[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":728},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,35,50,2160,[13,38,53,67,82,97,112,126,140,155,169,184,199,214,228,242,254,266,281,295,310,325,340,353,368,381,393,407,421,435,445,459,474,488,502,516,531,545,559,573,588,602,616,630,644,658,672,687,701,713],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1113586,2,"多选题","电缆标志牌装设的位置有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","电缆接头处",true,{"key":24,"text":25,"correct":26},"B","电缆每隔5m处",false,{"key":28,"text":29,"correct":22},"C","电缆转弯处",{"key":31,"text":32,"correct":22},"D","电缆终端处",{"key":34,"text":35,"correct":26},"E","电缆进入管道处","ACD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1113587,"成套配电设备的安装要求包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"基础型钢的两端与接地干线应焊接牢固",{"key":24,"text":45,"correct":26},"柜体间及柜体与基础型钢间应焊接固定",{"key":28,"text":47,"correct":22},"成列安装柜体时，宜从中部开始向两边安装",{"key":31,"text":49,"correct":26},"手车推进时接地触头比主触头后接触",{"key":34,"text":51,"correct":22},"同一功能单元、同一种型式的高压电器组件能互换使用","ACE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":36,"analysis":37},1113588,"电气安装工程中，采用一次回路接线有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"隔离开关的接线",{"key":24,"text":60,"correct":26},"控制操作信号接线",{"key":28,"text":62,"correct":22},"电动机的接线",{"key":31,"text":64,"correct":22},"真空断路器的接线",{"key":34,"text":66,"correct":26},"监视仪表的接线",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1113589,"电气工程可以通电检验的条件包括（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":26},"受电系统一次回路试验合格",{"key":24,"text":74,"correct":22},"保护定值按实际要求整定完毕",{"key":28,"text":76,"correct":22},"受电系统的设备和电缆等绝缘良好",{"key":31,"text":78,"correct":22},"安全警示标志和消防设施已布置到位",{"key":34,"text":80,"correct":26},"动力回路核对相序无误","BCD",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1113590,"有关电缆沟或隧道内电缆敷设的要求说法，正确的是（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"交流单芯电力电缆，应布置在同侧支架上",{"key":24,"text":89,"correct":22},"电力电缆和控制电缆不应配置在同一层支架上",{"key":28,"text":91,"correct":22},"强电控制电缆在上，弱电控制电缆在下",{"key":31,"text":93,"correct":22},"交流三芯电力电缆在桥架上不宜超过2层",{"key":34,"text":95,"correct":26},"严禁电缆与热力管道平行敷设","ABCD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1113591,"关于母线安装的条件，正确的有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"建筑屋顶、楼板已施工完毕，且不得渗漏水，室内地面施工完毕。",{"key":24,"text":104,"correct":22},"基础、构架符合电气设计的要求，且达到允许安装的强度。",{"key":28,"text":106,"correct":26},"母线采用焊接连接时，母线应在找正及固定后，方可进行母线导体的焊接",{"key":31,"text":108,"correct":22},"母线装置所需的预留孔、预埋件符合电气设计的要求。",{"key":34,"text":110,"correct":26},"安装前应检查支持绝缘子与穿墙套管，表面应光洁、无裂纹、无破损、胶合处填料完整，试验合格","ABD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":111,"analysis":37},1113592,"电缆敷设的顺序要求有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"应从电缆布置集中点向分散点敷设",{"key":24,"text":119,"correct":22},"到同一终点的电缆最好是一次敷设",{"key":28,"text":121,"correct":26},"先敷设线路短、截面小的电缆",{"key":31,"text":123,"correct":22},"先敷设电力、动力电缆",{"key":34,"text":125,"correct":26},"先敷设控制、通讯电缆",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":81,"analysis":37},1113593,"架空线路中，常用的金具有（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":26},"卡盘",{"key":24,"text":133,"correct":22},"U字形抱箍",{"key":28,"text":135,"correct":22},"挂板",{"key":31,"text":137,"correct":22},"心形环",{"key":34,"text":139,"correct":26},"碟式绝缘子",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":154,"analysis":37},1113594,"电杆基坑施工及卡盘安装要求包括（ ）。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"35kV架空电力线路直线杆的顺线路方向位移不应超过设计档距的1%",{"key":24,"text":147,"correct":22},"卡盘安装深度允许偏差为±50mm",{"key":28,"text":149,"correct":26},"卡盘安装上平面距地面不应大于500mm",{"key":31,"text":151,"correct":26},"35kV架空电力线路基坑每填500mm时夯实一次",{"key":34,"text":153,"correct":22},"回填土后的电杆基坑培土高度应超出地面300mm","ABE",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":96,"analysis":37},1113595,"高压开关柜安全防范连锁要求有（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"防止误合、误分断路器",{"key":24,"text":162,"correct":22},"防止带电挂地线",{"key":28,"text":164,"correct":22},"防止带电合接地开关",{"key":31,"text":166,"correct":22},"防止误入带电间隔",{"key":34,"text":168,"correct":26},"防止误合隔离开关",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":183,"analysis":37},1113596,"组织新建电气系统供电，应按（ ）的顺序通电",[173,175,177,179,181],{"key":20,"text":174,"correct":26},"各系统同时试通电",{"key":24,"text":176,"correct":22},"先高压后低压",{"key":28,"text":178,"correct":22},"先干线后支线",{"key":31,"text":180,"correct":26},"通电正常后进行交接试验",{"key":34,"text":182,"correct":26},"先支线后干线","BC",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},1113597,"隔离开关的安装程序有（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"密封检查",{"key":24,"text":191,"correct":22},"开箱检查",{"key":28,"text":193,"correct":22},"操作机构安装",{"key":31,"text":195,"correct":22},"本体安装",{"key":34,"text":197,"correct":22},"调整","BCDE",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},1113598,"绝缘油加注前必须进行的程序有（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"绝缘油应经严格过滤处理",{"key":24,"text":206,"correct":26},"绝缘油要经过充分的氧化",{"key":28,"text":208,"correct":22},"电气强度试验",{"key":31,"text":210,"correct":22},"介质损失角正切值",{"key":34,"text":212,"correct":22},"色谱分析","ACDE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":154,"analysis":37},1113599,"6kV以上的橡塑电缆，应做（ ）",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"交流耐压试验",{"key":24,"text":221,"correct":22},"直流耐压试验",{"key":28,"text":223,"correct":26},"测量金属屏蔽层电阻",{"key":31,"text":225,"correct":26},"绝缘油试验",{"key":34,"text":227,"correct":22},"泄露电流测量试",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":111,"analysis":37},1113600,"电气设备保管环境条件应具备（ ）等措施。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"防火",{"key":24,"text":235,"correct":22},"防潮",{"key":28,"text":237,"correct":26},"防风",{"key":31,"text":239,"correct":22},"防尘",{"key":34,"text":241,"correct":26},"防小动物",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":52,"analysis":37},1113601,"绝缘油应经过滤处理，其（ ）试验合格后才能注入电气设备。",[246,248,250,251,253],{"key":20,"text":247,"correct":22},"电气强度",{"key":24,"text":249,"correct":26},"燃烧烈度",{"key":28,"text":210,"correct":22},{"key":31,"text":252,"correct":26},"挥发程度",{"key":34,"text":212,"correct":22},{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":198,"analysis":37},1113602,"电气装置可以通电检查的步骤有（ ）。",[258,260,262,264,265],{"key":20,"text":259,"correct":26},"建筑物全部装修完成",{"key":24,"text":261,"correct":22},"受电系统二次回路试验合格",{"key":28,"text":263,"correct":22},"保护整定值按实际要求整定完毕",{"key":31,"text":76,"correct":22},{"key":34,"text":78,"correct":22},{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":280,"analysis":37},1113603,"电缆敷设要求有（ ）",[270,272,274,276,278],{"key":20,"text":271,"correct":22},"敷设在排管内的电缆，应采用铠装电缆",{"key":24,"text":273,"correct":22},"电缆排管在敷设电缆前，应进行疏通，清除杂物及积水",{"key":28,"text":275,"correct":26},"电缆应从电缆盘的下端引出",{"key":31,"text":277,"correct":22},"排管内穿电缆时，不得损坏电缆护层，可采用无腐蚀性的润滑剂",{"key":34,"text":279,"correct":22},"穿入管中的电缆数量应符合设计要求，交流单芯电缆不得单独穿入钢管内","ABDE",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":111,"analysis":37},1113604,"关于母线安装的要求，正确的有（ ）。",[285,287,289,291,293],{"key":20,"text":286,"correct":22},"母线的接触面应涂以电力复合脂，",{"key":24,"text":288,"correct":22},"母线可以用木槌进行平整",{"key":28,"text":290,"correct":26},"母线螺孔的中心误差允许1mm",{"key":31,"text":292,"correct":22},"母线螺孔直径不应大于螺栓1mm",{"key":34,"text":294,"correct":26},"母线的螺栓应由上往下穿",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":309,"analysis":37},1113605,"油浸电力变压器的一般施工程序中，变压器就位后的工序有（ ）。",[299,301,303,305,307],{"key":20,"text":300,"correct":26},"绝缘测试",{"key":24,"text":302,"correct":26},"器身检查",{"key":28,"text":304,"correct":22},"附件安装",{"key":31,"text":306,"correct":22},"滤油注油",{"key":34,"text":308,"correct":26},"通电运行","CD",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":324,"analysis":37},1113606,"电气的交接试验注意事项包括（ ）。",[314,316,318,320,322],{"key":20,"text":315,"correct":22},"在高压试验设备和高电压引线周围，应装设遮拦并悬挂警示牌",{"key":24,"text":317,"correct":26},"不设防护栅时，最小安全距离为0.5m",{"key":28,"text":319,"correct":22},"高压试验结束后，应对直流试验设备多次放电",{"key":31,"text":321,"correct":26},"成套设备应连接一起进行耐压试验",{"key":34,"text":323,"correct":26},"断路器的交流耐压试验合闸状态即可","AC",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":339,"analysis":37},1113607,"电气装置通电检查及调整试验的具体内容包括（ ）。",[329,331,333,335,337],{"key":20,"text":330,"correct":26},"先一次回路通电检查，后二次回路检查",{"key":24,"text":332,"correct":22},"继电器和仪表等均经校验合格",{"key":28,"text":334,"correct":26},"电流互感器二次侧无短路现象",{"key":31,"text":336,"correct":22},"电压互感器二次侧无短路现象",{"key":34,"text":338,"correct":22},"回路经过绝缘电阻测定和耐压试验，绝缘电阻值均符合规定","BDE",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":324,"analysis":37},1113608,"电气装置在接通二次回路电源之前，应再次测定二次回路的（ ），确保无接地或短路存在。",[344,346,348,350,351],{"key":20,"text":345,"correct":22},"绝缘电阻",{"key":24,"text":347,"correct":26},"耐压试验",{"key":28,"text":349,"correct":22},"直流电阻",{"key":31,"text":225,"correct":26},{"key":34,"text":352,"correct":26},"泄漏电流",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":367,"analysis":37},1113609,"横担安装位置要求包括（ ）。",[357,359,361,363,365],{"key":20,"text":358,"correct":22},"10kV及以下直线杆的单横担应安装在负荷侧",{"key":24,"text":360,"correct":26},"分支杆采用双横担",{"key":28,"text":362,"correct":26},"终端杆采用单横担，应安装在负荷侧",{"key":31,"text":364,"correct":22},"边相的瓷横担不宜垂直安装",{"key":34,"text":366,"correct":22},"中相瓷横担应垂直地面","ADE",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":36,"analysis":37},1113610,"架空线路试验内容包括（ ）。",[372,374,375,377,379],{"key":20,"text":373,"correct":22},"测线路的绝缘电阻",{"key":24,"text":219,"correct":26},{"key":28,"text":376,"correct":22},"冲击合闸试验",{"key":31,"text":378,"correct":22},"测量杆塔的接地电阻值",{"key":34,"text":380,"correct":26},"泄露电流试验",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":36,"analysis":37},1113611,"直埋电缆在（ ）等处应设置明显的方位标志或标桩。",[385,386,388,389,391],{"key":20,"text":21,"correct":22},{"key":24,"text":387,"correct":26},"直线段每隔5m处",{"key":28,"text":29,"correct":22},{"key":31,"text":390,"correct":22},"电缆进入建筑物",{"key":34,"text":392,"correct":26},"电缆交叉处",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":280,"analysis":37},1113612,"电缆保护管的设置要求包括（ ）。",[397,399,401,403,405],{"key":20,"text":398,"correct":22},"电缆与各种管道、沟道交叉处需设保护管",{"key":24,"text":400,"correct":22},"电缆保护管内径大于电缆外径的1.5倍",{"key":28,"text":402,"correct":26},"电缆引入和引出建筑物，设防火套管",{"key":31,"text":404,"correct":22},"硬塑料管与热力管交叉时应穿钢套管",{"key":34,"text":406,"correct":22},"电缆保护管严禁敷设于热力管的上方",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":367,"analysis":37},1113613,"电气设备的安装要求包括（ ）。",[411,413,415,417,419],{"key":20,"text":412,"correct":22},"紧固件应采用镀锌制品或不锈钢制品",{"key":24,"text":414,"correct":26},"暂时不使用的电压互感器二次线圈应短路后再接地",{"key":28,"text":416,"correct":26},"绝缘油应经严格过滤处理后即可注入设备",{"key":31,"text":418,"correct":22},"接线端子的接触表面应平整、清洁、无氧化膜，并涂以薄层电力复合脂",{"key":34,"text":420,"correct":22},"电气设备的保护接地和工作接地要可靠",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":183,"analysis":37},1113615,"管道与承受附加荷载的动设备连接前，应在自由状态下检验法兰的（ ），偏差应符合规定要求。",[425,427,429,431,433],{"key":20,"text":426,"correct":26},"同轴度",{"key":24,"text":428,"correct":22},"同心度",{"key":28,"text":430,"correct":22},"平行度",{"key":31,"text":432,"correct":26},"垂直度",{"key":34,"text":434,"correct":26},"倾斜度",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":324,"analysis":37},1113616,"管道与设备连接前，应在自由状态下检验法兰的（ ），偏差应符合规定要求。",[439,440,442,443,444],{"key":20,"text":428,"correct":22},{"key":24,"text":441,"correct":26},"平面度",{"key":28,"text":430,"correct":22},{"key":31,"text":432,"correct":26},{"key":34,"text":434,"correct":26},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":183,"analysis":37},1113617,"管道元件及材料的产品合格证包括的内容有（ ）。",[449,451,453,455,457],{"key":20,"text":450,"correct":26},"制造厂名称及制造日期",{"key":24,"text":452,"correct":22},"产品名称、编号、",{"key":28,"text":454,"correct":22},"规格型号",{"key":31,"text":456,"correct":26},"化学成分",{"key":34,"text":458,"correct":26},"无损检测结果",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":473,"analysis":37},1113618,"在压力试验前，需经建设单位和有关部门复查的资料包括（ ）。",[463,465,467,469,471],{"key":20,"text":464,"correct":22},"管道元件的质量证明文件",{"key":24,"text":466,"correct":22},"管道组成件的检验或试验记录",{"key":28,"text":468,"correct":22},"管道安装记录",{"key":31,"text":470,"correct":26},"技术交底记录",{"key":34,"text":472,"correct":26},"焊工合格证","ABC",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":81,"analysis":37},1113619,"管道系统压力试验前应具备的条件有（ ）。",[478,480,482,484,486],{"key":20,"text":479,"correct":26},"管道安装工程均已按设计图纸全部完成",{"key":24,"text":481,"correct":22},"试验用的压力表在周检期内并已经校验，其精度符合规定要求",{"key":28,"text":483,"correct":22},"管道已按试验要求进行了加固",{"key":31,"text":485,"correct":22},"待试管道与无关系统已采用盲板或其他隔离措施隔开",{"key":34,"text":487,"correct":26},"试验方案已制定",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":280,"analysis":37},1113620,"阀门安装前检验内容及要求包括（ ）。",[492,494,496,498,500],{"key":20,"text":493,"correct":22},"阀杆无歪斜、变形",{"key":24,"text":495,"correct":22},"阀门应进行壳体压力试验和密封试验",{"key":28,"text":497,"correct":26},"阀门的壳体试验压力为公称压力的1.5倍",{"key":31,"text":499,"correct":22},"试验持续时间不得少于5min",{"key":34,"text":501,"correct":22},"试验介质温度为5～40℃",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":111,"analysis":37},1113621,"管道导向支架或滑动支架安装的要求有（ ）。",[506,508,510,512,514],{"key":20,"text":507,"correct":22},"滑动面应洁净平整",{"key":24,"text":509,"correct":22},"不得有歪斜和卡涩现象",{"key":28,"text":511,"correct":26},"安装位置应从支承面中心向位移相同方向偏移",{"key":31,"text":513,"correct":22},"绝热层不得妨碍其位移",{"key":34,"text":515,"correct":26},"在补偿器预拉伸之前固定",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":530,"analysis":37},1113622,"工业管道支、吊架安装时，滑动面应洁净平整，不得有歪斜和卡涩现象的管道支架有（ ）。",[520,522,524,526,528],{"key":20,"text":521,"correct":22},"导向支架",{"key":24,"text":523,"correct":26},"固定支架",{"key":28,"text":525,"correct":26},"支吊架",{"key":31,"text":527,"correct":22},"滑动支架",{"key":34,"text":529,"correct":26},"弹簧支架","AD",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":52,"analysis":37},1113623,"弹簧支、吊架中弹簧的临时固定件，如定位销等，应待系统（ ）完毕后方可拆除。",[535,537,539,541,543],{"key":20,"text":536,"correct":22},"安装",{"key":24,"text":538,"correct":26},"检查",{"key":28,"text":540,"correct":22},"试压",{"key":31,"text":542,"correct":26},"冲洗",{"key":34,"text":544,"correct":22},"绝热",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":367,"analysis":37},1113624,"工业管道系统试验的类型有（ ）。",[549,551,553,555,557],{"key":20,"text":550,"correct":22},"压力试验",{"key":24,"text":552,"correct":26},"气压试验",{"key":28,"text":554,"correct":26},"液压试验",{"key":31,"text":556,"correct":22},"泄漏性试验",{"key":34,"text":558,"correct":22},"真空度试验",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":198,"analysis":37},1113625,"关于管道系统的压力试验，说法正确的有（ ）。",[563,565,567,569,571],{"key":20,"text":564,"correct":26},"试验过程发现泄漏时，应由有资质的人员进行带压处理",{"key":24,"text":566,"correct":22},"压力试验温度严禁接近金属材料的脆性转变温度",{"key":28,"text":568,"correct":22},"脆性材料严禁使用气体进行试验",{"key":31,"text":570,"correct":22},"试验前应在膨胀节处加装临时约束装置",{"key":34,"text":572,"correct":22},"压力试验完毕，不得在管道上进行焊接或切割",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":587,"analysis":37},1113626,"管道气压试验可以根据输送介质的要求，选用试验气体介质有（ ）。",[577,579,581,583,585],{"key":20,"text":578,"correct":22},"干燥洁净的空气",{"key":24,"text":580,"correct":22},"氮气",{"key":28,"text":582,"correct":26},"氧气",{"key":31,"text":584,"correct":26},"天然气",{"key":34,"text":586,"correct":26},"CO","AB",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":111,"analysis":37},1113627,"输送下列介质的管道中，必须进行泄漏性试验的有（ ）。",[592,594,596,598,600],{"key":20,"text":593,"correct":22},"高度危害流体管道",{"key":24,"text":595,"correct":22},"剧毒流体管道",{"key":28,"text":597,"correct":26},"蒸汽管道",{"key":31,"text":599,"correct":22},"可燃流体管道",{"key":34,"text":601,"correct":26},"高压空气管道",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":198,"analysis":37},1113628,"管道系统吹扫与清洗方案应包括的内容有（ ）。",[606,608,610,612,614],{"key":20,"text":607,"correct":26},"吹洗的工作量、吹洗人员的操作技能要求",{"key":24,"text":609,"correct":22},"吹扫与清洗程序",{"key":28,"text":611,"correct":22},"吹扫与清洗介质的压力",{"key":31,"text":613,"correct":22},"检查方法、合格标准",{"key":34,"text":615,"correct":22},"安全技术措施",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":36,"analysis":37},1113629,"下列实测数据中，符合卷管制作要求的有（ ）。",[620,622,624,626,628],{"key":20,"text":621,"correct":22},"同一筒节两纵焊缝距离为200mm",{"key":24,"text":623,"correct":26},"两节组对时，相邻筒节两纵焊缝间距100mm",{"key":28,"text":625,"correct":22},"加固环对接缝与管子纵焊缝错开120mm",{"key":31,"text":627,"correct":22},"卷管端面与中心线的垂直允许偏差为管子外径的8‰",{"key":34,"text":629,"correct":26},"每米直管的平直度偏差为1.5mm",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":81,"analysis":37},1113630,"管道安装前应具备的条件包括（ ）。",[634,636,638,640,642],{"key":20,"text":635,"correct":26},"与管道有关的土建工程正在办理交接手续",{"key":24,"text":637,"correct":22},"与管道连接的设备已找正合格，固定完毕",{"key":28,"text":639,"correct":22},"管道组成件和支承件已检验合格",{"key":31,"text":641,"correct":22},"管道已完成脱脂",{"key":34,"text":643,"correct":26},"防腐或衬里施工完毕",{"id":645,"libraryId":5,"type":15,"typeLabel":16,"stem":646,"options":647,"answer":52,"analysis":37},1113631,"有关管道支、吊架安装要求，下列说法正确的有（ ）。",[648,650,652,654,656],{"key":20,"text":649,"correct":22},"固定支架应按设计文件的规定安装",{"key":24,"text":651,"correct":26},"固定支架固定前进行补偿器预拉伸",{"key":28,"text":653,"correct":22},"无热位移的管道，其吊杆应垂直安装",{"key":31,"text":655,"correct":26},"有热位移的管道，吊点沿位移方向偏位1\u002F2安装",{"key":34,"text":657,"correct":22},"弹簧的临时固定件待绝热完毕后拆除",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":183,"analysis":37},1113632,"关于管道系统压力试验的规定，正确的是（ ）。",[662,664,666,668,670],{"key":20,"text":663,"correct":26},"压力试验是以液体和气体为介质，只能检验管道强度",{"key":24,"text":665,"correct":22},"压力试验应以液体为试验介质",{"key":28,"text":667,"correct":22},"压力试验在管道安装完毕，热处理和无损检测合格后进行",{"key":31,"text":669,"correct":26},"试验前及时拆除盲板、膨胀节临时约束装置",{"key":34,"text":671,"correct":26},"脆性材料使用气体进行试验应采取有效安全措施",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":686,"analysis":37},1113633,"管道系统真空度试验的实施要点包括（ ）。",[676,678,680,682,684],{"key":20,"text":677,"correct":26},"所有管道必须进行真空度试验",{"key":24,"text":679,"correct":26},"真空度试验主要检验管道系统的强度",{"key":28,"text":681,"correct":26},"真空度试验在液压试验合格后进行",{"key":31,"text":683,"correct":22},"按设计文件规定进行24h试验",{"key":34,"text":685,"correct":22},"24h后增压率不大于5%","DE",{"id":688,"libraryId":5,"type":15,"typeLabel":16,"stem":689,"options":690,"answer":154,"analysis":37},1113635,"管道系统压力试验（气压）实施要点正确的是（ ）。",[691,693,695,697,699],{"key":20,"text":692,"correct":22},"应选用干燥洁净的空气做试验",{"key":24,"text":694,"correct":22},"试验压力应为设计压力的1.15倍",{"key":28,"text":696,"correct":26},"真空管道的试验压力应为1.0MPA",{"key":31,"text":698,"correct":26},"试验时应装有压力泄放装置，其设定压力不得高于试验压力1.15倍",{"key":34,"text":700,"correct":22},"应在试验压力下稳压10min，再将压力降至设计压力，以发泡剂检验不泄漏为合格",{"id":702,"libraryId":5,"type":15,"typeLabel":16,"stem":703,"options":704,"answer":587,"analysis":37},1113636,"管道系统气压试验，说法正确的有（ ）。",[705,707,708,709,711],{"key":20,"text":706,"correct":22},"采用的气体为干燥洁净的空气",{"key":24,"text":694,"correct":22},{"key":28,"text":696,"correct":26},{"key":31,"text":710,"correct":26},"试验时应装有压力泄放装置，其设定压力不得高于试验压力的1.15倍",{"key":34,"text":712,"correct":26},"应在试验压力下稳压30min，再将压力降至设计压力",{"id":714,"libraryId":5,"type":15,"typeLabel":16,"stem":715,"options":716,"answer":727,"analysis":37},1113637,"管道穿越墙体、楼板或构筑物所设套管应符合的规定有（ ）。",[717,719,721,723,725],{"key":20,"text":718,"correct":26},"套管内焊缝强度足够",{"key":24,"text":720,"correct":26},"穿过墙体的套管长度超出墙体50mm",{"key":28,"text":722,"correct":22},"穿过楼板的套管应高出楼面50mm",{"key":31,"text":724,"correct":22},"穿过屋面的管道应设置防水肩和防雨帽",{"key":34,"text":726,"correct":22},"管道与套管之间应填塞对管道无害的不燃材料","CDE",[729,733,736,739,742,745],{"id":730,"name":731,"category":7,"favorite":732},1,"领导干部任职前廉政法规知识测试题",92,{"id":734,"name":735,"category":7,"favorite":730},595,"建筑结构与设备",{"id":737,"name":738,"category":7,"favorite":730},715,"招标采购专业知识与法律法规",{"id":740,"name":741,"category":7,"favorite":730},848,"市政方向-通用基础",{"id":743,"name":744,"category":7,"favorite":8},534,"BIM工程师",{"id":746,"name":744,"category":7,"favorite":8},535]