[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":598},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,20,50,2160,[13,34,46,58,70,82,94,106,118,129,138,150,162,174,186,198,210,222,234,242,254,266,278,290,302,314,326,338,347,359,371,383,392,403,415,427,435,445,457,469,481,493,505,517,529,541,553,562,574,586],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1112813,1,"单选题","下列危险源中，属于第一类危险源的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","电缆破皮",true,{"key":24,"text":25,"correct":26},"B","机械设备性能低下",false,{"key":28,"text":29,"correct":26},"C","酒后作业",{"key":31,"text":32,"correct":26},"D","高处作业","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1112814,"下列人员不属于项目部工地职业健康安全管理范围的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"分承包方作业人员",{"key":24,"text":41,"correct":26},"业主采购供方送达设备人员",{"key":28,"text":43,"correct":26},"政府工地监管巡查人员",{"key":31,"text":45,"correct":22},"工地围挡外行走人员",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1112815,"下列危险源中，属于重大危险源的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"运送变压器车单侧轮胎陷入泥坑",{"key":24,"text":53,"correct":26},"汽车起重机支腿下方地耐力不详",{"key":28,"text":55,"correct":22},"临建暂存焊接检测的γ射线源",{"key":31,"text":57,"correct":26},"不锈钢酸洗槽存放酸液10天",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1112816,"火灾事故的重大危险源不包括（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"无用火管理规定",{"key":24,"text":65,"correct":22},"电缆敷设不满足要求",{"key":28,"text":67,"correct":26},"禁火处无明显标识",{"key":31,"text":69,"correct":26},"消防设施不完备",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1112818,"现场道路、加工区、材料堆放区宜及时进行地面硬化的措施，是环境保护的（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"光污染",{"key":24,"text":77,"correct":22},"控制扬尘控制",{"key":28,"text":79,"correct":26},"建筑垃圾控制",{"key":31,"text":81,"correct":26},"噪声与振动控制",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1112819,"在下列沟通协调内容中，属于施工现场内部的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"设计单位图纸交付顺序",{"key":24,"text":89,"correct":26},"征求监理单位对施工中的意见",{"key":28,"text":91,"correct":22},"施工机具的优化配置",{"key":31,"text":93,"correct":26},"业主提供的设备的交接",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1112820,"下列属于施工项目内部沟通协调的主要对象是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"设计单位",{"key":24,"text":101,"correct":26},"供水单位",{"key":28,"text":103,"correct":26},"村民",{"key":31,"text":105,"correct":22},"专业分包商",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1112821,"项目部对劳务分承包单位协调管理的重点是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"施工进度的安排",{"key":24,"text":113,"correct":26},"质量安全制度制定",{"key":28,"text":115,"correct":26},"工程资料移交",{"key":31,"text":117,"correct":22},"作业计划的安排",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1112822,"制定绿色施工管理制度，负责绿色施工的组织实施，是（ ）的绿色施工职责。",[122,124,125,127],{"key":20,"text":123,"correct":26},"建设单位",{"key":24,"text":99,"correct":26},{"key":28,"text":126,"correct":26},"监理单位",{"key":31,"text":128,"correct":22},"施工单位",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":28,"analysis":33},1112823,"绿色施工评价中，单位工程施工阶段评价应由（ ）组织。",[133,134,135,136],{"key":20,"text":123,"correct":26},{"key":24,"text":128,"correct":26},{"key":28,"text":126,"correct":22},{"key":31,"text":137,"correct":26},"政府主管部门",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":31,"analysis":33},1112824,"所有施工场点标识出人行通道并用（ ）隔离。",[142,144,146,148],{"key":20,"text":143,"correct":26},"安全带",{"key":24,"text":145,"correct":26},"隔离墩",{"key":28,"text":147,"correct":26},"防护棚",{"key":31,"text":149,"correct":22},"隔离布带",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":33},1112825,"下列属于外部沟通协调内容的是（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":26},"各专业管线的综合布置",{"key":24,"text":157,"correct":22},"重大设备安装方案的确定",{"key":28,"text":159,"correct":26},"组织现场样板工程的参观学习",{"key":31,"text":161,"correct":26},"施工用设备和材料的有序供应",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":31,"analysis":33},1112826,"对于建设单位、监理单位、总包单位等单位的沟通协调，沟通方法应以（ ）为主。",[166,168,170,172],{"key":20,"text":167,"correct":26},"定期走访",{"key":24,"text":169,"correct":26},"利用工地宣传工具",{"key":28,"text":171,"correct":26},"个别交流",{"key":31,"text":173,"correct":22},"会议座谈",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},1112827,"在下列控制措施中，属于绿色施工环境保护扬尘控制的是（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":26},"对建筑垃圾进行分类",{"key":24,"text":181,"correct":22},"施工现场出口应设置洗车槽",{"key":28,"text":183,"correct":26},"施工后应恢复被施工活动破坏的植被",{"key":31,"text":185,"correct":26},"使用低噪声、低振动的机具",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":28,"analysis":33},1112828,"在地下设施、文物和资源保护方面，做法错误的是（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":26},"施工前应调查清楚地下各种设施",{"key":24,"text":193,"correct":26},"保证施工场地周边的各类管线、管道、建筑物、构筑物的安全",{"key":28,"text":195,"correct":22},"因拆迁需要，可不保证施工场地周边的各类管线、管道、建筑物、构筑物的安全",{"key":31,"text":197,"correct":26},"施工过程中一旦发现文物，立即停止施工",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":31,"analysis":33},1112829,"在现场平面布置中，施工现场仓库、加工厂、作业棚等布置应尽量靠近已有交通线路，缩短运输距离，属于绿色施工“四节一环保”中的（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":26},"节能与能源利用",{"key":24,"text":205,"correct":26},"节材与材料资源利用",{"key":28,"text":207,"correct":26},"节水与水资源利用",{"key":31,"text":209,"correct":22},"节地与施工用地保护",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},1112830,"配电系统和施工机具应采用可靠的接零或接地保护，配电箱和开关箱均应设（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":26},"熔断器保护",{"key":24,"text":217,"correct":22},"二级漏电保护",{"key":28,"text":219,"correct":26},"刀闸开关保护",{"key":31,"text":221,"correct":26},"一级保护",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":28,"analysis":33},1112831,"易燃易爆及有毒有害物品应单独存放，并要与生活区和施工区保持规定的（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":26},"行人通道",{"key":24,"text":229,"correct":26},"工作范围",{"key":28,"text":231,"correct":22},"安全距离",{"key":31,"text":233,"correct":26},"活动区域",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":31,"analysis":33},1112832,"单位工程绿色施工评价应由（ ）组织。",[238,239,240,241],{"key":20,"text":128,"correct":26},{"key":24,"text":99,"correct":26},{"key":28,"text":126,"correct":26},{"key":31,"text":123,"correct":22},{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":31,"analysis":33},1112833,"绿色施工评价的频次是（ ）。",[246,248,250,252],{"key":20,"text":247,"correct":26},"绿色施工项目自评次数每月不应少于2次，且每阶段不应少于2次",{"key":24,"text":249,"correct":26},"绿色施工项目自评次数每月不应少于2次，且每阶段不应少于1次",{"key":28,"text":251,"correct":26},"绿色施工项目自评次数每月不应少于1次，且每阶段不应少于2次",{"key":31,"text":253,"correct":22},"绿色施工项目自评次数每月不应少于1次，且每阶段不应少于1次",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":20,"analysis":33},1112835,"降低机电工程项目成本的合同措施不包括（ ）。",[258,260,262,264],{"key":20,"text":259,"correct":22},"建立成本管理体系",{"key":24,"text":261,"correct":26},"选择适当的合同结构模式",{"key":28,"text":263,"correct":26},"必要的合同风险防控对策",{"key":31,"text":265,"correct":26},"全过程的合同控制",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":24,"analysis":33},1112836,"成本计划编制程序中，确定项目总体成本目标之后，下一步应做的是（ ）。",[270,272,274,276],{"key":20,"text":271,"correct":26},"预测项目成本",{"key":24,"text":273,"correct":22},"编制项目总体成本计划",{"key":28,"text":275,"correct":26},"分解成本目标",{"key":31,"text":277,"correct":26},"针对成本计划制定相应的控制措施",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":24,"analysis":33},1112837,"（ ）是控制项目成本支出的标准，也是成本管理的目标。",[282,284,286,288],{"key":20,"text":283,"correct":26},"项目考核成本",{"key":24,"text":285,"correct":22},"项目计划成本",{"key":28,"text":287,"correct":26},"项目实际成本",{"key":31,"text":289,"correct":26},"项目预算成本",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":24,"analysis":33},1112838,"下列项目成本控制的内容，属于施工阶段的是（ ）。",[294,296,298,300],{"key":20,"text":295,"correct":26},"制定科学先进、经济合理的施工方案",{"key":24,"text":297,"correct":22},"加强施工任务单和限额领料单的管理",{"key":28,"text":299,"correct":26},"编制明细而具体的施工项目成本计划",{"key":31,"text":301,"correct":26},"以投标报价为依据确定项目成本目标",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":31,"analysis":33},1112839,"下列成本中，不属于工程设备成本控制内容的是（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":26},"设备采购成本",{"key":24,"text":309,"correct":26},"设备运输成本",{"key":28,"text":311,"correct":26},"设备质量成本",{"key":31,"text":313,"correct":22},"设备安装成本",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":28,"analysis":33},1112840,"施工机具费的控制措施不包括（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":26},"按施工方案和施工技术措施中规定的机种和数量安排使用",{"key":24,"text":321,"correct":26},"提高施工机械的利用率和完好率",{"key":28,"text":323,"correct":22},"严格控制租赁施工机械的使用",{"key":31,"text":325,"correct":26},"严格控制机械设备进出场时间",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":31,"analysis":33},1112841,"在保修期内，建设工程质量是由于建设单位提供的设备、材料等质量不良造成的，应由（ ）。",[330,332,334,336],{"key":20,"text":331,"correct":26},"施工单位承担修理费用和负责修理",{"key":24,"text":333,"correct":26},"双方商定各自经济责任，施工单位负责修理",{"key":28,"text":335,"correct":26},"设计单位承担修理费用，施工单位协助修理",{"key":31,"text":337,"correct":22},"建设单位承担修理费用，施工单位协助修理",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":28,"analysis":33},1112842,"在保修期内，座谈会式回访是由（ ）组织座谈会或意见听取会。",[342,343,344,345],{"key":20,"text":128,"correct":26},{"key":24,"text":99,"correct":26},{"key":28,"text":123,"correct":22},{"key":31,"text":346,"correct":26},"供货单位",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":24,"analysis":33},1112843,"根据《建设工程质量管理条例》规定，建设工程在正常使用条件下，电气管线、给水排水管道、设备安装工程保修期为（ ）年。",[351,353,355,357],{"key":20,"text":352,"correct":26},"1",{"key":24,"text":354,"correct":22},"2",{"key":28,"text":356,"correct":26},"3",{"key":31,"text":358,"correct":26},"4",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":31,"analysis":33},1112844,"建设工程的保修期自（ ）之日起计算。",[363,365,367,369],{"key":20,"text":364,"correct":26},"提交竣工验收报告",{"key":24,"text":366,"correct":26},"发包方规定",{"key":28,"text":368,"correct":26},"发包方与承包方约定",{"key":31,"text":370,"correct":22},"竣工验收合格",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":28,"analysis":33},1112845,"在保修期内，施工单位为了解在工程施工过程中所采用的“四新”等使用情况，发现问题及时解决，所做的回访是（ ）。",[375,377,379,381],{"key":20,"text":376,"correct":26},"冬季回访",{"key":24,"text":378,"correct":26},"夏季回访",{"key":28,"text":380,"correct":22},"技术性回访",{"key":31,"text":382,"correct":26},"保修期满前回访",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":31,"analysis":33},1112846,"检查锅炉房及供暖系统的运行情况，一般安排在（ ）。",[387,388,390,391],{"key":20,"text":378,"correct":26},{"key":24,"text":389,"correct":26},"春季回访",{"key":28,"text":382,"correct":26},{"key":31,"text":376,"correct":22},{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":24,"analysis":33},1112847,"通过察看机电安装工程使用情况或生产后的运转情况的回访方式，称为（ ）。",[396,397,399,401],{"key":20,"text":380,"correct":26},{"key":24,"text":398,"correct":22},"巡回式回访",{"key":28,"text":400,"correct":26},"座谈会式回访",{"key":31,"text":402,"correct":26},"信息传递是回访",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":28,"analysis":33},1112848,"施工记录资料不包括（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":26},"图纸会审记录",{"key":24,"text":410,"correct":26},"设计变更单",{"key":28,"text":412,"correct":22},"分部工程使用功能检测记录",{"key":31,"text":414,"correct":26},"隐蔽工程验收记录",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":31,"analysis":33},1112849,"计算工程单价的依据不包括（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":26},"人工单价",{"key":24,"text":422,"correct":26},"材料价格",{"key":28,"text":424,"correct":26},"机械台班费",{"key":31,"text":426,"correct":22},"税金",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":20,"analysis":33},1112850,"单机试运行由（ ）单位负责。",[431,432,433,434],{"key":20,"text":128,"correct":22},{"key":24,"text":123,"correct":26},{"key":28,"text":99,"correct":26},{"key":31,"text":126,"correct":26},{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":24,"analysis":33},1112851,"试运行方案由项目总工程师组织编制经（ ）审定。",[439,441,443,444],{"key":20,"text":440,"correct":26},"项目经理",{"key":24,"text":442,"correct":22},"施工企业总工程师",{"key":28,"text":123,"correct":26},{"key":31,"text":126,"correct":26},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":24,"analysis":33},1112853,"关于30kW水泵单机试运行的说法，正确的是（ ）。",[449,451,453,455],{"key":20,"text":450,"correct":26},"试运转的介质必须采用清水",{"key":24,"text":452,"correct":22},"流量不应小于额定值的20%",{"key":28,"text":454,"correct":26},"连续试运转时间不应少于15min",{"key":31,"text":456,"correct":26},"滚动轴承温度不应大于70℃",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},1112854,"用于工艺控制、质量检测及物资管理的计量器具是（ ）。",[461,463,465,467],{"key":20,"text":462,"correct":26},"A类计量器具",{"key":24,"text":464,"correct":22},"B类计量器具",{"key":28,"text":466,"correct":26},"C类计量器具",{"key":31,"text":468,"correct":26},"D类计量器具",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":33},1112855,"强制检定的计量器具范围不包括（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":26},"社会公用计量标准器具",{"key":24,"text":476,"correct":22},"部门和企业、事业单位使用的工作计量器具",{"key":28,"text":478,"correct":26},"用于贸易结算、安全防护的计量器具",{"key":31,"text":480,"correct":26},"用于环境监测的计量器具",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":24,"analysis":33},1112856,"计量器具准确度的“等”是根据（ ）确定。",[485,487,489,491],{"key":20,"text":486,"correct":26},"示值误差大小",{"key":24,"text":488,"correct":22},"扩展不确定大小",{"key":28,"text":490,"correct":26},"器具类型",{"key":31,"text":492,"correct":26},"检测内容",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":28,"analysis":33},1112857,"下列计量器具中，属于C类范围的是（ ）。",[497,499,501,503],{"key":20,"text":498,"correct":26},"焊接检验尺",{"key":24,"text":500,"correct":26},"水准仪",{"key":28,"text":502,"correct":22},"5m以下的钢卷尺",{"key":31,"text":504,"correct":26},"温度计",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":33},1112858,"B类计量器具可由工程项目部按《计量器具管理目录》规定，可以（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":26},"请法定计量检定机构定期来试验室现场校验",{"key":24,"text":512,"correct":22},"提交社会法定计量检定机构就近检定",{"key":28,"text":514,"correct":26},"经库管员验证合格后即可发放使用",{"key":31,"text":516,"correct":26},"由计量管理人员到现场巡视，及时更换",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":28,"analysis":33},1112859,"施工计量器具检定范畴不包括（ ）。",[521,523,525,527],{"key":20,"text":522,"correct":26},"强制检定工作计量器具",{"key":24,"text":524,"correct":26},"非强制检定工作计量器具",{"key":28,"text":526,"correct":22},"施工过程中使用的自制检具",{"key":31,"text":528,"correct":26},"企业使用的最高计量标准器具",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":24,"analysis":33},1112861,"检测器具的测量极限误差必须（ ）被测对象所能允许的测量极限误差。",[533,535,537,539],{"key":20,"text":534,"correct":26},"大于",{"key":24,"text":536,"correct":22},"不得大于",{"key":28,"text":538,"correct":26},"小于",{"key":31,"text":540,"correct":26},"不得小于",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":31,"analysis":33},1112863,"计量检测设备应有明显的（ ）标志，标明计量器具所处的状态。",[545,547,549,551],{"key":20,"text":546,"correct":26},"“可用”、“禁用”、“储存”",{"key":24,"text":548,"correct":26},"“合格”、“禁用”、“保存”",{"key":28,"text":550,"correct":26},"“可用”、“禁用”、“封存”",{"key":31,"text":552,"correct":22},"“合格”、“禁用”、“封存”",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":31,"analysis":33},1112864,"在设备定位放线中，使用的钢卷尺全长大于（ ）m时，必须进行校准。",[557,558,559,560],{"key":20,"text":354,"correct":26},{"key":24,"text":356,"correct":26},{"key":28,"text":358,"correct":26},{"key":31,"text":561,"correct":22},"5",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":24,"analysis":33},1112865,"强制检定的计量器具范围有：社会公用计量标准器具；部门和企业、事业单位使用的（ ）计量标准器具；用于贸易结算、安全防护、医疗卫生、环境监测等方面的列入计量器具强制检定目录的工作计量器具。",[566,568,570,572],{"key":20,"text":567,"correct":26},"重要",{"key":24,"text":569,"correct":22},"最高",{"key":28,"text":571,"correct":26},"常用",{"key":31,"text":573,"correct":26},"新型",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":28,"analysis":33},1112866,"施工企业使用强制检定的计量器具，应向指定的计量检定机构申请（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":26},"后续检定",{"key":24,"text":581,"correct":26},"使用检定",{"key":28,"text":583,"correct":22},"周期检定",{"key":31,"text":585,"correct":26},"仲裁检定",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":28,"analysis":33},1112867,"企业、事业单位的各项（ ），必须向与其主管部门同级的人民政府计量行政部门申请考核。经考核取得合格证的方可使用。",[590,592,594,596],{"key":20,"text":591,"correct":26},"标准计量器具",{"key":24,"text":593,"correct":26},"工作计量器具",{"key":28,"text":595,"correct":22},"最高计量标准",{"key":31,"text":597,"correct":26},"进口计量器具",[599,602,605,608,611,614],{"id":15,"name":600,"category":7,"favorite":601},"领导干部任职前廉政法规知识测试题",92,{"id":603,"name":604,"category":7,"favorite":15},595,"建筑结构与设备",{"id":606,"name":607,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":609,"name":610,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":612,"name":613,"category":7,"favorite":8},534,"BIM工程师",{"id":615,"name":613,"category":7,"favorite":8},535]