,"correct":26},"清理底坑",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":470,"analysis":37},1113794,"自动扶梯必须自动停止运行的情况有（ ）。",[686,688,690,692,694],{"key":20,"text":687,"correct":26},"踏板过载",{"key":24,"text":689,"correct":26},"踏板断裂",{"key":28,"text":691,"correct":22},"踏板上有垃圾",{"key":31,"text":693,"correct":26},"非操纵逆转",{"key":34,"text":695,"correct":26},"踏板下陷",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":710,"analysis":37},1113795,"施工单位在电梯安装前书面告知中提交的材料有（ ）。",[700,702,704,706,708],{"key":20,"text":701,"correct":26},"施工单位资格证件",{"key":24,"text":703,"correct":26},"施工人员资格证件",{"key":28,"text":705,"correct":26},"施工组织与技术方案",{"key":31,"text":707,"correct":26},"工程合同",{"key":34,"text":709,"correct":22},"施工记录","ABCD",{"id":712,"libraryId":5,"type":15,"typeLabel":16,"stem":713,"options":714,"answer":497,"analysis":37},1113796,"曳引式电梯的主参数包括（ ）。",[715,717,719,721,723],{"key":20,"text":716,"correct":22},"额定曳引力",{"key":24,"text":718,"correct":22},"额定载人数",{"key":28,"text":720,"correct":26},"额定载重量",{"key":31,"text":722,"correct":26},"额定速度",{"key":34,"text":724,"correct":22},"轿厢尺寸",{"id":726,"libraryId":5,"type":15,"typeLabel":16,"stem":727,"options":728,"answer":710,"analysis":37},1113797,"自动扶梯的随机文件应该有（ ）等。",[729,731,733,734,736],{"key":20,"text":730,"correct":26},"土建布置图",{"key":24,"text":732,"correct":26},"电气原理图",{"key":28,"text":343,"correct":26},{"key":31,"text":735,"correct":26},"使用维护说明书",{"key":34,"text":737,"correct":22},"安装方案",[739,743,746,749,752,755],{"id":740,"name":741,"category":7,"favorite":742},1,"领导干部任职前廉政法规知识测试题",92,{"id":744,"name":745,"category":7,"favorite":740},595,"建筑结构与设备",{"id":747,"name":748,"category":7,"favorite":740},715,"招标采购专业知识与法律法规",{"id":750,"name":751,"category":7,"favorite":740},848,"市政方向-通用基础",{"id":753,"name":754,"category":7,"favorite":8},534,"BIM工程师",{"id":756,"name":754,"category":7,"favorite":8},535]