[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,25,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,249,261,273,285,296,308,320,332,344,356,368,380,392,404,416,428,440,452,464,476,488,500,512,521,533,545,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1113072,1,"单选题","汽轮机低压外下缸组合时，汽缸找中心的基准目前多采用（）。2015",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","激光法",false,{"key":24,"text":25,"correct":26},"B","拉钢丝法",true,{"key":28,"text":29,"correct":22},"C","假轴法",{"key":31,"text":32,"correct":22},"D","转子法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1113073,"高温高压锅炉一般采用的主要蒸发受热面是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"管式水冷壁",{"key":24,"text":41,"correct":26},"膜式水冷壁",{"key":28,"text":43,"correct":22},"对流管束",{"key":31,"text":45,"correct":22},"过热器",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1113074,"压力表与表管之间装设三通旋塞阀的目的是（）。2016.",[50,52,54,56],{"key":20,"text":51,"correct":22},"提高测量精度",{"key":24,"text":53,"correct":26},"便于吹洗管路",{"key":28,"text":55,"correct":22},"减小管道噪音",{"key":31,"text":57,"correct":22},"缓冲对表的压力冲击",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1113075,"若无设计规定，一般负压锅炉的风压试验压力是（）。2017",[62,64,66,68],{"key":20,"text":63,"correct":22},"04kPa",{"key":24,"text":65,"correct":26},"05kPa",{"key":28,"text":67,"correct":22},"06kPa",{"key":31,"text":69,"correct":22},"10kPa",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1113076,"下列设施中，不在蒸汽管路冲洗与吹洗范围的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"汽包",{"key":24,"text":77,"correct":22},"锅炉过热器、再热器",{"key":28,"text":79,"correct":22},"减温水管系统",{"key":31,"text":81,"correct":22},"过热蒸汽管道",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1113077,"锅炉本体受热面组合安装的一般程序中，设备清点检查的紧后工序是（）。【2014】",[86,88,90,92],{"key":20,"text":87,"correct":22},"压力试验",{"key":24,"text":89,"correct":22},"泄漏试验",{"key":28,"text":91,"correct":22},"灌水试验",{"key":31,"text":93,"correct":26},"通球试验",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1113078,"多节柱钢结构安装时,为避免造成过大的积累误差每节柱的定位轴线应从（）直接引上。2012",[98,100,102,104],{"key":20,"text":99,"correct":26},"地面控制轴线",{"key":24,"text":101,"correct":22},"下一节轴线",{"key":28,"text":103,"correct":22},"中间节轴线",{"key":31,"text":105,"correct":22},"最高一节柱轴线",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1113079,"球形罐的产品焊接试板应在（），由施焊该球形罐的焊工采用相同条件和焊接工艺进行焊接。2011",[110,112,114,116],{"key":20,"text":111,"correct":22},"球型罐正式焊前",{"key":24,"text":113,"correct":26},"焊接球型罐产品的同时",{"key":28,"text":115,"correct":22},"球型罐焊接缝检验合格后",{"key":31,"text":117,"correct":22},"水压试验前",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1113080,"现场组焊的球形储罐，应制作（）三块产品焊接试板。2013",[122,124,126,128],{"key":20,"text":123,"correct":22},"立焊、角焊、平加仰焊",{"key":24,"text":125,"correct":22},"角焊、横焊、对焊",{"key":28,"text":127,"correct":26},"横焊、平加仰焊、立焊",{"key":31,"text":129,"correct":22},"对焊、立焊、平加仰焊",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1113081,"大型钢结构工程（）进行竣工验收。",[134,136,138,140],{"key":20,"text":135,"correct":22},"可按分项工程",{"key":24,"text":137,"correct":26},"可划分成若干个子分部工程",{"key":28,"text":139,"correct":22},"可按一个分部工程",{"key":31,"text":141,"correct":22},"可按一个子分部工程",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1113082,"钢制储罐的环缝埋弧自动焊主要用于（）施工的罐壁环缝焊接。",[146,148,150,152],{"key":20,"text":147,"correct":26},"正装法",{"key":24,"text":149,"correct":22},"倒装法",{"key":28,"text":151,"correct":22},"气顶法",{"key":31,"text":153,"correct":22},"水浮法",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1113083,"根据压力容器安装许可规则，下列说法正确的是（）。2015",[158,160,162,164],{"key":20,"text":159,"correct":22},"分片到货的球罐安装，属于压力容器安装许可管理范围",{"key":24,"text":161,"correct":22},"只取得GC1级压力管道安装许可资质的单位，不可以从事压力容器安装工作",{"key":28,"text":163,"correct":22},"取得A2级制造许可的单位，可安装高压容器，不得安装超高压容器",{"key":31,"text":165,"correct":26},"压力容器安装前，应向设区的市的特种设备安全监督管理部门书面告知",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1113084,"下列关于储罐充水试验规定的说法，错误的是（）。2018",[170,172,174,176],{"key":20,"text":171,"correct":22},"充水试验采用洁净水",{"key":24,"text":173,"correct":22},"试验水温不低于5℃",{"key":28,"text":175,"correct":22},"充水试验的同时进行基础沉降观测",{"key":31,"text":177,"correct":26},"放水过程中应关闭透光孔",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1113085,"静置设备找正或找平应采用的正确方法是（）进行调整。",[182,184,186,188],{"key":20,"text":183,"correct":26},"采用垫铁",{"key":24,"text":185,"correct":22},"紧固地脚螺栓",{"key":28,"text":187,"correct":22},"增高灌浆抹面层",{"key":31,"text":189,"correct":22},"放松地脚螺栓",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1113086,"以CO2气体保护实现单面焊双面成型的焊接方法是（）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"半自动CO2气体保护焊",{"key":24,"text":197,"correct":22},"埋弧自动焊",{"key":28,"text":199,"correct":22},"双丝埋弧自动焊",{"key":31,"text":201,"correct":26},"气电焊（熔化极气体保护焊）",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1113087,"《钢结构工程施工质量验收规范》规定，低合金结构钢在环境温度低于（）时，不应进行冷校正和冷弯曲。",[206,208,210,212],{"key":20,"text":207,"correct":22},"-18℃",{"key":24,"text":209,"correct":22},"-16℃",{"key":28,"text":211,"correct":22},"-14℃",{"key":31,"text":213,"correct":26},"-12℃",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1113088,"高强度大六角头螺栓正确的连接要求是（）。2016",[218,220,222,224],{"key":20,"text":219,"correct":22},"螺栓不能自由穿入螺栓孔是用气割扩孔",{"key":24,"text":221,"correct":22},"螺栓必须一次达到拧紧力矩要求",{"key":28,"text":223,"correct":22},"施拧顺序由螺栓群外围向中心施拧",{"key":31,"text":225,"correct":26},"螺栓连接副可采用转角法施拧",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},1113089,"《钢结构工程施工质量验收规范》规定，钢材的切割面或剪切面，允许存在的缺陷有（）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"裂纹",{"key":24,"text":233,"correct":22},"分层",{"key":28,"text":235,"correct":22},"夹渣",{"key":31,"text":237,"correct":26},"小于1mm的缺棱",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1113090,"800m3球罐的组装方法适宜采用下列组装方法中的( )。2012",[242,244,246,248],{"key":20,"text":243,"correct":22},"散装法",{"key":24,"text":245,"correct":26},"分带法",{"key":28,"text":247,"correct":22},"半球法",{"key":31,"text":153,"correct":22},{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":28,"analysis":33},1113091,"下列静置设备设计压力值（P）的范围中，正确的是（）。2017",[253,255,257,259],{"key":20,"text":254,"correct":22},"常压设备：P＜0.12MPa",{"key":24,"text":256,"correct":22},"低压设备：0.12MPa≤P＜1.6MPa",{"key":28,"text":258,"correct":26},"中压设备：1.6MPa≤P＜10MPa",{"key":31,"text":260,"correct":22},"高压设备：10MPa≤P＜160MPa",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1113092,"自动化仪表工程施工的原则是（）。2011",[265,267,269,271],{"key":20,"text":266,"correct":22},"先地上后地下，先两端后中间，先土建后安装，先设备后配管布线",{"key":24,"text":268,"correct":26},"先土建后安装，先两端后中间，先设备后配管布线，先地下后地上",{"key":28,"text":270,"correct":22},"先配管布线后设备，先土建后安装，先两端后中间，先地下后地上",{"key":31,"text":272,"correct":22},"先两端后中间，先地上后地下，先设备后配管布线，先土建后安装",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":28,"analysis":33},1113093,"自动化仪表的取源部件安装，正确的做法是（）。2015",[277,279,281,283],{"key":20,"text":278,"correct":22},"在工艺管道的防腐，衬里，吹扫后开孔和焊接",{"key":24,"text":280,"correct":22},"同一管段上的压力取源部件安装在温度取源部件下游侧",{"key":28,"text":282,"correct":26},"温度取源部件在管道上垂直安装时，应与管道轴线垂直相交",{"key":31,"text":284,"correct":22},"温度取源部件应近邻阀门出口侧安装",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":24,"analysis":33},1113094,"直接安装在管道上的取源部件应随同管道系统进行（）。2014",[289,291,292,294],{"key":20,"text":290,"correct":22},"吹扫清洗",{"key":24,"text":87,"correct":26},{"key":28,"text":293,"correct":22},"无损检测",{"key":31,"text":295,"correct":22},"防腐保温",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":28,"analysis":33},1113095,"当取源部件设置在管道的下半部与管道水平中心线成0o～45o夹角范围内时，其测量的参数是（）。2013",[300,302,304,306],{"key":20,"text":301,"correct":22},"气体压力",{"key":24,"text":303,"correct":22},"气体流量",{"key":28,"text":305,"correct":26},"蒸汽压力",{"key":31,"text":307,"correct":22},"蒸汽流量",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},1113096,"自动化仪表调校应遵循的原则不包括（）。",[312,314,316,318],{"key":20,"text":313,"correct":22},"先取证后校验",{"key":24,"text":315,"correct":22},"先单回路后复杂回路",{"key":28,"text":317,"correct":22},"先单校后联校",{"key":31,"text":319,"correct":26},"先高后低",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},1113097,"自动化仪表试验的24V直流电源电压波动不应超过（）。",[324,326,328,330],{"key":20,"text":325,"correct":22},"±2.5%",{"key":24,"text":327,"correct":26},"±5%",{"key":28,"text":329,"correct":22},"±7.5%",{"key":31,"text":331,"correct":22},"±10%",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":31,"analysis":33},1113098,"仪表中央控制室内回路试验主要是指控制回路试验和（）试验。",[336,338,340,342],{"key":20,"text":337,"correct":22},"反馈回路",{"key":24,"text":339,"correct":22},"放大回路",{"key":28,"text":341,"correct":22},"联锁回路",{"key":31,"text":343,"correct":26},"检测回路",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":28,"analysis":33},1113099,"自动化仪表工程须连续投入运行（），运行正常后方具备交接验收条件。2018",[348,350,352,354],{"key":20,"text":349,"correct":22},"24h",{"key":24,"text":351,"correct":22},"36h",{"key":28,"text":353,"correct":26},"48h",{"key":31,"text":355,"correct":22},"72h",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":28,"analysis":33},1113100,"下列管道中，不属于仪表管道的是（）。2016",[360,362,364,366],{"key":20,"text":361,"correct":22},"测量管道",{"key":24,"text":363,"correct":22},"气动信号管道",{"key":28,"text":365,"correct":26},"配线管道",{"key":31,"text":367,"correct":22},"伴热管道",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":28,"analysis":33},1113101,"测可燃气体的检测仪的安装位置，应按（）来确定。",[372,374,376,378],{"key":20,"text":373,"correct":22},"设备安装的高度",{"key":24,"text":375,"correct":22},"审核的消防设计文件",{"key":28,"text":377,"correct":26},"被测气体的密度",{"key":31,"text":379,"correct":22},"泄露区域的位置",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":31,"analysis":33},1113102,"自动化仪表设备安装应遵循的程序是（）2012",[384,386,388,390],{"key":20,"text":385,"correct":22},"先里后外、先低后高、先轻后重",{"key":24,"text":387,"correct":22},"先外后里、先低后高、先重后轻",{"key":28,"text":389,"correct":22},"先外后里、先高后低、先轻后重",{"key":31,"text":391,"correct":26},"先里后外、先高后低、先重后轻",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":31,"analysis":33},1113103,"温度取源部件安装在合金管道拐弯处时，错误的是（）。2017",[396,398,400,402],{"key":20,"text":397,"correct":22},"在防腐、衬里、吹扫和压力试验前安装",{"key":24,"text":399,"correct":22},"用机械方法开孔",{"key":28,"text":401,"correct":22},"逆着物料流向安装",{"key":31,"text":403,"correct":26},"取源部件轴线与管道轴线垂直相交",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":20,"analysis":33},1113105,"（2020年真题）建筑智能化工程中，电动阀门安装前应进行的试验是（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":26},"模拟动作试验",{"key":24,"text":411,"correct":22},"阀门行程试验",{"key":28,"text":413,"correct":22},"关紧力矩试验",{"key":31,"text":415,"correct":22},"直流耐压测试",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":24,"analysis":33},1113106,"（2020年真题）自动化仪表安装施工程序中，“综合控制系统试验”的紧后工序是（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"投运",{"key":24,"text":423,"correct":26},"回路试验、系统试验",{"key":28,"text":425,"correct":22},"交接验收",{"key":31,"text":427,"correct":22},"仪表电源设备试验",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":28,"analysis":33},1113107,"管道保温作业正确的做法是（）。2014",[432,434,436,438],{"key":20,"text":433,"correct":22},"伴热管道与管道间的空隙应填充材料",{"key":24,"text":435,"correct":22},"用铝带捆扎保温层，每节管壳至少捆扎一道",{"key":28,"text":437,"correct":26},"阀门的保温应采用可拆卸式结构",{"key":31,"text":439,"correct":22},"同层保温预制块的接缝要对齐",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":24,"analysis":33},1113108,"硅酸盐耐火浇注施工完后，宜于（）养护。",[444,446,448,450],{"key":20,"text":445,"correct":22},"过热蒸汽",{"key":24,"text":447,"correct":26},"浇水",{"key":28,"text":449,"correct":22},"恒温",{"key":31,"text":451,"correct":22},"自然",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":33},1113109,"关于管道保温层施工的做法，错误的是（）。2017",[456,458,460,462],{"key":20,"text":457,"correct":22},"采用预制块做保温层时，同层要错缝，异层要压缝",{"key":24,"text":459,"correct":22},"管道上的法兰等经常维修的部位，保温层必须采用可拆卸式的结构",{"key":28,"text":461,"correct":26},"水平管道的纵向接缝位置，要布置在管道垂直中心线45°的范围内",{"key":31,"text":463,"correct":22},"管托处的管道保温，应不妨碍管道的膨胀位移",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},1113110,"关于防腐蚀涂层施工技术要求的下列说法中，错误的是（）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"在设备及管道金属表面处理达到要求后应尽快涂装",{"key":24,"text":471,"correct":26},"施工环境温度宜为5～40℃",{"key":28,"text":473,"correct":22},"涂料配制、搅拌均匀在使用期内使用",{"key":31,"text":475,"correct":22},"涂层施工前应对凹凸不平、焊接波纹和非圆弧拐角处用腻子修补",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":28,"analysis":33},1113111,"采用玻璃钢做防腐衬里的化学设备，其表面预处理方法为（）除锈。2011",[480,482,484,486],{"key":20,"text":481,"correct":22},"人工",{"key":24,"text":483,"correct":22},"机械",{"key":28,"text":485,"correct":26},"喷射",{"key":31,"text":487,"correct":22},"化学",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":20,"analysis":33},1113112,"盘管式热交换器管道进行内外防腐处理常采用的涂装方法是（）。2012",[492,494,496,498],{"key":20,"text":493,"correct":26},"浸涂",{"key":24,"text":495,"correct":22},"刷涂",{"key":28,"text":497,"correct":22},"淋涂",{"key":31,"text":499,"correct":22},"喷涂",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":20,"analysis":33},1113113,"金属表面防腐前预处理要求，正确的是（）。2015",[504,506,508,510],{"key":20,"text":505,"correct":26},"基体表面温度高于露点3℃以上",{"key":24,"text":507,"correct":22},"相对湿度上升到60%时，应停止除锈工作",{"key":28,"text":509,"correct":22},"海沙作为喷射材料进行除锈工作",{"key":31,"text":511,"correct":22},"金属表面应除锈彻底，打磨光滑",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},1113114,"防腐蚀涂层施工时，若采用黏度高、100%固体含量的液态涂料，宜选用的涂装方法是（）。2010",[516,517,518,519],{"key":20,"text":499,"correct":22},{"key":24,"text":493,"correct":22},{"key":28,"text":495,"correct":22},{"key":31,"text":520,"correct":26},"刮涂",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":28,"analysis":33},1113115,"立式设备采用硬质或半硬质制品保温施工时，需设置（），并从该处开始自下而上拼砌。2011",[525,527,529,531],{"key":20,"text":526,"correct":22},"锚固钉",{"key":24,"text":528,"correct":22},"吊架",{"key":28,"text":530,"correct":26},"支撑件",{"key":31,"text":532,"correct":22},"模板",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},1113116,"采用预制块做保温层的要求是（）。2013",[537,539,541,543],{"key":20,"text":538,"correct":26},"同层要错缝，异层要压缝，用同等级材料的胶泥勾缝",{"key":24,"text":540,"correct":22},"同层要错缝，异层要压缝，用高一等级材料的胶泥勾缝",{"key":28,"text":542,"correct":22},"同层要压缝，异层要错缝，用同等级材料的胶泥勾缝",{"key":31,"text":544,"correct":22},"同层要压缝，异层要错缝，用高一等级材料的胶泥勾缝",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":31,"analysis":33},1113117,"下列关于静置设备的金属保护层施工要求的说法，正确的是（）。2018",[549,551,553,555],{"key":20,"text":550,"correct":22},"金属保护层应自上而下敷设",{"key":24,"text":552,"correct":22},"环向接缝宜采用咬接",{"key":28,"text":554,"correct":22},"纵向接缝宜采用插接",{"key":31,"text":556,"correct":26},"搭接或插接尺寸应为30～50m",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},1113118,"下列接缝形式中，不用于绝热工程金属保护层施工的是（ ）。2019",[561,563,565,567],{"key":20,"text":562,"correct":22},"搭接形式",{"key":24,"text":564,"correct":26},"对接形式",{"key":28,"text":566,"correct":22},"插接形式",{"key":31,"text":568,"correct":22},"咬接形式",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":28,"analysis":33},1113119,"炉窑砌筑时，吊挂拱顶锁砖应遵循（）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"不宜锁得太紧",{"key":24,"text":576,"correct":22},"整体同时锁紧",{"key":28,"text":578,"correct":26},"分环锁紧，锁紧度一致",{"key":31,"text":580,"correct":22},"分段锁紧，每段锁紧度一致",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":28,"analysis":33},1113120,"根据《工业炉砌筑工程施工及验收规范》，不属于工序交接证明书内容的是（）。2011",[585,587,589,591],{"key":20,"text":586,"correct":22},"隐蔽工程验收合格的证明",{"key":24,"text":588,"correct":22},"焊接严密性试验合格的证明",{"key":28,"text":590,"correct":26},"耐火材料的验收合格证明",{"key":31,"text":592,"correct":22},"上道工序成果的保护要求",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":31,"analysis":33},1113121,"可用作隔热耐火砖的是（）。",[597,599,601,603],{"key":20,"text":598,"correct":22},"镁砖",{"key":24,"text":600,"correct":22},"镁铝砖",{"key":28,"text":602,"correct":22},"碳砖",{"key":31,"text":604,"correct":26},"高铝砖",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":31,"analysis":33},1113122,"下列耐火材料中，属于酸性耐火材料的是（）。",[609,610,611,612],{"key":20,"text":598,"correct":22},{"key":24,"text":602,"correct":22},{"key":28,"text":604,"correct":22},{"key":31,"text":613,"correct":26},"硅砖",[615,618,621,624,627,630],{"id":15,"name":616,"category":7,"favorite":617},"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":15},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":628,"name":629,"category":7,"favorite":8},534,"BIM工程师",{"id":631,"name":629,"category":7,"favorite":8},535]