[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":736},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,31,50,2160,[13,38,53,68,83,98,113,127,142,156,170,185,199,213,224,239,254,269,284,299,314,328,343,358,372,386,401,415,429,444,458,472,486,500,514,529,543,556,570,583,598,612,625,639,654,668,681,695,708,722],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1113380,2,"多选题","生产安全事故按照等级划分为（）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","一般事故",true,{"key":24,"text":25,"correct":22},"B","较大事故",{"key":27,"text":28,"correct":29},"C","特大事故",false,{"key":31,"text":32,"correct":22},"D","重大事故",{"key":34,"text":35,"correct":22},"E","特别重大事故","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1113381,"安全检查的类型包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"日常巡查",{"key":24,"text":45,"correct":29},"自查",{"key":27,"text":47,"correct":22},"专项检查",{"key":31,"text":49,"correct":29},"互查",{"key":34,"text":51,"correct":22},"季节性检查","ACE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1113382,"危险源清单的内容一般包括（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"危险源名称性质",{"key":24,"text":60,"correct":22},"风险评价",{"key":27,"text":62,"correct":22},"可能影响的后果",{"key":31,"text":64,"correct":22},"需采取的对策",{"key":34,"text":66,"correct":29},"事故处理的情况","ABCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1113383,"施工单位应当在施工组织设计中（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"制订安全管理计划",{"key":24,"text":75,"correct":29},"制订职业健康管理计划",{"key":27,"text":77,"correct":22},"编制安全技术措施",{"key":31,"text":79,"correct":29},"建立安全生产组织与责任体系",{"key":34,"text":81,"correct":22},"施工现场临时用电方案","CE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1113384,"内部沟通协调的主要方法包括（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"定期召开协调会",{"key":24,"text":90,"correct":22},"利用巡检深入班组随时交流与沟通",{"key":27,"text":92,"correct":29},"建立协调调度室或设立调度员",{"key":31,"text":94,"correct":29},"项目经理指令",{"key":34,"text":96,"correct":22},"定期通报现场信息","ABE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1113385,"绿色施工的土壤保护措施包括（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"因施工造成的裸土应及时覆盖",{"key":24,"text":105,"correct":29},"现场道路.加工区.材料堆放区宜及时进行地面硬化",{"key":27,"text":107,"correct":29},"采用隔水性能好的边坡支护技术",{"key":31,"text":109,"correct":22},"污水处理设施等不发生堵塞.渗漏.溢出等现象",{"key":34,"text":111,"correct":22},"施工后应恢复施工活动破坏的植被","ADE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":112,"analysis":37},1113386,"下列沟通协调内容中，属于施工资源配备协调的有（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"设备材料有序供应",{"key":24,"text":120,"correct":29},"专业管线综合布置",{"key":27,"text":122,"correct":29},"施工垃圾分类堆放",{"key":31,"text":124,"correct":22},"施工机具优化配置",{"key":34,"text":126,"correct":22},"工程资金合理分配",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1113387,"绿色施工是指工程建设中，在保证质量、安全等基本要求的前提下，实现节能、节地、（ ）和环境保护。",[131,133,135,137,139],{"key":20,"text":132,"correct":29},"节资金",{"key":24,"text":134,"correct":29},"节资源",{"key":27,"text":136,"correct":22},"节水",{"key":31,"text":138,"correct":22},"节材",{"key":34,"text":140,"correct":29},"节时间","CD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":155,"analysis":37},1113388,"下述控制措施中属于建筑垃圾控制的有（）。",[146,148,149,151,153],{"key":20,"text":147,"correct":22},"运送土方、垃圾、设备及建筑材料时，不应污损道路",{"key":24,"text":103,"correct":22},{"key":27,"text":150,"correct":22},"施工场地生活垃圾实行袋装化，及时清运",{"key":31,"text":152,"correct":22},"垃圾回收再利用",{"key":34,"text":154,"correct":22},"地面造成污染应及时进行清理","ABCDE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":67,"analysis":37},1113389,"按建筑安装工程费用构成要素划分，建筑安装工程费包括（）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"人工费",{"key":24,"text":163,"correct":22},"材料费",{"key":27,"text":165,"correct":22},"机械费",{"key":31,"text":167,"correct":22},"企业管理费",{"key":34,"text":169,"correct":29},"措施项目费",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},1113390,"下列属于项目施工成本控制方法的有（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"以施工图控制成本",{"key":24,"text":177,"correct":29},"以投标图控制成本",{"key":27,"text":179,"correct":22},"安装工程费的动态控制",{"key":31,"text":181,"correct":22},"工期成本的动态控制",{"key":34,"text":183,"correct":22},"施工成本偏差控制","ACDE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":36,"analysis":37},1113391,"机电工程施工中材料成本的控制内容有（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"加强材料采购成本的管理",{"key":24,"text":192,"correct":22},"加强限额发料的管理",{"key":27,"text":194,"correct":29},"强化作业人员的技术素质",{"key":31,"text":196,"correct":22},"控制施工中材料消耗",{"key":34,"text":198,"correct":22},"从量差和价差的方面控制",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":36,"analysis":37},1113392,"项目成本控制的原则包括（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"成本最低化原则",{"key":24,"text":206,"correct":22},"全面成本控制原则",{"key":27,"text":208,"correct":29},"按实控制原则",{"key":31,"text":210,"correct":22},"动态控制原则",{"key":34,"text":212,"correct":22},"责权利相结合原则",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":67,"analysis":37},1113393,"施工成本控制应遵循的原则有（）。",[217,218,219,220,222],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":22},{"key":27,"text":210,"correct":22},{"key":31,"text":221,"correct":22},"责权利相结合的原则",{"key":34,"text":223,"correct":29},"静态控制原则",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":238,"analysis":37},1113394,"根据《建设工程质量管理条例》规定，保修期最低2年的工程有（ ）。",[228,230,232,234,236],{"key":20,"text":229,"correct":22},"设备安装",{"key":24,"text":231,"correct":22},"电气管线",{"key":27,"text":233,"correct":29},"供热系统",{"key":31,"text":235,"correct":29},"屋面防水",{"key":34,"text":237,"correct":29},"地基基础","AB",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":253,"analysis":37},1113395,"在保修期内对于用户投诉的处理，正确的做法有（ ）。",[243,245,247,249,251],{"key":20,"text":244,"correct":22},"应迅速及时处理，切勿拖延",{"key":24,"text":246,"correct":22},"认真调查分析，做出适当处理",{"key":27,"text":248,"correct":22},"对投诉进行友好解释和答复",{"key":31,"text":250,"correct":29},"对投诉有误的可不作解释",{"key":34,"text":252,"correct":29},"非施工单位责任可拒绝处理","ABC",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":268,"analysis":37},1113396,"工程竣工结算价款中，应扣除的款项包括（ ）。",[258,260,262,264,266],{"key":20,"text":259,"correct":29},"合同价款",{"key":24,"text":261,"correct":29},"工程量变更增加的预算",{"key":27,"text":263,"correct":29},"合同价款调整数额",{"key":31,"text":265,"correct":22},"预付款",{"key":34,"text":267,"correct":22},"质量保证金","DE",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":283,"analysis":37},1113397,"竣工验收的依据中，指导建设管理行为的依据包括（ ）。",[273,275,277,279,281],{"key":20,"text":274,"correct":29},"上级主管部门批准的可行性研究报告",{"key":24,"text":276,"correct":22},"国家.行业有关法律.法规.规定",{"key":27,"text":278,"correct":22},"质量验收评定标准",{"key":31,"text":280,"correct":29},"有关设计文件",{"key":34,"text":282,"correct":29},"施工图纸","BC",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":298,"analysis":37},1113398,"下列竣工技术资料中，属于施工记录资料的有（ ）。",[288,290,292,294,296],{"key":20,"text":289,"correct":29},"竣工图",{"key":24,"text":291,"correct":22},"图纸会审记录",{"key":27,"text":293,"correct":22},"质量事故处理报告及记录",{"key":31,"text":295,"correct":22},"隐蔽工程验收记录",{"key":34,"text":297,"correct":29},"单位工程质量验收记录","BCD",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":313,"analysis":37},1113399,"机电工程项目单机试运行前提供的相关资料和文件有（ ）。",[303,305,307,309,311],{"key":20,"text":304,"correct":29},"试运行方案",{"key":24,"text":306,"correct":29},"安全措施方案",{"key":27,"text":308,"correct":22},"各种产品的合格证书或复验报告",{"key":31,"text":310,"correct":22},"施工记录.隐蔽工程记录和各种检验.试验合格文件",{"key":34,"text":312,"correct":22},"与单机试运行相关的电气和仪表调校合格资料等","CDE",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":238,"analysis":37},1113400,"下列情况可以不进行招标的有（）",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"涉及国家安全、国家秘密、抢险救灾等项目",{"key":24,"text":321,"correct":22},"利用扶贫资金实行以工代赈，使用农民工",{"key":27,"text":323,"correct":29},"技术复杂，只有少量潜在投标人可供选择",{"key":31,"text":325,"correct":29},"使用国际组织援助资金的项目",{"key":34,"text":327,"correct":29},"公开招标费用占项目合同金额的比例过大",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":342,"analysis":37},1113402,"下列情况中评标委员会应当否决其投标的有（）",[332,334,336,338,340],{"key":20,"text":333,"correct":22},"未对招标文件的实质性要求做出响应",{"key":24,"text":335,"correct":29},"高于招标人标底的报价",{"key":27,"text":337,"correct":22},"投标人不符合招标文件规定的资格条件",{"key":31,"text":339,"correct":22},"投标文件未按要求密封",{"key":34,"text":341,"correct":29},"开标前5分钟突然更换投标文件","ACD",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":357,"analysis":37},1113403,"（ ）属于强制检定的计量器具范围。",[347,349,351,353,355],{"key":20,"text":348,"correct":29},"超声波测厚仪",{"key":24,"text":350,"correct":22},"电能表",{"key":27,"text":352,"correct":22},"绝缘电阻表",{"key":31,"text":354,"correct":22},"接地电阻测量仪",{"key":34,"text":356,"correct":22},"测量互感器","BCDE",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":141,"analysis":37},1113404,"以下属于C类计量器具中非标准计量器具的有（ ）。",[362,364,366,368,370],{"key":20,"text":363,"correct":29},"钢直尺",{"key":24,"text":365,"correct":29},"弯尺",{"key":27,"text":367,"correct":22},"垂直检测尺",{"key":31,"text":369,"correct":22},"游标塞尺",{"key":34,"text":371,"correct":29},"钢卷尺",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":67,"analysis":37},1113405,"计量器具的使用人员应经过培训并具有相应的资格，熟悉并掌握计量检测设备的（ ）。",[376,378,380,382,384],{"key":20,"text":377,"correct":22},"性能",{"key":24,"text":379,"correct":22},"结构",{"key":27,"text":381,"correct":22},"操作规程",{"key":31,"text":383,"correct":22},"使用要求",{"key":34,"text":385,"correct":29},"重量",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":400,"analysis":37},1113406,"《计量法》规定，企事业单位列入强制检定目录的工作计量器具包括（）。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"医疗卫生",{"key":24,"text":393,"correct":22},"贸易结算",{"key":27,"text":395,"correct":22},"安全防护",{"key":31,"text":397,"correct":29},"质量监测.",{"key":34,"text":399,"correct":22},"环境监测","ABCE",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":36,"analysis":37},1113407,"使用计量标准器具必须具备的条件是（）。",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"经计量检定合格",{"key":24,"text":408,"correct":22},"具有正常工作所需要的环境条件",{"key":27,"text":410,"correct":29},"质量、环境、安全三项体系认证通过.",{"key":31,"text":412,"correct":22},"具有称职的保存、维护、使用人员",{"key":34,"text":414,"correct":22},"具有完善的管理制度",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":36,"analysis":37},1113408,"应当依照规定的程序办理手续的用电行为有（ ）。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"申请新装用电",{"key":24,"text":422,"correct":22},"临时用电",{"key":27,"text":424,"correct":29},"永久用电",{"key":31,"text":426,"correct":22},"增加用电容量",{"key":34,"text":428,"correct":22},"变更用电和终止用电",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":443,"analysis":37},1113409,"下列设备中，属于特种设备的有（ ）。",[433,435,437,439,441],{"key":20,"text":434,"correct":22},"6层6站乘客电梯",{"key":24,"text":436,"correct":29},"热水换热器",{"key":27,"text":438,"correct":29},"高压水泵",{"key":31,"text":440,"correct":29},"35KV变压器",{"key":34,"text":442,"correct":22},"30t桥式起重机","AE",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":357,"analysis":37},1113410,"特种设备的开工告知方式有（ ）。",[448,450,452,454,456],{"key":20,"text":449,"correct":29},"电话告知",{"key":24,"text":451,"correct":22},"电子邮件告知",{"key":27,"text":453,"correct":22},"网上告知",{"key":31,"text":455,"correct":22},"挂号邮寄",{"key":34,"text":457,"correct":22},"派人送达",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":357,"analysis":37},1113411,"特种设备出厂时，应当附有（ ）等文件。",[462,464,466,468,470],{"key":20,"text":463,"correct":29},"营业执照",{"key":24,"text":465,"correct":22},"安全技术规范要求的设计文件",{"key":27,"text":467,"correct":22},"产品质量合格证明",{"key":31,"text":469,"correct":22},"安装及使用维修说明",{"key":34,"text":471,"correct":22},"监督检验证明",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":283,"analysis":37},1113412,"对未经许可从事特种设备制造、安装、改造活动的处罚包括（ ）。",[476,478,480,482,484],{"key":20,"text":477,"correct":29},"由特种设备检验检测机构予以取缔，没收非法制造的产品",{"key":24,"text":479,"correct":22},"已经实施安装.改造的，责令恢复原状",{"key":27,"text":481,"correct":22},"处10万元以上50万元以下罚款",{"key":31,"text":483,"correct":29},"三年内不予受理该单位制造.安装.改造许可申请",{"key":34,"text":485,"correct":29},"情节严重的，吊销生产许可证",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":67,"analysis":37},1113413,"锅炉到货后，应检查的内容有（ ）。",[490,492,494,496,498],{"key":20,"text":491,"correct":22},"生产许可证明",{"key":24,"text":493,"correct":22},"随机技术文件",{"key":27,"text":495,"correct":22},"质量文件",{"key":31,"text":497,"correct":22},"设备零部件",{"key":34,"text":499,"correct":29},"供货合同",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":141,"analysis":37},1113414,"工业安装工程分项工程质量验收合格规定包括（）。",[504,506,508,510,512],{"key":20,"text":505,"correct":29},"检验批应符合合格质量的规定",{"key":24,"text":507,"correct":29},"应具有完整施工依据、施工记录及质量检查、检验和试验记录",{"key":27,"text":509,"correct":22},"所含的检验项目（检验批）均应符合合格质量的规定",{"key":31,"text":511,"correct":22},"分项工程的质量控制资料应齐全",{"key":34,"text":513,"correct":29},"所含分项工程的质量应全部合格",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":528,"analysis":37},1113415,"单位工程完毕后，建设单位组织（ ）参加单位工程质量验收。",[518,520,522,524,526],{"key":20,"text":519,"correct":29},"设备制造单位",{"key":24,"text":521,"correct":22},"施工单位",{"key":27,"text":523,"correct":22},"设计单位",{"key":31,"text":525,"correct":29},"材料供应单位",{"key":34,"text":527,"correct":22},"监理单位","BCE",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":112,"analysis":37},1113416,"土建工程检验批的划分标准有（ ）。",[533,535,537,539,541],{"key":20,"text":534,"correct":22},"设备基础",{"key":24,"text":536,"correct":29},"建筑部位",{"key":27,"text":538,"correct":29},"施工工艺",{"key":31,"text":540,"correct":22},"楼层",{"key":34,"text":542,"correct":22},"变形缝",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":112,"analysis":37},1113417,"工业安装单位工程划分的标准有（ ）。",[547,549,551,552,554],{"key":20,"text":548,"correct":22},"工业厂房",{"key":24,"text":550,"correct":29},"专业性质",{"key":27,"text":536,"correct":29},{"key":31,"text":553,"correct":22},"车间",{"key":34,"text":555,"correct":22},"区域",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":253,"analysis":37},1113418,"工业安装工程单位工程质量验收的参与人员包括（）。",[560,562,564,566,568],{"key":20,"text":561,"correct":22},"建设单位项目负责人",{"key":24,"text":563,"correct":22},"设计单位项目负责人",{"key":27,"text":565,"correct":22},"施工单位质量技术负责人",{"key":31,"text":567,"correct":29},"监理工程师",{"key":34,"text":569,"correct":29},"施工单位专业工程师",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":253,"analysis":37},1113419,"建筑安装工程单位工程质量验收的参与人员包括（）。",[574,576,578,580,581],{"key":20,"text":575,"correct":22},"建设单位负责人",{"key":24,"text":577,"correct":22},"设计单位负责人",{"key":27,"text":579,"correct":22},"施工单位负责人",{"key":31,"text":567,"correct":29},{"key":34,"text":582,"correct":29},"施工单位质量技术工程师",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":597,"analysis":37},1113420,"建筑安装工程检验批主控项目有（ ）。",[587,589,591,593,595],{"key":20,"text":588,"correct":29},"对卫生.环境保护有较大影响的检验项目",{"key":24,"text":590,"correct":22},"确定该检验批主要性能的项目",{"key":27,"text":592,"correct":29},"无法定量采用定性的项目",{"key":31,"text":594,"correct":22},"管道的压力试验",{"key":34,"text":596,"correct":22},"保证安全和使用功能的重要检验项目","BDE",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":357,"analysis":37},1113421,"子分部工程可按（ ）进行划分。",[602,604,606,608,610],{"key":20,"text":603,"correct":29},"平面布置",{"key":24,"text":605,"correct":22},"材料种类",{"key":27,"text":607,"correct":22},"施工特点",{"key":31,"text":609,"correct":22},"施工程序",{"key":34,"text":611,"correct":22},"专业系统及类别",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":298,"analysis":37},1113422,"建筑安装工程分部工程质量验收合格规定包括（）。",[616,617,619,621,623],{"key":20,"text":505,"correct":29},{"key":24,"text":618,"correct":22},"所含分项工程的质量均应验收合格",{"key":27,"text":620,"correct":22},"观感质量验收应符合要求",{"key":31,"text":622,"correct":22},"质量控制资料应齐全",{"key":34,"text":624,"correct":29},"所含检验批的质量验收记录应完整",{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":400,"analysis":37},1113423,"电力工程包括（ ）。",[629,631,633,635,637],{"key":20,"text":630,"correct":22},"火电工程",{"key":24,"text":632,"correct":22},"送变电工程",{"key":27,"text":634,"correct":22},"核电工程",{"key":31,"text":636,"correct":29},"水电工程",{"key":34,"text":638,"correct":22},"风电工程",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":653,"analysis":37},1113424,"下列压缩机中，属于容积型往复式的有（ ）压缩机。",[643,645,647,649,651],{"key":20,"text":644,"correct":29},"滑片式",{"key":24,"text":646,"correct":22},"往复式",{"key":27,"text":648,"correct":29},"螺杆式",{"key":31,"text":650,"correct":22},"回转式",{"key":34,"text":652,"correct":29},"转子式","BD",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":298,"analysis":37},1113425,"按工作原理分类的泵有（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":29},"清水泵",{"key":24,"text":661,"correct":22},"离心泵",{"key":27,"text":663,"correct":22},"回转泵",{"key":31,"text":665,"correct":22},"往复式泵",{"key":34,"text":667,"correct":29},"多级泵",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":342,"analysis":37},1113426,"下列属于回转泵的是（ ）。",[672,674,676,678,680],{"key":20,"text":673,"correct":22},"齿轮泵",{"key":24,"text":675,"correct":29},"活塞泵",{"key":27,"text":677,"correct":22},"叶片泵",{"key":31,"text":679,"correct":22},"螺杆泵",{"key":34,"text":661,"correct":29},{"id":682,"libraryId":5,"type":15,"typeLabel":16,"stem":683,"options":684,"answer":313,"analysis":37},1113427,"风机按照按照排气压强的不同划分，可分为（ ）。",[685,687,689,691,693],{"key":20,"text":686,"correct":29},"单级风机",{"key":24,"text":688,"correct":29},"多级风机",{"key":27,"text":690,"correct":22},"通风机",{"key":31,"text":692,"correct":22},"鼓风机",{"key":34,"text":694,"correct":22},"压气机",{"id":696,"libraryId":5,"type":15,"typeLabel":16,"stem":697,"options":698,"answer":253,"analysis":37},1113428,"下列设备中，属于通用工程设备的是（ ）。",[699,701,702,704,706],{"key":20,"text":700,"correct":22},"旋涡泵",{"key":24,"text":692,"correct":22},{"key":27,"text":703,"correct":22},"提升机",{"key":31,"text":705,"correct":29},"发电机",{"key":34,"text":707,"correct":29},"换热器",{"id":709,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":711,"answer":36,"analysis":37},1113429,"决定泵性能的工作参数有（ ）。",[712,714,716,718,720],{"key":20,"text":713,"correct":22},"流量",{"key":24,"text":715,"correct":22},"扬程",{"key":27,"text":717,"correct":29},"流速",{"key":31,"text":719,"correct":22},"功率",{"key":34,"text":721,"correct":22},"效率",{"id":723,"libraryId":5,"type":15,"typeLabel":16,"stem":724,"options":725,"answer":597,"analysis":37},1113430,"风机按气体在旋转叶轮内部流动方向分为（ ）风机。",[726,728,730,732,734],{"key":20,"text":727,"correct":29},"逆流式",{"key":24,"text":729,"correct":22},"混流式",{"key":27,"text":731,"correct":29},"压气式",{"key":31,"text":733,"correct":22},"离心式",{"key":34,"text":735,"correct":22},"轴流式",[737,741,744,747,750,753],{"id":738,"name":739,"category":7,"favorite":740},1,"领导干部任职前廉政法规知识测试题",92,{"id":742,"name":743,"category":7,"favorite":738},595,"建筑结构与设备",{"id":745,"name":746,"category":7,"favorite":738},715,"招标采购专业知识与法律法规",{"id":748,"name":749,"category":7,"favorite":738},848,"市政方向-通用基础",{"id":751,"name":752,"category":7,"favorite":8},534,"BIM工程师",{"id":754,"name":752,"category":7,"favorite":8},535]