[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,27,50,2160,[13,34,46,58,70,82,94,106,118,130,142,153,165,177,189,201,213,224,236,248,260,272,284,296,308,319,331,343,354,366,378,390,402,414,426,438,450,462,474,486,498,510,522,534,546,558,570,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1113174,1,"单选题","下列情况中，招标投标时不应作为废标处理的是（）。2016",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","投标报价明显低于标底",false,{"key":24,"text":25,"correct":22},"B","投标报价的编制格式与招标文件要求不一致",{"key":27,"text":28,"correct":22},"C","投标书提出的工期比招标文件的工期晚15天",{"key":30,"text":31,"correct":32},"D","投标单位投标后又在截止投标时间5分钟前突然降价",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1113175,"下列机电工程项目中，需编制主要施工方案的是（）。2016",[38,40,42,44],{"key":20,"text":39,"correct":22},"雨季和冬季施工",{"key":24,"text":41,"correct":22},"高空作业",{"key":27,"text":43,"correct":32},"设备试运行",{"key":30,"text":45,"correct":22},"交叉作业",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1113176,"（2020年真题）下列文件中，不属于施工技术交底依据的是（ ）。.",[50,52,54,56],{"key":20,"text":51,"correct":32},"施工合同",{"key":24,"text":53,"correct":22},"施工组织设计",{"key":27,"text":55,"correct":22},"施工图纸",{"key":30,"text":57,"correct":22},"专项施工方案",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1113178,"（2020年真题）下列影响施工进度的因素中，属于施工管理能力的是（ ）",[62,64,66,68],{"key":20,"text":63,"correct":22},"材料价格的上涨",{"key":24,"text":65,"correct":32},"安装失误造成返工",{"key":27,"text":67,"correct":22},"新标准技术培训",{"key":30,"text":69,"correct":22},"施工图纸设计变更",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1113179,"工程质量事故发生后，施工现场有关人员可直接向主管部门报告，报告内容中不包括的是（ ）。2019",[74,76,78,80],{"key":20,"text":75,"correct":32},"事故发生的原因和事故性质",{"key":24,"text":77,"correct":22},"事故报告单位、联系人及联系方式",{"key":27,"text":79,"correct":22},"事故发生的简要经过，伤亡人数和初步估计的直接经济损失",{"key":30,"text":81,"correct":22},"事故发生的时间，地点，工程项目名称，工程各参建单位名称",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},1113180,"（2020年真题）下列施工质量控制行为中，属于事中控制的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"施工资格审查",{"key":24,"text":89,"correct":22},"施工方案审批",{"key":27,"text":91,"correct":22},"检验方法审查",{"key":30,"text":93,"correct":32},"施工变更审查",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1113181,"下列情况中，可向建设单位提出费用索赔的是（）。2016",[98,100,102,104],{"key":20,"text":99,"correct":22},"监理单位责令剥离检查未报检的隐蔽工程而产生的费用",{"key":24,"text":101,"correct":22},"施工单位的设备被暴雨淋湿而产生的费用",{"key":27,"text":103,"correct":32},"建设单位增加工作量造成的费用增加",{"key":30,"text":105,"correct":22},"施工单位施工人员高处坠落受伤产生的费用",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},1113182,"施工合同中有关合同价款的分析内容，除合同价格和计价方法外，还应包括（）。2017",[110,112,114,116],{"key":20,"text":111,"correct":22},"工期要求",{"key":24,"text":113,"correct":22},"合同变更",{"key":27,"text":115,"correct":22},"索赔程序",{"key":30,"text":117,"correct":32},"价格补偿条件",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1113183,"储罐内防腐蚀涂装作业中，不存在的危险源是（ ）。2019",[122,124,126,128],{"key":20,"text":123,"correct":22},"窒息",{"key":24,"text":125,"correct":22},"中毒",{"key":27,"text":127,"correct":32},"触电",{"key":30,"text":129,"correct":22},"溜滑",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":30,"analysis":33},1113184,"（2020年真题）下列临时用电的做法中，存在事故隐患的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"电线电缆架空或穿管敷设",{"key":24,"text":137,"correct":22},"配电箱进线采用三相五线",{"key":27,"text":139,"correct":22},"电动工具均有漏电保护",{"key":30,"text":141,"correct":32},"照明箱外壳未接保护零线",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1113185,"（2020年真题）施工单位应急预案体系组成的文件不包括（ ）。",[146,148,150,151],{"key":20,"text":147,"correct":22},"综合应急预案",{"key":24,"text":149,"correct":22},"专项应急预案",{"key":27,"text":57,"correct":32},{"key":30,"text":152,"correct":22},"现场处置方案",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},1113186,"下列绿色施工技术中，属于节材与材料资源利用方面的是（ ）。2019",[157,159,161,163],{"key":20,"text":158,"correct":32},"BIM 技术及工厂化预制",{"key":24,"text":160,"correct":22},"雨水回收和利用",{"key":27,"text":162,"correct":22},"使用太阳能临时照明灯",{"key":30,"text":164,"correct":22},"减少土方开挖和回填",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},1113187,"（2020年真题）下列绿色施工环境保护措施中，属于扬尘控制的是（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"对建筑垃圾进行分类",{"key":24,"text":172,"correct":32},"施工现场出口设置洗车槽",{"key":27,"text":174,"correct":22},"防腐保温材料妥善保管",{"key":30,"text":176,"correct":22},"施工后恢复被破坏的植被",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},1113188,"降低机电工程项目成本的合同措施不包括（）。2017.",[181,183,185,187],{"key":20,"text":182,"correct":32},"建立成本管理责任体系",{"key":24,"text":184,"correct":22},"选择适当的合同结构模式",{"key":27,"text":186,"correct":22},"必要的合同风险防控对策",{"key":30,"text":188,"correct":22},"全过程的合同控制",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},1113189,"在编制项目施工成本计划时，不采用的方法是（ ）。2019",[193,195,197,199],{"key":20,"text":194,"correct":32},"按项目工序成本编制成本计划的方法",{"key":24,"text":196,"correct":22},"按成本构成编制成本计划的方法",{"key":27,"text":198,"correct":22},"按工程实施阶段编制成本计划的方法",{"key":30,"text":200,"correct":22},"按项目结构编制成本计划的方法",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},1113191,"（2020年真题）机电工程项目成本控制的方法中，属于施工准备阶段控制的是（ ）",[205,207,209,211],{"key":20,"text":206,"correct":22},"成本差异分析",{"key":24,"text":208,"correct":22},"施工成本核算",{"key":27,"text":210,"correct":32},"优化施工方案",{"key":30,"text":212,"correct":22},"注意工程变更",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":30,"analysis":33},1113192,"工程竣工结算的编制依据不包括（）。2017",[217,218,220,222],{"key":20,"text":51,"correct":22},{"key":24,"text":219,"correct":22},"政策性调价文件",{"key":27,"text":221,"correct":22},"设计变更技术核定单",{"key":30,"text":223,"correct":32},"招标控制价清单",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},1113193,"不能进行竣工验收的机电工程项目是（）。2016",[228,230,232,234],{"key":20,"text":229,"correct":32},"达到环境保护要求，尚未取得环境保护验收登记卡",{"key":24,"text":231,"correct":22},"附属工程尚未建成，但不影响生产",{"key":27,"text":233,"correct":22},"形成部分生产能力，近期不能按设计规模续建",{"key":30,"text":235,"correct":22},"已投产，但一时达不到设计产能",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},1113194,"（2020年真题）单机试运行方案由项目总工程师组织编制后，审定人是（ ）",[240,242,244,246],{"key":20,"text":241,"correct":22},"项目经理",{"key":24,"text":243,"correct":32},"企业总工程师",{"key":27,"text":245,"correct":22},"总监理工程师",{"key":30,"text":247,"correct":22},"建设单位负责人",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},1113195,"关于30kW 水泵单机试运转的说法，正确的是（ ）。2019",[252,254,256,258],{"key":20,"text":253,"correct":22},"连续试运转时间应为15min",{"key":24,"text":255,"correct":32},"试运转的介质宜采用清水",{"key":27,"text":257,"correct":22},"滑动轴承温度不应大于80℃",{"key":30,"text":259,"correct":22},"滚动轴承温度不应大于90℃",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},1113196,"下列施工计量器具中，属于强制性检定范畴的是（）。2014",[264,266,268,270],{"key":20,"text":265,"correct":32},"声级计",{"key":24,"text":267,"correct":22},"超声波测厚仪",{"key":27,"text":269,"correct":22},"压力表",{"key":30,"text":271,"correct":22},"垂直检测尺",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":24,"analysis":33},1113197,"下列计量器具中，属于强制检定范畴的是（）。2016",[276,278,280,282],{"key":20,"text":277,"correct":22},"电压表",{"key":24,"text":279,"correct":32},"兆欧表",{"key":27,"text":281,"correct":22},"电流表",{"key":30,"text":283,"correct":22},"电阻表",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},1113198,"用于量值传递的A类计量器具的是（）。2011",[288,290,292,294],{"key":20,"text":289,"correct":32},"直角尺检具",{"key":24,"text":291,"correct":22},"焊接检验尺",{"key":27,"text":293,"correct":22},"经纬仪",{"key":30,"text":295,"correct":22},"塞尺",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":24,"analysis":33},1113199,"施工企业使用的A类计量器具包括最高计量标准器具和用于（）的工作计量器具。2015",[300,302,304,306],{"key":20,"text":301,"correct":22},"工艺控制",{"key":24,"text":303,"correct":32},"量值传递",{"key":27,"text":305,"correct":22},"质量检测",{"key":30,"text":307,"correct":22},"物资管理",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":24,"analysis":33},1113200,"按国家计量局《计量器具分类管理办法》的划分，施工企业在用的C类计量器具是（）。2010",[312,314,316,317],{"key":20,"text":313,"correct":22},"接地电阻测量仪",{"key":24,"text":315,"correct":32},"弯尺",{"key":27,"text":291,"correct":22},{"key":30,"text":318,"correct":22},"水平仪",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":20,"analysis":33},1113201,"按施工计量器具使用的管理规定，不属于企事业单位计量标准器具使用必备条件的是（）。2018",[323,325,327,329],{"key":20,"text":324,"correct":32},"取得ISO90体系认证",{"key":24,"text":326,"correct":22},"具有正常工作所需要的环境条件",{"key":27,"text":328,"correct":22},"具有称职的保存、维护、使用人员",{"key":30,"text":330,"correct":22},"经计量检定合格",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":27,"analysis":33},1113202,"施工单位所选用的计量器具和设备必须具有产品合格证或（）。2012",[335,337,339,341],{"key":20,"text":336,"correct":22},"制造许可证",{"key":24,"text":338,"correct":22},"产品说明书",{"key":27,"text":340,"correct":32},"技术鉴定书",{"key":30,"text":342,"correct":22},"使用规范",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":24,"analysis":33},1113203,"下列计量器具中，不属于A类器具的是（）。2017",[347,348,350,352],{"key":20,"text":289,"correct":22},{"key":24,"text":349,"correct":32},"千分表",{"key":27,"text":351,"correct":22},"立式光学计",{"key":30,"text":353,"correct":22},"X射线探伤机",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":20,"analysis":33},1113204,"关于A 类计量器具的管理办法，正确的是（ ）。2019",[358,360,362,364],{"key":20,"text":359,"correct":32},"送法定计量检定机构定期检验",{"key":24,"text":361,"correct":22},"由所属企业计量管理部门校正",{"key":27,"text":363,"correct":22},"经检查及验证合格后可以使用",{"key":30,"text":365,"correct":22},"用检定合格仪表直接对比核准",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":20,"analysis":33},1113205,"【2019 案例二~3】 【背景资料】 某安装公司签订了20MWP并网光伏发电项目的施工总承包合同，主要工作内容：光伏场区发电设备及线路（包括光伏阵列设备、逆变及配电设备、逆变及配电设备、箱式变压器、35kV电缆集电线路等）安装工程、35kV架空线路安装工程、开关站安装工程（包括一次设备、母线和二次设备）等。 安装公司项目部进场后，认真开展项目开工前的各项准备工作，项目经理组织编制了机电安装工程施工组织总设计，技术人员编制了主要施工方案，方案中的绿色施工管理的重点是草原土壤保护。 施工前，施工方案编制人员向作业人员进行了安全技术交底。光伏场区集电线路设计为35kV直埋电缆，根据施工方案要求，采用机械开挖电缆沟，由于沟底有少量碎石，施工人员在沟底铺设一层细沙，完成直埋电缆工程的相关工作。 在施工过程中，公司总部多次对项目进行综合检查，发现下列事件，存在施工质量问题，并监督项目进行整改。",[370,372,374,376],{"key":20,"text":371,"correct":32},"事件1：现场作业人员使用的经纬仪检定合格证超过有效期，电气试验人员使用的兆欧表检定合格证丢失，项目部计量管理员对施工使用的计量器具没有进行跟踪管理。",{"key":24,"text":373,"correct":22},"事件2：室内配电装置的母线采用螺栓连接，业人员在母线连接处涂了凡士林，母线平置连接时的螺栓由上向下穿，螺栓连接的母线两外侧只有平垫圈，并用普通扳手紧固。",{"key":27,"text":375,"correct":22},"【问题】",{"key":30,"text":377,"correct":22},"3.事件1 中，项目部计量管理员的管理是否合格？简述项目部计量管理员的工作内容。",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},1113206,"（2020年真题）建筑安装工程分部工程质量验收的负责人是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"专业监理工程师",{"key":24,"text":385,"correct":32},"施工项目经理",{"key":27,"text":387,"correct":22},"设计单位技术负责人",{"key":30,"text":389,"correct":22},"建设单位项目负责人",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":30,"analysis":33},1113208,"锅炉烘炉，煮炉和试运转完成后，应请（）验收。2015",[394,396,398,400],{"key":20,"text":395,"correct":22},"施工单位质量部门",{"key":24,"text":397,"correct":22},"施工单位施工管理部门",{"key":27,"text":399,"correct":22},"制造单位质量部门",{"key":30,"text":401,"correct":32},"所在监督监管部门",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},1113209,"关于特种设备的制造安装要求，错误的说法是（）。2013",[406,408,410,412],{"key":20,"text":407,"correct":22},"现场制作压力容器须按压力容器质保手册的规定进行，并接受安全监察部门的监督检查",{"key":24,"text":409,"correct":32},"电梯安装结束经自检后，应提请国家特种设备安全监察部门核准的检验检测机构进行检验",{"key":27,"text":411,"correct":22},"承揽特种设备工程前，应取得特种设备安装、改造、维修活动的资格",{"key":30,"text":413,"correct":22},"锅炉施工中按质量保证手册和与锅炉安装监察部门的约定，接受对锅炉各工序和监检点进行质量检验",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":30,"analysis":33},1113210,"下列设备中，属于特种设备的是（）2014",[418,420,422,424],{"key":20,"text":419,"correct":22},"风机",{"key":24,"text":421,"correct":22},"水泵",{"key":27,"text":423,"correct":22},"压缩机",{"key":30,"text":425,"correct":32},"储气罐",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":33},1113211,"特种设备安全法规定，特种设备的（）过程应当由特种设备检验检测机构进行监督检验。2016",[430,432,434,436],{"key":20,"text":431,"correct":32},"改造",{"key":24,"text":433,"correct":22},"装卸",{"key":27,"text":435,"correct":22},"运输",{"key":30,"text":437,"correct":22},"使用",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":27,"analysis":33},1113212,"关于GC 类压力管道安装前要求的说法，错误的是（ ）。2019",[442,444,446,448],{"key":20,"text":443,"correct":22},"施工方案需发包方批准",{"key":24,"text":445,"correct":22},"发电子邮件履行告知手续",{"key":27,"text":447,"correct":32},"应向省级质量技术监督部门告知",{"key":30,"text":449,"correct":22},"焊工应持有《特种设备作业人员证》",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":27,"analysis":33},1113213,"下列容器中，属于Ⅱ类压力容器的是（）。2017",[454,456,458,460],{"key":20,"text":455,"correct":22},"容积等于50m3的球形容器",{"key":24,"text":457,"correct":22},"容积等于5m3的低温液体储存容器",{"key":27,"text":459,"correct":32},"低压管壳式余热锅炉",{"key":30,"text":461,"correct":22},"中压搪玻璃容器",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":30,"analysis":33},1113214,"下列施工内容中,不属于特种设备监督检查范围的是（）。2018",[466,468,470,472],{"key":20,"text":467,"correct":22},"电梯安装",{"key":24,"text":469,"correct":22},"起重机械安装",{"key":27,"text":471,"correct":22},"压力管道安装",{"key":30,"text":473,"correct":32},"锅炉风道改造",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":30,"analysis":33},1113215,"（2020年真题）压力容器安装前，不需要查验的是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"竣工图样和产品合格证",{"key":24,"text":481,"correct":22},"产品质量证明文件",{"key":27,"text":483,"correct":22},"压力容器监督检验证书",{"key":30,"text":485,"correct":32},"使用维护保养说明",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":30,"analysis":33},1113216,"下列有关用电计量装置的规定。说法正确的是（）。2015",[490,492,494,496],{"key":20,"text":491,"correct":22},"用电计量装置设计应征得检定机构的认可",{"key":24,"text":493,"correct":22},"用电计量装置必须装在供电设施的产权分界处",{"key":27,"text":495,"correct":22},"用电计量装置属于非强制检定范畴",{"key":30,"text":497,"correct":32},"现场校验后的用电计量装置应加封",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":27,"analysis":33},1113217,"用于电力线路上的电气设备是（）2014",[502,504,506,508],{"key":20,"text":503,"correct":22},"金具",{"key":24,"text":505,"correct":22},"集箱",{"key":27,"text":507,"correct":32},"断路器",{"key":30,"text":509,"correct":22},"叶栅",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":30,"analysis":33},1113218,"在依法规划的电力设备保护区内危及电力设施安全的建筑物由（）责令强制拆除。2012",[514,516,518,520],{"key":20,"text":515,"correct":22},"安全管理部门",{"key":24,"text":517,"correct":22},"电力管理部门",{"key":27,"text":519,"correct":22},"施工管理部门",{"key":30,"text":521,"correct":32},"当地人民政府",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},1113219,"在距电力设施周围50m范围内进行（）作业时，需征得电力设施产权单位的书面同意，并报经政府有关管理部门批准。2016",[526,528,530,532],{"key":20,"text":527,"correct":22},"堆物",{"key":24,"text":529,"correct":32},"爆破",{"key":27,"text":531,"correct":22},"开孔",{"key":30,"text":533,"correct":22},"钻探",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":30,"analysis":33},1113220,"施工单位在电缆保护区实施爆破作业时，制定爆破施工方案应（）。201",[538,540,542,544],{"key":20,"text":539,"correct":22},"邀请地方建设管理部门参与",{"key":24,"text":541,"correct":22},"报当地电力管理部门批准",{"key":27,"text":543,"correct":22},"及时与地下电缆管理部门沟通",{"key":30,"text":545,"correct":32},"邀请地下电缆管理部门派员参加",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":30,"analysis":33},1113221,"电力设施与绿化工程相互妨碍时，有关单位应当按照（）有关规定协商，达成协议后方可施工。2010",[550,552,554,556],{"key":20,"text":551,"correct":22},"电力行业",{"key":24,"text":553,"correct":22},"市政部门",{"key":27,"text":555,"correct":22},"当地政府",{"key":30,"text":557,"correct":32},"国家",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},1113222,"临时用电施工组织设计的主要内容不包括（）。2018",[562,564,566,568],{"key":20,"text":563,"correct":22},"确定电源电线的位置及线路走向",{"key":24,"text":565,"correct":32},"绘制施工机械平面布置图",{"key":27,"text":567,"correct":22},"制定电气防火措施",{"key":30,"text":569,"correct":22},"进行负荷计算",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":24,"analysis":33},1113223,"未经批准在电力设施保护区内修建建筑物，危及电力设施安全的，由（）责令停止作业，恢复原状并赔偿损失。2011",[574,576,577,579],{"key":20,"text":575,"correct":22},"建筑管理部门",{"key":24,"text":517,"correct":32},{"key":27,"text":578,"correct":22},"建筑物上级管理部门",{"key":30,"text":580,"correct":22},"市政管理部门",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":27,"analysis":33},1113225,"（2020年真题）下列情况中，无需到供电部门办理用电手续的是（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":22},"增加用电",{"key":24,"text":588,"correct":22},"变更用电",{"key":27,"text":590,"correct":32},"增设一级配电",{"key":30,"text":592,"correct":22},"新装用电",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":27,"analysis":33},1113226,"分部工程的划分应力求与（）中的项目划分一致。",[597,599,601,603],{"key":20,"text":598,"correct":22},"施工班组劳动定额",{"key":24,"text":600,"correct":22},"企业定额",{"key":27,"text":602,"correct":32},"预算管理制度规定",{"key":30,"text":604,"correct":22},"概算定额",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":24,"analysis":33},1113227,"分部工程质量在各分项工程自检验收合格的基础上，由施工单位向（）报验申请质量验收。",[609,611,613,615],{"key":20,"text":610,"correct":22},"监理单位",{"key":24,"text":612,"correct":32},"建设单位",{"key":27,"text":614,"correct":22},"质检单位",{"key":30,"text":616,"correct":22},"设计单位",[618,621,624,627,630,633],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":632,"category":7,"favorite":8},534,"BIM工程师",{"id":634,"name":632,"category":7,"favorite":8},535]