[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-36":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":725},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,36,50,2160,[13,38,53,68,83,97,108,123,135,150,164,179,193,208,223,235,250,263,277,291,305,319,334,349,363,378,392,406,420,435,450,464,478,488,502,513,527,541,555,570,584,598,612,627,641,655,669,683,697,711],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1113638,2,"多选题","关于锅炉试运行说法，正确的是（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","必须是在烘炉煮炉合格后进行",true,{"key":24,"text":25,"correct":26},"B","锅炉启动时升压应迅速",false,{"key":28,"text":29,"correct":22},"C","升压速度应控制",{"key":31,"text":32,"correct":26},"D","检查各联箱、锅筒是否有泄露",{"key":34,"text":35,"correct":22},"E","观察各钢架支架热膨胀及其位移是否正常","ACE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1113639,"锅炉在运行前利用化学药剂进行煮炉的目的，是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"防止蒸汽品质恶化",{"key":24,"text":45,"correct":22},"避免受热面结垢影响传热",{"key":28,"text":47,"correct":22},"避免受热面被烧坏",{"key":31,"text":49,"correct":26},"减轻受热面的自重",{"key":34,"text":51,"correct":26},"检查蒸汽管路是否泄漏","ABC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1113640,"锅炉本体设备主要由锅和炉两大部分组成，其中的“炉”包括（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"炉膛",{"key":24,"text":60,"correct":26},"省煤器",{"key":28,"text":62,"correct":22},"预热器",{"key":31,"text":64,"correct":22},"燃烧器",{"key":34,"text":66,"correct":22},"烟道","ACDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1113641,"电站汽轮机除本体外，还包括（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"凝结水系统设备",{"key":24,"text":75,"correct":22},"蒸汽系统设备",{"key":28,"text":77,"correct":26},"引送风设备",{"key":31,"text":79,"correct":22},"给水系统设备",{"key":34,"text":81,"correct":26},"吹灰设备","ABD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":67,"analysis":37},1113642,"轴系对轮中心找正时，应做到（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"以低压转子为基准",{"key":24,"text":90,"correct":26},"汽轮机的高、中、低压缸都已就位",{"key":28,"text":92,"correct":22},"对轮找中心都以全实缸、凝汽器灌水至模拟运行状态进行调整",{"key":31,"text":94,"correct":22},"各对轮找中时的开口和高低差要有预留值",{"key":34,"text":96,"correct":22},"在各不同阶段要进行多次对轮中心的复查和找正",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":52,"analysis":37},1113643,"电站锅炉中的锅是由汽包以及（ ）等组成。",[101,103,105,106,107],{"key":20,"text":102,"correct":22},"再热器",{"key":24,"text":104,"correct":22},"过热器",{"key":28,"text":60,"correct":22},{"key":31,"text":62,"correct":26},{"key":34,"text":64,"correct":26},{"id":109,"libraryId":5,"type":15,"typeLabel":16,"stem":110,"options":111,"answer":122,"analysis":37},1113644,"汽轮机本体的安装内容包括（ ）。",[112,114,116,118,120],{"key":20,"text":113,"correct":26},"汽缸、隔板、转子、轴承、主汽阀的检查",{"key":24,"text":115,"correct":22},"凝汽器的安装",{"key":28,"text":117,"correct":26},"本体附件安装",{"key":31,"text":119,"correct":22},"轴承座的就位",{"key":34,"text":121,"correct":22},"汽缸下部汽管道连接","BDE",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":134,"analysis":37},1113645,"汽包是将锅炉各部分受热面包括（ ）等连接在一起的构件。",[127,129,131,132,133],{"key":20,"text":128,"correct":22},"下降管",{"key":24,"text":130,"correct":22},"水冷壁",{"key":28,"text":104,"correct":22},{"key":31,"text":60,"correct":22},{"key":34,"text":62,"correct":26},"ABCD",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":149,"analysis":37},1113646,"水冷壁的主要作用有（ ）。",[139,141,143,145,147],{"key":20,"text":140,"correct":22},"吸收炉膛内的高温辐射热量以加热工质",{"key":24,"text":142,"correct":22},"使烟气得到冷却",{"key":28,"text":144,"correct":22},"可以保护炉墙",{"key":31,"text":146,"correct":26},"保证蒸汽品质",{"key":34,"text":148,"correct":22},"比采用对流管束节省钢材","ABCE",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":163,"analysis":37},1113647,"汽轮机设备本体安装的主要内容包括（ ）。",[154,156,157,159,161],{"key":20,"text":155,"correct":26},"检查汽缸、转子、主汽阀等零部件",{"key":24,"text":115,"correct":22},{"key":28,"text":158,"correct":22},"汽缸的就位和找中",{"key":31,"text":160,"correct":22},"转子就位、流通间隙调整、上下汽缸闭合安装",{"key":34,"text":162,"correct":26},"蒸汽管道吹扫液压轴系统冲洗","BCD",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":178,"analysis":37},1113648,"汽轮机按照工作原理划分，有（ ）.",[168,170,172,174,176],{"key":20,"text":169,"correct":26},"凝汽式汽轮机",{"key":24,"text":171,"correct":22},"冲动式汽轮机",{"key":28,"text":173,"correct":22},"反动式汽轮机",{"key":31,"text":175,"correct":26},"轴流式汽轮机",{"key":34,"text":177,"correct":26},"抽气式汽轮机","BC",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":134,"analysis":37},1113649,"汽轮机本体主要由静止和转动两部分组成。其中转动部分有（ ）。",[183,185,187,189,191],{"key":20,"text":184,"correct":22},"动叶栅",{"key":24,"text":186,"correct":22},"叶轮",{"key":28,"text":188,"correct":22},"主轴",{"key":31,"text":190,"correct":22},"联轴器",{"key":34,"text":192,"correct":26},"轴承",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":207,"analysis":37},1113650,"汽轮机台板，气缸、轴承座安装的质量控制点有（ ）。",[197,199,201,203,205],{"key":20,"text":198,"correct":22},"气缸纵横中心线、标高",{"key":24,"text":200,"correct":26},"垫铁安装位置合理",{"key":28,"text":202,"correct":22},"二次灌浆强度",{"key":31,"text":204,"correct":22},"二次灌浆密实情况",{"key":34,"text":206,"correct":26},"油系统管道清洁、畅通","ACD",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":222,"analysis":37},1113651,"锅炉蒸汽管路冲洗与吹洗的范围包括（ ）。",[212,214,216,218,220],{"key":20,"text":213,"correct":22},"锅炉过热器",{"key":24,"text":215,"correct":26},"锅炉预热器",{"key":28,"text":217,"correct":26},"给水管道系统",{"key":31,"text":219,"correct":22},"减温水管系统",{"key":34,"text":221,"correct":22},"锅炉过热蒸汽管道","ADE",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":82,"analysis":37},1113652,"汽轮发电机系统设备主要包括（ ）。",[227,229,231,232,234],{"key":20,"text":228,"correct":22},"励磁机",{"key":24,"text":230,"correct":22},"发电机",{"key":28,"text":104,"correct":26},{"key":31,"text":233,"correct":22},"凝汽器",{"key":34,"text":60,"correct":26},{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":249,"analysis":37},1113653,"发电机按照结构形式划分（ ）。",[239,241,243,245,247],{"key":20,"text":240,"correct":26},"汽轮式发电机",{"key":24,"text":242,"correct":26},"水轮式发电机",{"key":28,"text":244,"correct":26},"燃气轮发电机",{"key":31,"text":246,"correct":22},"旋转磁极式发电机",{"key":34,"text":248,"correct":22},"旋转电枢式发电机","DE",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":207,"analysis":37},1113654,"汽轮机安装质量控制点中，台板、汽缸、轴承座安装的质量控制有（ ）。",[254,256,258,260,261],{"key":20,"text":255,"correct":22},"汽缸纵横中心线，标高",{"key":24,"text":257,"correct":26},"垫铁位置合理",{"key":28,"text":259,"correct":22},"二次灌浆的强度",{"key":31,"text":204,"correct":22},{"key":34,"text":262,"correct":26},"油系统管道清洗、畅通",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":207,"analysis":37},1113655,"关于汽轮机汽缸扣盖安装技术要点的表述中，正确的是（ ）。",[267,269,271,273,275],{"key":20,"text":268,"correct":22},"扣盖工作应连续进行，不得中断",{"key":24,"text":270,"correct":26},"汽轮机正式扣盖之前，应试扣后将内部零部件全部装齐",{"key":28,"text":272,"correct":22},"试扣空缸要求在自由状态下0.05mm塞尺不入",{"key":31,"text":274,"correct":22},"试扣前应用压缩空气吹扫汽缸内各部件及其空隙",{"key":34,"text":276,"correct":26},"螺栓紧固一次性到位",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":163,"analysis":37},1113656,"发电机转子安装技术要点包括（ ）。",[281,283,285,287,289],{"key":20,"text":282,"correct":26},"转子穿装后进行单独气密性试验",{"key":24,"text":284,"correct":22},"气密性试验消除泄漏后，应再经漏气量试验",{"key":28,"text":286,"correct":22},"在完成机务、电气与热工仪表的各项工作后穿转子",{"key":31,"text":288,"correct":22},"对定子和转子进行最后清扫检查",{"key":34,"text":290,"correct":26},"转子穿装方法按设计要求进行",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":67,"analysis":37},1113657,"关于工业小型汽轮机转子安装技术要点的说法中，正确的有（ ）。",[295,297,299,301,303],{"key":20,"text":296,"correct":22},"转子安装可以分为转子吊装、转子测量和转子、汽缸找中心",{"key":24,"text":298,"correct":26},"低压缸排汽口与凝汽器采用刚性中间连接段连接",{"key":28,"text":300,"correct":22},"转子吊装应使用有制造厂提供并具备出厂试验证书的专用横梁和吊索",{"key":31,"text":302,"correct":22},"汽轮机正式扣盖之前，应将内部零部件全部装齐后进行试扣",{"key":34,"text":304,"correct":22},"转子测量应包括：轴颈圆度、圆柱度的测量、转子跳动测量（径向、端面和推力盘不平度）、转子水平度测量",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":249,"analysis":37},1113659,"钢网架结构要求所测定挠度值不应超过相应设计值的1.15倍，挠度值测量应分别在工序（ ）完成时进行。",[309,311,313,315,317],{"key":20,"text":310,"correct":26},"地面组装",{"key":24,"text":312,"correct":26},"装配",{"key":28,"text":314,"correct":26},"单元网格安装",{"key":31,"text":316,"correct":22},"总拼装",{"key":34,"text":318,"correct":22},"屋面工程",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":333,"analysis":37},1113660,"多层和高层钢结构的多节柱安装时，每节钢柱的定位轴线的下列导引方法中，不正确的有（ ）。",[323,325,327,329,331],{"key":20,"text":324,"correct":26},"从地面控制轴线直接引上",{"key":24,"text":326,"correct":22},"从中层柱的轴线引上",{"key":28,"text":328,"correct":22},"从顶端控制轴线直接引下",{"key":31,"text":330,"correct":22},"从上层柱的轴线引下",{"key":34,"text":332,"correct":22},"从下层柱的轴线引上","BCDE",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":348,"analysis":37},1113662,"分段到货塔器如炼油装置的分离塔，其组对安装方式主要有（ ）。",[338,340,342,344,346],{"key":20,"text":339,"correct":22},"卧装",{"key":24,"text":341,"correct":22},"由下至上逐段组对安装",{"key":28,"text":343,"correct":26},"散装",{"key":31,"text":345,"correct":26},"倒装",{"key":34,"text":347,"correct":26},"顶升法组对安装","AB",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":134,"analysis":37},1113663,"钢制储罐建造完毕进行充水试验检查的项目有（ ）。",[353,355,357,359,361],{"key":20,"text":354,"correct":22},"罐底严密性",{"key":24,"text":356,"correct":22},"罐壁强度及严密性",{"key":28,"text":358,"correct":22},"固定顶稳定性",{"key":31,"text":360,"correct":22},"浮顶升降试验",{"key":34,"text":362,"correct":26},"罐壁的局部凹凸变形",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":377,"analysis":37},1113664,"下列钢制容器中，属于《特种设备名录》的是（ ）。",[367,369,371,373,375],{"key":20,"text":368,"correct":22},"氧气瓶",{"key":24,"text":370,"correct":22},"氩气瓶",{"key":28,"text":372,"correct":26},"城市供热水交换器",{"key":31,"text":374,"correct":26},"LNG低温储罐",{"key":34,"text":376,"correct":22},"锅炉汽包","ABE",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":377,"analysis":37},1113665,"下列压力容器中，属于特种设备目录压力容器类别的是（ ）。",[382,384,386,388,390],{"key":20,"text":383,"correct":22},"固定式压力容器",{"key":24,"text":385,"correct":22},"移动式压力容器",{"key":28,"text":387,"correct":26},"超高压容器",{"key":31,"text":389,"correct":26},"汽车罐车",{"key":34,"text":391,"correct":22},"气瓶",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":82,"analysis":37},1113666,"压力容器设备按工艺过程中的作用不同分（ ）。",[396,398,400,402,404],{"key":20,"text":397,"correct":22},"反应容器",{"key":24,"text":399,"correct":22},"分离容器",{"key":28,"text":401,"correct":26},"板式塔",{"key":31,"text":403,"correct":22},"贮运容器",{"key":34,"text":405,"correct":26},"填料塔",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":163,"analysis":37},1113667,"球形罐根据（ ）等确定是否进行焊后整体热处理。",[410,412,414,416,418],{"key":20,"text":411,"correct":26},"安装要求",{"key":24,"text":413,"correct":22},"设计图样要求",{"key":28,"text":415,"correct":22},"盛装介质",{"key":31,"text":417,"correct":22},"材料",{"key":34,"text":419,"correct":26},"现场条件",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":434,"analysis":37},1113668,"《钢结构工程施工质量验收规范》规定，钢材的切割面或剪切面，不允许存在的缺陷有（ ）。",[424,426,428,430,432],{"key":20,"text":425,"correct":26},"卷边",{"key":24,"text":427,"correct":26},"切痕",{"key":28,"text":429,"correct":22},"裂纹",{"key":31,"text":431,"correct":22},"夹渣",{"key":34,"text":433,"correct":22},"分层","CDE",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":449,"analysis":37},1113670,"自动化仪表调校室应避开（ ）的地方。",[439,441,443,445,447],{"key":20,"text":440,"correct":22},"振动大",{"key":24,"text":442,"correct":22},"灰尘多",{"key":28,"text":444,"correct":26},"阳光直射",{"key":31,"text":446,"correct":22},"噪声大",{"key":34,"text":448,"correct":22},"强磁场","ABDE",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":67,"analysis":37},1113671,"安装取源部件的开孔和焊接必须在工艺管道的（ ）前进行。",[454,456,458,460,462],{"key":20,"text":455,"correct":22},"压力试验",{"key":24,"text":457,"correct":26},"预制",{"key":28,"text":459,"correct":22},"防腐",{"key":31,"text":461,"correct":22},"衬里",{"key":34,"text":463,"correct":22},"吹扫",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":36,"analysis":37},1113672,"仪表设备安装应遵循的原则是（ ）。",[468,470,472,474,476],{"key":20,"text":469,"correct":22},"先里后外",{"key":24,"text":471,"correct":26},"先外后里",{"key":28,"text":473,"correct":22},"先高后低",{"key":31,"text":475,"correct":26},"先低后高",{"key":34,"text":477,"correct":22},"先重后轻",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":134,"analysis":37},1113673,"工艺管道上取源部件的开孔与焊接必须在（ ）前进行。",[482,483,484,485,486],{"key":20,"text":459,"correct":22},{"key":24,"text":461,"correct":22},{"key":28,"text":463,"correct":22},{"key":31,"text":455,"correct":22},{"key":34,"text":487,"correct":26},"调整",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":36,"analysis":37},1113674,"仪表安装一般要求有（ ）。",[492,494,496,498,500],{"key":20,"text":493,"correct":22},"对仪表进行绝缘电阻测量时应有防止电子元件被损坏的措施",{"key":24,"text":495,"correct":26},"仪表上接线箱（盒）应采取密封措施，引入口宜朝上",{"key":28,"text":497,"correct":22},"测温元件安装在易受被测物料强烈冲击的位置，应采取防弯曲措施",{"key":31,"text":499,"correct":26},"节流件必须在管道吹洗前安装，其安装方向要符合要求",{"key":34,"text":501,"correct":22},"涡轮流量计的信号线应使用屏蔽线",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":36,"analysis":37},1113675,"仪表设备安装一般要求有（ ）。",[506,507,509,510,511],{"key":20,"text":493,"correct":22},{"key":24,"text":508,"correct":26},"仪表上接线盒应采取密封措施，引入口宜朝上",{"key":28,"text":497,"correct":22},{"key":31,"text":499,"correct":26},{"key":34,"text":512,"correct":22},"质量流量计应安装于被测流体完全充满的水平管道上",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":134,"analysis":37},1113676,"铜管道上安装分析取源部件的要求有（ ）。",[517,519,521,523,525],{"key":20,"text":518,"correct":22},"避开焊缝及其边缘",{"key":24,"text":520,"correct":22},"采用机械加工的方法开孔",{"key":28,"text":522,"correct":22},"液体取样点的方位在管道的下半部与管道的水平中心线成0~45°夹角的范围内",{"key":31,"text":524,"correct":22},"取样点的周围不应有物料堵塞或非生产过程的化学反应",{"key":34,"text":526,"correct":26},"取样点应选在层流、涡流区域",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":134,"analysis":37},1113677,"仪表管道的类型有（ ）。",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"测量管道",{"key":24,"text":534,"correct":22},"气源管道",{"key":28,"text":536,"correct":22},"液压管道",{"key":31,"text":538,"correct":22},"伴热管道",{"key":34,"text":540,"correct":26},"蒸汽管道",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":333,"analysis":37},1113678,"分析取源部件的取样点的周围不应有（ ）和物料堵塞或非生产过程的化学反应。",[545,547,549,551,553],{"key":20,"text":546,"correct":26},"紊流",{"key":24,"text":548,"correct":22},"空气渗入",{"key":28,"text":550,"correct":22},"层流",{"key":31,"text":552,"correct":22},"死角",{"key":34,"text":554,"correct":22},"涡流",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":569,"analysis":37},1113679,"仪表安装前的校准和试验应在室内进行，仪表调校室的设置应符合的要求中，正确的有（ ）。",[559,561,563,565,567],{"key":20,"text":560,"correct":26},"室内封闭",{"key":24,"text":562,"correct":22},"湿度不大于85%",{"key":28,"text":564,"correct":22},"温度为10~35℃",{"key":31,"text":566,"correct":26},"避光",{"key":34,"text":568,"correct":22},"无磁场干扰","BCE",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":178,"analysis":37},1113680,"自动化测量仪表等精密设备宜存放在（ ）的保温库内。",[574,576,578,580,582],{"key":20,"text":575,"correct":26},"温度为5～35℃",{"key":24,"text":577,"correct":22},"温度为5～40℃",{"key":28,"text":579,"correct":22},"相对湿度不大于80%",{"key":31,"text":581,"correct":26},"温度为10～40℃",{"key":34,"text":583,"correct":26},"相对湿度不大于85%",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":134,"analysis":37},1113681,"自动化仪表工程的施工原则是（ ）。",[588,590,592,594,596],{"key":20,"text":589,"correct":22},"先土建后安装",{"key":24,"text":591,"correct":22},"先地下后地上",{"key":28,"text":593,"correct":22},"先安装设备再配管布线",{"key":31,"text":595,"correct":22},"先两端后中间",{"key":34,"text":597,"correct":26},"先控制室仪表后就地仪表",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":134,"analysis":37},1113682,"自动化仪表工程施工程序中，仪表管道安装后的试验内容有（ ）。",[602,604,606,608,610],{"key":20,"text":603,"correct":22},"仪表电源设备试验",{"key":24,"text":605,"correct":22},"综合控制系统试验",{"key":28,"text":607,"correct":22},"回路试验",{"key":31,"text":609,"correct":22},"系统试验",{"key":34,"text":611,"correct":26},"交接试验",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":626,"analysis":37},1113683,"电磁流量计安装，应符合的规定有（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":22},"流量计外壳、被测流体和管道连接法兰之间应等电位接地连接",{"key":24,"text":619,"correct":26},"在垂直的管道上安装时，被测流体的流向应自上而下",{"key":28,"text":621,"correct":26},"在水平的管道上安装时，两个测量电极在管道的正上方",{"key":31,"text":623,"correct":26},"在水平的管道上安装时，两个测量电极在管道的正下方",{"key":34,"text":625,"correct":22},"流量计上游直管段长度应符合设计文件规定","AE",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":134,"analysis":37},1113684,"就地仪表安装位置的要求有（ ）。",[631,633,635,637,639],{"key":20,"text":632,"correct":22},"操作和维护方便",{"key":24,"text":634,"correct":22},"便于观察示值",{"key":28,"text":636,"correct":22},"无腐蚀性气体",{"key":31,"text":638,"correct":22},"无强电磁场干扰",{"key":34,"text":640,"correct":26},"能真实反映检测元件的输入变量",{"id":642,"libraryId":5,"type":15,"typeLabel":16,"stem":643,"options":644,"answer":36,"analysis":37},1113686,"下列关于捆扎法捆扎方式的说法，正确的有（ ）。",[645,647,649,651,653],{"key":20,"text":646,"correct":22},"不得采用螺旋式缠绕捆扎",{"key":24,"text":648,"correct":26},"每块绝热制品上的捆扎件不得多于两道",{"key":28,"text":650,"correct":22},"双层或多层绝热制品应逐层捆扎",{"key":31,"text":652,"correct":26},"钉钩位置不得布置在制品的拼缝处",{"key":34,"text":654,"correct":22},"钻孔穿挂的硬质绝热制品，其孔缝应采用矿物棉填塞",{"id":656,"libraryId":5,"type":15,"typeLabel":16,"stem":657,"options":658,"answer":52,"analysis":37},1113687,"设备保温层施工时，其保温制品的层厚大于100mm时，施工要点有（ ）",[659,661,663,665,667],{"key":20,"text":660,"correct":22},"分为两层施工",{"key":24,"text":662,"correct":22},"分为多层逐层施工",{"key":28,"text":664,"correct":22},"各层的厚度宜接近",{"key":31,"text":666,"correct":26},"保温层拼缝宽度不应大于50mm",{"key":34,"text":668,"correct":26},"分为单层施工",{"id":670,"libraryId":5,"type":15,"typeLabel":16,"stem":671,"options":672,"answer":163,"analysis":37},1113688,"设备、管道隔热层的金属保护层施工中，（ ）要求将其金属保护层分段固定在支承件上。",[673,675,677,679,681],{"key":20,"text":674,"correct":26},"支座距离大的卧式设备",{"key":24,"text":676,"correct":22},"立式设备",{"key":28,"text":678,"correct":22},"垂直管道",{"key":31,"text":680,"correct":22},"斜度大于45°的斜立管道",{"key":34,"text":682,"correct":26},"大跨度水平管道",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":122,"analysis":37},1113689,"塑料衬里若采用氟塑料板成型，宜选用的方法有（ ）。",[687,689,691,693,695],{"key":20,"text":688,"correct":26},"粘贴法",{"key":24,"text":690,"correct":22},"挤出焊",{"key":28,"text":692,"correct":26},"松衬法",{"key":31,"text":694,"correct":22},"热风焊",{"key":34,"text":696,"correct":22},"热压焊",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":434,"analysis":37},1113690,"设备、管道保冷层施工技术要求包括（ ）。",[701,703,705,707,709],{"key":20,"text":702,"correct":26},"采用层厚大于100mm的保冷制品时，应分两层或多层逐层施工",{"key":24,"text":704,"correct":26},"半硬质材料作保冷层，拼缝宽度不应大于5mm",{"key":28,"text":706,"correct":22},"保冷设备及管道上的支吊架，必须进行保冷",{"key":31,"text":708,"correct":22},"设备裙座里外均需保冷",{"key":34,"text":710,"correct":22},"设备铭牌应粘贴在保冷系统的外表面",{"id":712,"libraryId":5,"type":15,"typeLabel":16,"stem":713,"options":714,"answer":207,"analysis":37},1113691,"下列关于伸缩缝留设规定的说法，正确的有（ ）。",[715,717,719,721,723],{"key":20,"text":716,"correct":22},"采用硬质绝热制品时，应预留伸缩缝",{"key":24,"text":718,"correct":26},"两固定管架间，水平管道绝热层应至少留设两道伸缩缝",{"key":28,"text":720,"correct":22},"垂直管道伸缩缝应留在法兰下面",{"key":31,"text":722,"correct":22},"弯头两端的直管段上应各留一道伸缩缝",{"key":34,"text":724,"correct":26},"保冷层两层以上时，各层伸缩缝最少应错开80mm",[726,730,733,736,739,742],{"id":727,"name":728,"category":7,"favorite":729},1,"领导干部任职前廉政法规知识测试题",92,{"id":731,"name":732,"category":7,"favorite":727},595,"建筑结构与设备",{"id":734,"name":735,"category":7,"favorite":727},715,"招标采购专业知识与法律法规",{"id":737,"name":738,"category":7,"favorite":727},848,"市政方向-通用基础",{"id":740,"name":741,"category":7,"favorite":8},534,"BIM工程师",{"id":743,"name":741,"category":7,"favorite":8},535]