[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,3,50,2160,[13,34,46,58,70,82,93,105,116,128,140,152,164,176,188,200,212,224,235,247,259,271,283,295,307,319,331,342,354,366,378,390,402,414,426,438,450,462,474,486,498,510,521,533,545,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1111940,1,"单选题","设计压力等于10MPa的管道属于（ ）管道。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","低压",false,{"key":24,"text":25,"correct":26},"B","中压",true,{"key":28,"text":29,"correct":22},"C","高压",{"key":31,"text":32,"correct":22},"D","超高压","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1111941,"阀门的壳体试验压力为阀门在20℃时最大允许工作压力的（ ）倍，密封试验为阀门在20℃时最大允许工作压力的（ ）倍。",[38,40,42,44],{"key":20,"text":39,"correct":22},"1.1，1.1",{"key":24,"text":41,"correct":22},"1.1，1.5",{"key":28,"text":43,"correct":26},"1.5，1.1",{"key":31,"text":45,"correct":22},"1.5，1.5",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1111942,"液压试验应缓慢分段升压，待达到试验压力后，稳压（ ），再将试验压力降至设计压力，保持（ ），检查压力表有无压降、管道所有部位有无渗漏。",[50,52,54,56],{"key":20,"text":51,"correct":22},"10min，20min",{"key":24,"text":53,"correct":26},"10min，30min",{"key":28,"text":55,"correct":22},"30min，10min",{"key":31,"text":57,"correct":22},"20min，10min",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1111943,"根据管道系统不同的使用要求，主要试验不包括（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"压力试验",{"key":24,"text":65,"correct":26},"强度试验",{"key":28,"text":67,"correct":22},"泄漏性试验",{"key":31,"text":69,"correct":22},"真空度",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1111944,"不锈钢油系统管道的吹扫和清洗方法宜采用（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"蒸汽吹净后进行油清洗",{"key":24,"text":77,"correct":22},"蒸汽吹净后空气吹干",{"key":28,"text":79,"correct":22},"水冲洗后空气吹干",{"key":31,"text":81,"correct":22},"水冲洗后进行油清洗",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1111945,"检验管道系统强度和严密性的试验是（ ）。",[86,87,89,91],{"key":20,"text":63,"correct":26},{"key":24,"text":88,"correct":22},"真空度试验",{"key":28,"text":90,"correct":22},"侧漏性试验",{"key":31,"text":92,"correct":22},"致密性试验",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":31,"analysis":33},1111946,"660MW机组轴系中心找正需进行（ ）。",[97,99,101,103],{"key":20,"text":98,"correct":22},"3次",{"key":24,"text":100,"correct":22},"4次",{"key":28,"text":102,"correct":22},"5次",{"key":31,"text":104,"correct":26},"6次",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":31,"analysis":33},1111947,"锅炉本体受热面组合安装的一般程序中，设备清点检查的紧后工序是（ ）。",[109,110,112,114],{"key":20,"text":63,"correct":22},{"key":24,"text":111,"correct":22},"泄漏试验",{"key":28,"text":113,"correct":22},"灌水试验",{"key":31,"text":115,"correct":26},"通球试验",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":31,"analysis":33},1111948,"占用组合场面积多，可能会造成设备永久变形或损伤的锅炉受热面组合形式是（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":22},"整体组立",{"key":24,"text":123,"correct":22},"分解组立",{"key":28,"text":125,"correct":22},"直立式组合",{"key":31,"text":127,"correct":26},"横卧式组合",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":31,"analysis":33},1111949,"光伏组件及各部件设备采用（ ）进行固定。",[132,134,136,138],{"key":20,"text":133,"correct":22},"铆接",{"key":24,"text":135,"correct":22},"焊接",{"key":28,"text":137,"correct":22},"拼插",{"key":31,"text":139,"correct":26},"螺栓",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":31,"analysis":33},1111950,"汽轮机安装质量控制点不包括（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":22},"基础检验",{"key":24,"text":147,"correct":22},"汽缸.轴承座安装",{"key":28,"text":149,"correct":22},"油润滑系统",{"key":31,"text":151,"correct":26},"整体气密性试验",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":28,"analysis":33},1111951,"汽轮机第一次试启动的条件不包括（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"汽轮机安装完毕",{"key":24,"text":159,"correct":22},"辅机部分试运合格",{"key":28,"text":161,"correct":26},"调速保护系统启动位置调整好",{"key":31,"text":163,"correct":22},"按照制造厂的启动要求进行",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":20,"analysis":33},1111953,"下列有关锅炉试运行的说法中，错误的是（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":26},"锅炉试运行在煮炉前进行",{"key":24,"text":171,"correct":22},"锅炉试运行启动时升压应缓慢，尽量减小壁温差",{"key":28,"text":173,"correct":22},"检查人孔.焊口.法兰等部件，发现有泄漏时及时处理",{"key":31,"text":175,"correct":22},"观察各联箱.锅筒.钢架.支架等的热膨胀及其位移是否正常",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":20,"analysis":33},1111954,"光伏发电设备的安装程序中，光伏组件安装之后，应做的工作是（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":26},"汇流箱安装",{"key":24,"text":183,"correct":22},"逆变器安装",{"key":28,"text":185,"correct":22},"电气设备安装",{"key":31,"text":187,"correct":22},"调试",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},1111955,"钢制储罐的安装方法中，拱顶罐的施工常采用的方法是（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"正装法",{"key":24,"text":195,"correct":26},"倒装法",{"key":28,"text":197,"correct":22},"水浮法",{"key":31,"text":199,"correct":22},"气顶法",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":28,"analysis":33},1111956,"下列项目中，不属于钢制储罐罐体几何尺寸检查内容的是（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":22},"罐壁铅垂度偏差",{"key":24,"text":207,"correct":22},"底圈壁板内表面半径偏差",{"key":28,"text":209,"correct":26},"两极及赤道截面内直径偏差",{"key":31,"text":211,"correct":22},"罐底焊后局部凹凸变形",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":31,"analysis":33},1111957,"下列关于储罐充水试验规定的说法，错误的是（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"充水试验采用洁净水",{"key":24,"text":219,"correct":22},"试验水温不低于5℃",{"key":28,"text":221,"correct":22},"充水试验的同时进行基础沉降观测",{"key":31,"text":223,"correct":26},"放水过程中应关闭透光孔",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":28,"analysis":33},1111958,"金属构件一般在预制场制作，采用工厂化的制造方式，“部件装配”紧后的工作是（ ）。",[228,230,232,233],{"key":20,"text":229,"correct":22},"零部件加工",{"key":24,"text":231,"correct":22},"除锈",{"key":28,"text":135,"correct":26},{"key":31,"text":234,"correct":22},"油漆",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},1111959,"球罐散装法施工程序中，赤道带安装之后应做的工作是（ ）。",[239,241,243,245],{"key":20,"text":240,"correct":26},"下温带安装",{"key":24,"text":242,"correct":22},"下寒带安装",{"key":28,"text":244,"correct":22},"上温带安装",{"key":31,"text":246,"correct":22},"上寒带安装",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},1111960,"关于压力容器产品焊接试板要求，下列说法中正确的是（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"应制作纵焊缝产品焊接试板，制取试样，进行拉力.剪切和必要的冲击试验",{"key":24,"text":254,"correct":26},"现场组焊的球形储罐应制作立.横.平加仰三块产品焊接试板",{"key":28,"text":256,"correct":22},"球罐的产品焊接试板应在焊接产品之前，由施焊该球形储罐的焊工采用相同的条件和焊接工艺进行焊接",{"key":31,"text":258,"correct":22},"产品焊接试板经外观检查和射线（或超声）检测，如不合格，应返工处理",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},1111961,"低合金结构钢在环境温度低于（ ）℃时，不应进行冷矫正和冷弯曲。",[263,265,267,269],{"key":20,"text":264,"correct":26},"－12",{"key":24,"text":266,"correct":22},"－15",{"key":28,"text":268,"correct":22},"－16",{"key":31,"text":270,"correct":22},"－18",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":28,"analysis":33},1111962,"钢网架结构总拼完成后及屋面工程完成后应分别测量其挠度值，且所测的挠度值不应超过相应设计值的（ ）倍。",[275,277,279,281],{"key":20,"text":276,"correct":22},"0.5",{"key":24,"text":278,"correct":22},"1.1",{"key":28,"text":280,"correct":26},"1.15",{"key":31,"text":282,"correct":22},"1.5",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":31,"analysis":33},1111964,"下列关于仪表设备安装应遵循的程序，说法错误的是（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"先里后外",{"key":24,"text":290,"correct":22},"先高后低",{"key":28,"text":292,"correct":22},"先重后轻",{"key":31,"text":294,"correct":26},"先上后下",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":24,"analysis":33},1111965,"下列自动化仪表安装施工程序正确的是（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":22},"取源部件安装→电缆敷设→仪表管道安装→仪表单体校验.调整安装",{"key":24,"text":302,"correct":26},"取源部件安装→仪表单体校验.调整安装→电缆敷设→仪表管道安装",{"key":28,"text":304,"correct":22},"取源部件安装→仪表管道安装→电缆敷设→仪表单体校验.调整安装",{"key":31,"text":306,"correct":22},"取源部件安装→电缆敷设→仪表单体校验.调整安装→仪表管道安装",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":31,"analysis":33},1111966,"仪表工程进行回路试验和系统试验后，连续（ ）开通投入运行正常后，即具备交接验收条件。",[311,313,315,317],{"key":20,"text":312,"correct":22},"12h",{"key":24,"text":314,"correct":22},"24h",{"key":28,"text":316,"correct":22},"36h",{"key":31,"text":318,"correct":26},"48h",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":31,"analysis":33},1111967,"节流装置在水平和倾斜的管道上安装时，当测量蒸汽流量时，取压口选取在（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"管道的上半部",{"key":24,"text":326,"correct":22},"管道的下半部",{"key":28,"text":328,"correct":22},"管道的下半部与管道水平中心线成0°～45°角的范围",{"key":31,"text":330,"correct":26},"管道的上半部与管道水平中心线成0°～45角的范围内",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":31,"analysis":33},1111968,"仪表设备由温度低于-5℃的环境移入保温库时，应在库内放置（ ）后再开箱。",[335,337,339,341],{"key":20,"text":336,"correct":22},"10h",{"key":24,"text":338,"correct":22},"15h",{"key":28,"text":340,"correct":22},"20h",{"key":31,"text":314,"correct":26},{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":31,"analysis":33},1111969,"自动化仪表工程施工中，综合控制系统试验的紧后工序是（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"投运",{"key":24,"text":349,"correct":22},"交接验收",{"key":28,"text":351,"correct":22},"竣工资料编制",{"key":31,"text":353,"correct":26},"回路试验",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},1111970,"自动化仪表施工的原则是（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"先地下后地上；先土建后安装；先配管布线再安装设备；先两端后中间",{"key":24,"text":361,"correct":26},"先土建后安装；先安装设备再配管布线；先两端后中间；先地下后地上",{"key":28,"text":363,"correct":22},"先安装设备再配管布线；先土建后安装；先地上后地下；先两端后中间",{"key":31,"text":365,"correct":22},"先土建后安装；先中间后两端；先地下后地上；先安装设备再配管布线",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},1111971,"有关气体检测器的安装，不正确的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"安装位置应根据被测气体的密度确定",{"key":24,"text":373,"correct":26},"被测气体密度大于空气时，检测器应安装距地面位置250～350mm处",{"key":28,"text":375,"correct":22},"被测气体密度小于空气时，检测器应安装在泄漏域的上方",{"key":31,"text":377,"correct":22},"应避开有强磁场干扰的位置",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":28,"analysis":33},1111972,"在水平和倾斜的管道上安装分析取源部件时，安装方位与（ ）取源部件的要求相同。",[382,384,386,388],{"key":20,"text":383,"correct":22},"物位",{"key":24,"text":385,"correct":22},"温度",{"key":28,"text":387,"correct":26},"压力",{"key":31,"text":389,"correct":22},"流量",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},1111973,"设备及管道保冷层的伸缩缝，应填塞严密或者刮入发泡型胶粘剂，外面用（ ）宽的不干性胶带粘贴密封，在伸缩缝的外面必须再进行保冷。",[394,396,398,400],{"key":20,"text":395,"correct":22},"100mm",{"key":24,"text":397,"correct":26},"50mm",{"key":28,"text":399,"correct":22},"80mm",{"key":31,"text":401,"correct":22},"20mm",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":20,"analysis":33},1111974,"关于抹面类涂抹保护层施工，不符合规定的是（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":26},"露天的绝热结构，不应采用抹面保护层",{"key":24,"text":409,"correct":22},"应釆用两遍操作，一次成形的施工工艺",{"key":28,"text":411,"correct":22},"室外的高温管道，应在伸缩缝部位加设金属护壳",{"key":31,"text":413,"correct":22},"伸缩缝应做成凹槽，深度应为5～8mm，宽度8～12mm",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},1111975,"下列关于静置设备的金属保护层施工要求的说法，正确的是（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":22},"金属保护层应自上而下敷设",{"key":24,"text":421,"correct":22},"环向接缝宜采用咬接",{"key":28,"text":423,"correct":22},"纵向接缝宜采用插接",{"key":31,"text":425,"correct":26},"搭接或插接尺寸应为30～50mm",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":24,"analysis":33},1111976,"下列工序中，不属于涂装工艺的是（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":22},"喷砂",{"key":24,"text":433,"correct":26},"辊涂",{"key":28,"text":435,"correct":22},"干燥",{"key":31,"text":437,"correct":22},"调配涂料",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},1111977,"管道保温层施工中，水平管道的保温层纵向接缝位置不得布置在（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":26},"管道垂直中心线45°范围内",{"key":24,"text":445,"correct":22},"管道垂直中心线60°范围内",{"key":28,"text":447,"correct":22},"管道水平中心线45°范围内",{"key":31,"text":449,"correct":22},"水平位置",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},1111978,"设备或管道采用硬质或半硬质材料作保冷层时，拼缝宽度不应大于（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":26},"2mm",{"key":24,"text":457,"correct":22},"5mm",{"key":28,"text":459,"correct":22},"10mm",{"key":31,"text":461,"correct":22},"12mm",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":20,"analysis":33},1111979,"当防潮层采用玻璃纤维布复合胶泥涂抹施工时，立式设备和垂直管道的环向接缝，应为（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":26},"上下搭接",{"key":24,"text":469,"correct":22},"两侧搭接",{"key":28,"text":471,"correct":22},"缝口朝下",{"key":31,"text":473,"correct":22},"缝口朝上",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},1111980,"下列接缝形式中，不用于绝热工程金属保护层施工的是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"搭接形式",{"key":24,"text":481,"correct":26},"对接形式",{"key":28,"text":483,"correct":22},"插接形式",{"key":31,"text":485,"correct":22},"咬接形式",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},1111981,"下列关于静态炉窑，说法错误的是（）。",[490,492,494,496],{"key":20,"text":491,"correct":26},"需要进行无负荷试运转",{"key":24,"text":493,"correct":22},"起始点一般选择自下而上",{"key":28,"text":495,"correct":22},"起拱部位应从两侧向中间砌筑",{"key":31,"text":497,"correct":22},"每次环向缝可以一次完成",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":28,"analysis":33},1111982,"回转式炉窑砌筑时，砌筑的起始点宜选择在（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"离传动最近的焊缝处",{"key":24,"text":505,"correct":22},"检修门（孔）处",{"key":28,"text":507,"correct":26},"工作温度的热端",{"key":31,"text":509,"correct":22},"支撑位置",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":28,"analysis":33},1111983,"拱和拱顶（湿砌）的砌体砖缝厚度施工技术要求不大于（ ）mm。",[514,516,517,519],{"key":20,"text":515,"correct":22},"1",{"key":24,"text":282,"correct":22},{"key":28,"text":518,"correct":26},"2",{"key":31,"text":520,"correct":22},"3",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},1111984,"耐火浇筑料施工程序中，膨胀缝填充的紧前工序是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":26},"模板拆除",{"key":24,"text":528,"correct":22},"浇筑料振捣",{"key":28,"text":530,"correct":22},"浇筑料浇筑",{"key":31,"text":532,"correct":22},"成品养护",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":28,"analysis":33},1111985,"下列耐火材料中，属于高级耐火材料的是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"耐火度为1650℃",{"key":24,"text":540,"correct":22},"耐火度为1750℃",{"key":28,"text":542,"correct":26},"耐火度为1850℃",{"key":31,"text":544,"correct":22},"耐火度为2050℃",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":31,"analysis":33},1111986,"炉窑砌筑前工序交接时，不需提交证明书的是（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"炉子中心线和控制标高的测量记录",{"key":24,"text":552,"correct":22},"隐蔽工程验收合格证明",{"key":28,"text":554,"correct":22},"托砖板焊接质量检查合格证明",{"key":31,"text":556,"correct":26},"炉窑出厂或进场检查验收记录",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":31,"analysis":33},1111987,"可用作隔热耐火砖的是（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"镁砖",{"key":24,"text":564,"correct":22},"镁铝砖",{"key":28,"text":566,"correct":22},"碳砖",{"key":31,"text":568,"correct":26},"高铝砖",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":31,"analysis":33},1111988,"砌筑工程冬期施工措施中，错误的是（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"应在采暖环境中进行",{"key":24,"text":576,"correct":22},"工作地点和砌体周围温度不应低于5℃",{"key":28,"text":578,"correct":22},"耐火砖和预制块在砌筑前，应预热至0℃以上",{"key":31,"text":580,"correct":26},"耐火泥浆施工时的温度不宜低于0℃",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":20,"analysis":33},1111989,"下列关于耐火材料的分类及性能说法当中正确的是（）。",[585,587,589,591],{"key":20,"text":586,"correct":26},"普通耐火材料，其耐火度为15801770℃;",{"key":24,"text":588,"correct":22},"硅砖属于中性耐火材料；",{"key":28,"text":590,"correct":22},"碱性耐火材料能耐酸性渣的侵烛。",{"key":31,"text":592,"correct":22},"中性耐火材料对酸性渣及碱性渣均不具有抗侵蚀作用。",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":28,"analysis":33},1111990,"根据《工业炉窑砌筑工程施工及验收范》，不属于工序交接证明书内容的是（）。",[597,599,601,603],{"key":20,"text":598,"correct":22},"隐蔽工程验收合格的证明",{"key":24,"text":600,"correct":22},"焊接严密性试验合格的证明",{"key":28,"text":602,"correct":26},"耐火材料的验收合格证明",{"key":31,"text":604,"correct":22},"上道工序成果的保护要求",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":20,"analysis":33},1111991,"下列关于耐火喷涂料施工技术要求的说法，错误的是（）。",[609,611,613,615],{"key":20,"text":610,"correct":26},"喷涂方向与受喷面成60°~75°夹角",{"key":24,"text":612,"correct":22},"喷涂应分段连续进行",{"key":28,"text":614,"correct":22},"喷涂料应采用半干法喷涂",{"key":31,"text":616,"correct":22},"施工中断时，宜将接槎处做成直槎",[618,621,624,627,630,633],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":632,"category":7,"favorite":8},534,"BIM工程师",{"id":634,"name":632,"category":7,"favorite":8},535]