[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":621},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,24,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,297,309,321,333,345,357,369,381,393,405,416,428,440,452,464,476,488,500,515,527,539,551,563,575,586,597,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1113022,1,"单选题","埋没在基础上的沉降观测点，第一次观测应在（）进行。2016",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","观测点埋设后",true,{"key":24,"text":25,"correct":26},"B","设备底座就位后",false,{"key":28,"text":29,"correct":26},"C","设备安装完成后",{"key":31,"text":32,"correct":26},"D","设备调整后","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1113023,"设备安装标高基准点一般埋设在（）且便于观测的位置。2011",[38,40,42,44],{"key":20,"text":39,"correct":26},"基础中心",{"key":24,"text":41,"correct":22},"基础边缘",{"key":28,"text":43,"correct":26},"基础表面",{"key":31,"text":45,"correct":26},"基础外面",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1113024,"利用经纬仪和检定尺，根据（）原理测量基准线。",[50,52,54,56],{"key":20,"text":51,"correct":26},"垂直平分线",{"key":24,"text":53,"correct":26},"平行线",{"key":28,"text":55,"correct":22},"两点成一线",{"key":31,"text":57,"correct":26},"直角",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1113025,"确定待定位点的方法是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"水平角测量法",{"key":24,"text":65,"correct":26},"三角测量法",{"key":28,"text":67,"correct":26},"水准测量法",{"key":31,"text":69,"correct":26},"三边测量法",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1113026,"管线中心定位测量中，不属于管线主点位置的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"管线的起点",{"key":24,"text":77,"correct":26},"管线的转折点",{"key":28,"text":79,"correct":22},"管线的中点",{"key":31,"text":81,"correct":26},"管线的终点",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1113027,"某厂房柱安装时，应使用（）测量铅垂度。",[86,88,90,92],{"key":20,"text":87,"correct":26},"光学水准仪",{"key":24,"text":89,"correct":26},"激光准直仪",{"key":28,"text":91,"correct":26},"全站仪",{"key":31,"text":93,"correct":22},"光学经纬仪",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1113028,"常用于高层建筑、烟囱、电梯的倾斜观察的激光测量仪器是（）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"激光经纬仪",{"key":24,"text":101,"correct":22},"激光垂线仪",{"key":28,"text":103,"correct":26},"激光平面仪",{"key":31,"text":105,"correct":26},"激光指向仪",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1113029,"关于长距离输电线路铁塔基础设施测量的说法，正确的是（）。2017",[110,112,114,116],{"key":20,"text":111,"correct":26},"根据沿途实际情况测设铁塔基础",{"key":24,"text":113,"correct":26},"采用钢尺量距时的丈量长度适宜于80～10m",{"key":28,"text":115,"correct":22},"一段架空线路的测量视距长度不宜超过400m",{"key":31,"text":117,"correct":26},"大跨越档距之间不宜采用解析法测量",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1113030,"地下管线工程回填前，不需要测量的项目是（ ）。2019.3",[122,124,126,128],{"key":20,"text":123,"correct":26},"管线起点坐标",{"key":24,"text":125,"correct":26},"窨井位置坐标",{"key":28,"text":127,"correct":26},"管线顶端标高",{"key":31,"text":129,"correct":22},"管线中心标高",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1113031,"（2020年真题）机电安装工程测量的基本程序内容中，不包括（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"设置纵横中心线",{"key":24,"text":137,"correct":22},"仪器校准或检定",{"key":28,"text":139,"correct":26},"安装过程测量控制",{"key":31,"text":141,"correct":26},"设置标高基准点",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1113032,"在焊接工艺评定中，主持评定工作和对焊接及实验结果进行综合评价的人员，应是（）。2010",[146,148,150,152],{"key":20,"text":147,"correct":26},"试验工程师",{"key":24,"text":149,"correct":22},"焊接工程师",{"key":28,"text":151,"correct":26},"焊接技师",{"key":31,"text":153,"correct":26},"质量工程师",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1113033,"当增加焊接工艺评定的补加因素时按增加的补加因素增焊（）试件进行试验。2012",[158,160,162,164],{"key":20,"text":159,"correct":26},"拉伸",{"key":24,"text":161,"correct":22},"冲击",{"key":28,"text":163,"correct":26},"弯曲",{"key":31,"text":165,"correct":26},"剪切",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1113034,"为验证拟定的焊件工艺的正确性所进行的试验过程及结果评价是（）2015",[170,172,174,176],{"key":20,"text":171,"correct":26},"焊接作业卡",{"key":24,"text":173,"correct":22},"焊接工艺评定",{"key":28,"text":175,"correct":26},"焊接质量证明文件",{"key":31,"text":177,"correct":26},"焊接作业规程",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1113035,"利用低倍放大镜观察焊缝表面，目的是检查焊缝是否有（）等表面缺陷。2010",[182,184,186,188],{"key":20,"text":183,"correct":26},"余高",{"key":24,"text":185,"correct":22},"气孔",{"key":28,"text":187,"correct":26},"焊瘤",{"key":31,"text":189,"correct":26},"凹陷",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1113036,"关于描述焊接工艺评定的目的，错误的是（）。2016",[194,196,198,200],{"key":20,"text":195,"correct":22},"验证母材的可焊性",{"key":24,"text":197,"correct":26},"验证拟定的工艺指导书是否正确",{"key":28,"text":199,"correct":26},"为制定正式的焊接工艺卡提供可靠的技术依据",{"key":31,"text":201,"correct":26},"评定施焊单位是否有能力焊出符合技术规范要求的焊接头",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1113037,"一般情况下，焊接厚度为3.5m的焊件，选用的焊条直径是（）2014",[206,208,210,212],{"key":20,"text":207,"correct":26},"2m",{"key":24,"text":209,"correct":22},"3.2m",{"key":28,"text":211,"correct":26},"4m",{"key":31,"text":213,"correct":26},"5m",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},1113038,"当采用电弧焊焊接，环境风速达到（）m\u002Fs时，就应采取适当的防护措施。2011",[218,220,222,224],{"key":20,"text":219,"correct":26},"4",{"key":24,"text":221,"correct":26},"6",{"key":28,"text":223,"correct":22},"8",{"key":31,"text":225,"correct":26},"10",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},1113039,"下列焊接方法中，焊接飞溅最大的焊接方法是（）。2017",[230,232,234,236],{"key":20,"text":231,"correct":26},"气焊",{"key":24,"text":233,"correct":26},"手工电弧焊",{"key":28,"text":235,"correct":22},"CO2气体保护焊",{"key":31,"text":237,"correct":26},"埋弧自动焊",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},1113040,"下列试验中，不属于焊后致密性试验的是（）。2018",[242,244,246,248],{"key":20,"text":243,"correct":26},"氨气试验",{"key":24,"text":245,"correct":26},"煤油试漏",{"key":28,"text":247,"correct":22},"液压强度试验",{"key":31,"text":249,"correct":26},"真空箱试验",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":33},1113041,"关于千斤顶使用要求的说法，错误的是（）。2014",[254,256,258,260],{"key":20,"text":255,"correct":26},"垂直使用时，作用力应通过承压中心",{"key":24,"text":257,"correct":26},"水平使用时，应有可靠的支撑",{"key":28,"text":259,"correct":22},"随着工件的升降，不得调整保险垫块的高度",{"key":31,"text":261,"correct":26},"顶部应有足够的工作面积",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1113042,"吊装工程专项方案专家论证会应由（）组织。2015",[266,268,270,272],{"key":20,"text":267,"correct":26},"建设单位",{"key":24,"text":269,"correct":26},"设计单位",{"key":28,"text":271,"correct":26},"监理单位",{"key":31,"text":273,"correct":22},"施工总承包单位",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},1113043,"起重吊装中，安全系数是4.5的6×19钢丝绳宜做（）。2016",[278,280,282,284],{"key":20,"text":279,"correct":22},"缆风绳",{"key":24,"text":281,"correct":26},"滑轮组跑绳",{"key":28,"text":283,"correct":26},"吊索",{"key":31,"text":285,"correct":26},"用于载人的绳索",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":28,"analysis":33},1113044,"使用卷扬机吊装时，余留在卷筒上的钢丝绳不得少于（）圈。",[290,292,294,295],{"key":20,"text":291,"correct":26},"2",{"key":24,"text":293,"correct":26},"3",{"key":28,"text":219,"correct":22},{"key":31,"text":296,"correct":26},"5",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":28,"analysis":33},1113045,"大型龙门起重机设备吊装宜选用的吊装方法是（）。2012",[301,303,305,307],{"key":20,"text":302,"correct":26},"旋转吊装法",{"key":24,"text":304,"correct":26},"超高空斜承索吊运设备吊装法",{"key":28,"text":306,"correct":22},"计算机控制集群千斤顶整体吊装法",{"key":31,"text":308,"correct":26},"气压顶升法",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},1113046,"下列取值系数中，属于不均衡载荷系数取值范围的是（）。",[313,315,317,319],{"key":20,"text":314,"correct":26},"1.05",{"key":24,"text":316,"correct":22},"1.2",{"key":28,"text":318,"correct":26},"1.35",{"key":31,"text":320,"correct":26},"1.5",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},1113047,"某设备重量85t，施工现场拟采用两台自行式起重机抬吊方案进行就位，其中索吊具重量3t，自制专用抬梁重量5t，风力影响可略。制定吊装方案时，最小计算载荷为（）。2013",[325,327,329,331],{"key":20,"text":326,"correct":26},"106.48t",{"key":24,"text":328,"correct":26},"108.90t",{"key":28,"text":330,"correct":22},"112.53t",{"key":31,"text":332,"correct":26},"12.76t",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":28,"analysis":33},1113048,"起重量在（）以上起重设备安装工程，应提交专业方案论证报告。",[337,339,341,343],{"key":20,"text":338,"correct":26},"10kN",{"key":24,"text":340,"correct":26},"20kN",{"key":28,"text":342,"correct":22},"300kN",{"key":31,"text":344,"correct":26},"40kN",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":31,"analysis":33},1113049,"起重吊装采用2个以上吊点起吊时，下列吊索与水平线夹角，宜选用的角度是（）。2017",[349,351,353,355],{"key":20,"text":350,"correct":26},"45°",{"key":24,"text":352,"correct":26},"50°",{"key":28,"text":354,"correct":26},"5°",{"key":31,"text":356,"correct":22},"60°",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},1113050,"吊装作业若采取同类型、同规格起重机双机抬吊时，单机载荷最大不得超过额定起重量的（）。2018",[361,363,365,367],{"key":20,"text":362,"correct":26},"75%",{"key":24,"text":364,"correct":22},"80%",{"key":28,"text":366,"correct":26},"85%",{"key":31,"text":368,"correct":26},"90%",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":31,"analysis":33},1113051,"设备安装工程的永久基准点使用的材料，最好采用（）2014",[373,375,377,379],{"key":20,"text":374,"correct":26},"钢铆钉",{"key":24,"text":376,"correct":26},"木桩",{"key":28,"text":378,"correct":26},"普通角钢",{"key":31,"text":380,"correct":22},"铜棒",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":20,"analysis":33},1113052,"在室温条件下，工作温度较高的干燥机与传动电机联轴器找正时，两端面间隙在允许偏差内应选择（）。2013",[385,387,389,391],{"key":20,"text":386,"correct":22},"较大值",{"key":24,"text":388,"correct":26},"中间值",{"key":28,"text":390,"correct":26},"较小值",{"key":31,"text":392,"correct":26},"最小值",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":31,"analysis":33},1113053,"机械设备安装的二次灌浆在（）地脚螺栓紧固、各项检测项目合格后进行。2010",[397,399,401,403],{"key":20,"text":398,"correct":26},"设备清洗",{"key":24,"text":400,"correct":26},"设备调试",{"key":28,"text":402,"correct":26},"设备试运行",{"key":31,"text":404,"correct":22},"设备找正找平",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":28,"analysis":33},1113054,"设备吊装就位的紧后工序是（）2012",[409,410,412,414],{"key":20,"text":398,"correct":26},{"key":24,"text":411,"correct":26},"设备灌浆",{"key":28,"text":413,"correct":22},"设备安装调整",{"key":31,"text":415,"correct":26},"垫铁安装",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":24,"analysis":33},1113055,"设备基础的质量因素中，影响安装精度的主要是（）2014",[420,422,424,426],{"key":20,"text":421,"correct":26},"浇注方式和时间",{"key":24,"text":423,"correct":22},"沉降和强度",{"key":28,"text":425,"correct":26},"表面积和平整度",{"key":31,"text":427,"correct":26},"温度和湿度",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},1113056,"现场组装的大型设备，各运动部件之间的相对运动精度不包括（）。2018",[432,434,436,438],{"key":20,"text":433,"correct":26},"直线运动精度",{"key":24,"text":435,"correct":26},"圆周运动精度",{"key":28,"text":437,"correct":26},"传动精度",{"key":31,"text":439,"correct":22},"配合精度",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":33},1113057,"下列参数中，属于位置误差的是（）。2011",[444,446,448,450],{"key":20,"text":445,"correct":26},"直线度",{"key":24,"text":447,"correct":26},"平面度",{"key":28,"text":449,"correct":22},"平行度",{"key":31,"text":451,"correct":26},"圆度",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},1113058,"不影响机械设备安装精度的因素是（）。2010",[456,458,460,462],{"key":20,"text":457,"correct":22},"设备制造",{"key":24,"text":459,"correct":26},"垫铁",{"key":28,"text":461,"correct":26},"二次灌浆",{"key":31,"text":463,"correct":26},"设备基础",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":20,"analysis":33},1113059,"下列设备中，不属于用电设备的是（）。2012",[468,470,472,474],{"key":20,"text":469,"correct":22},"低压配电柜",{"key":24,"text":471,"correct":26},"电动机",{"key":28,"text":473,"correct":26},"电加热器",{"key":31,"text":475,"correct":26},"照明灯具",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":24,"analysis":33},1113060,"电力架空线路需在横担固定处加装软垫的是（）。2018",[480,482,484,486],{"key":20,"text":481,"correct":26},"转角杆横担",{"key":24,"text":483,"correct":22},"全瓷式瓷横担",{"key":28,"text":485,"correct":26},"终端杆横担",{"key":31,"text":487,"correct":26},"耐张杆横担",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},1113061,"并列明敷电缆的中间接头应（）。2013",[492,494,496,498],{"key":20,"text":493,"correct":26},"位置相同",{"key":24,"text":495,"correct":22},"用托板托置固定",{"key":28,"text":497,"correct":26},"配备保护盒",{"key":31,"text":499,"correct":26},"安装检测器",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":20,"analysis":33},1113062,"【2018 案例三】 背景资料 某施工单位承建一项建筑机电工程，施工单位组建项目部具体实施，项目部电气施工班组负责建筑电气和智能化分部分项的施工。 施工前，电气工长根据施工图编制了“电缆需用计划”、“电缆用量统计表”，作为施工图预算、成本分析和材料采购的依据，电缆盘运到现场并具备敷设条件后，电工班组按照“电缆需用计划”组织实施了电缆敷设及电缆接头制作。 施工中建设单位增加几台小功率排污泵，向项目部下达施工指令，项目部以无设计变更为由拒绝执行。 在电缆敷设后的检查中，动力照明电缆和智能化电缆分层独立桥架敷设，发现两种电缆桥架内，都有中间接头，并列电缆的中间接头位置相同。 电气施工班组按照电缆敷设的施工程序完工并经检查合格后，在各回路电缆装设标志牌，进行了质量验收。",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"问题：",{"key":24,"text":507,"correct":26},"1．电工班组按照“电缆需用计划”实施电缆敷设的做法是否正确？合理减少电缆接头的措施有哪些？",{"key":28,"text":509,"correct":26},"2．建设单位增加排污泵项目部拒绝执行是否正确？指出设计变更的程序。",{"key":31,"text":511,"correct":26},"3．指出电缆中间接头位置有哪些错误，如何整改？",{"key":513,"text":514,"correct":26},"E","4．电缆敷设分项工程质量验收合格的规定有哪些？",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":24,"analysis":33},1113063,"管道工程施工程序中管道安装的紧后工序是（）。2012",[519,521,523,525],{"key":20,"text":520,"correct":26},"管道系统防腐",{"key":24,"text":522,"correct":22},"管道系统检验",{"key":28,"text":524,"correct":26},"管道系统绝热",{"key":31,"text":526,"correct":26},"管道系统清洗",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":28,"analysis":33},1113064,"属于按输送介质的性质划分的管道是（）。2011",[531,533,535,537],{"key":20,"text":532,"correct":26},"真空管道",{"key":24,"text":534,"correct":26},"金属管道",{"key":28,"text":536,"correct":22},"热力管道",{"key":31,"text":538,"correct":26},"压力管道",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":31,"analysis":33},1113065,"管道滑动支架以支承面中心为起点进行反方向安装的偏移量应为位移值的（）2014",[543,545,547,549],{"key":20,"text":544,"correct":26},"1\u002F5",{"key":24,"text":546,"correct":26},"1\u002F4",{"key":28,"text":548,"correct":26},"1\u002F3",{"key":31,"text":550,"correct":22},"1\u002F2",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":24,"analysis":33},1113066,"管道系统吹扫与清洗应在（）进行。2010",[555,557,559,561],{"key":20,"text":556,"correct":26},"无损检测合格后液压试验前",{"key":24,"text":558,"correct":22},"液压试验合格后气体泄漏试验前",{"key":28,"text":560,"correct":26},"气体泄漏试验合格后涂漆、绝热施工前",{"key":31,"text":562,"correct":26},"涂漆、绝热施工检验合格后交工前",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":28,"analysis":33},1113067,"下列管道试验中，可结合试车一并进行的是（）。",[567,569,571,573],{"key":20,"text":568,"correct":26},"真空试验",{"key":24,"text":570,"correct":26},"通球试验",{"key":28,"text":572,"correct":22},"泄漏性试验",{"key":31,"text":574,"correct":26},"压力试验",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":31,"analysis":33},1113068,"按照建筑给水、排水、供热及采暖工程的一般施工程序，在完成了管道安装之后，下步应进行的施工程序是（）。2010",[579,581,583,584],{"key":20,"text":580,"correct":26},"管道附件检验",{"key":24,"text":582,"correct":26},"管道防腐绝热",{"key":28,"text":526,"correct":26},{"key":31,"text":585,"correct":22},"管道系统试验",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":31,"analysis":33},1113069,"电站锅炉本体受热面组合安装时，设备清点检查的紧后工序是（）。2013",[590,592,594,596],{"key":20,"text":591,"correct":26},"找正划线",{"key":24,"text":593,"correct":26},"管子就位",{"key":28,"text":595,"correct":26},"对口焊接",{"key":31,"text":570,"correct":22},{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":28,"analysis":33},1113070,"锅炉钢架组件就位找正时，一般用水准仪检查大梁的（）。",[601,603,605,607],{"key":20,"text":602,"correct":26},"中心位置",{"key":24,"text":604,"correct":26},"垂直度",{"key":28,"text":606,"correct":22},"水平度",{"key":31,"text":608,"correct":26},"挠度",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":24,"analysis":33},1113071,"锅炉系统安装程序中，水冷壁安装的紧前工序是（）。2018",[613,615,617,619],{"key":20,"text":614,"correct":26},"钢架组合安装",{"key":24,"text":616,"correct":22},"集箱安装",{"key":28,"text":618,"correct":26},"汽包安装",{"key":31,"text":620,"correct":26},"省煤器安装",[622,625,628,631,634,637],{"id":15,"name":623,"category":7,"favorite":624},"领导干部任职前廉政法规知识测试题",92,{"id":626,"name":627,"category":7,"favorite":15},595,"建筑结构与设备",{"id":629,"name":630,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":632,"name":633,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":635,"name":636,"category":7,"favorite":8},534,"BIM工程师",{"id":638,"name":636,"category":7,"favorite":8},535]