[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,2,50,2160,[13,34,46,58,70,82,94,106,118,130,142,152,160,172,183,195,207,219,231,243,255,267,279,288,300,312,324,336,348,360,372,383,395,407,419,431,440,452,464,476,488,500,512,524,536,548,560,572,584,596],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1111888,1,"单选题","吊装方案主要编制依据中的施工技术资料不包括（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","被吊设备设计制造图",false,{"key":24,"text":25,"correct":22},"B","设备基础施工图",{"key":27,"text":28,"correct":29},"C","吊装参数表",true,{"key":31,"text":32,"correct":22},"D","设计会审文件","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1111889,"吊装工程专项方案专家论证会应由（ ）组织。",[38,40,42,44],{"key":20,"text":39,"correct":22},"建设单位",{"key":24,"text":41,"correct":22},"设计单位",{"key":27,"text":43,"correct":22},"监理单位",{"key":31,"text":45,"correct":29},"施工总承包单位",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1111890,"下列起重机中，属于轻小型起重设备的有（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"起重行车",{"key":24,"text":53,"correct":29},"电动葫芦",{"key":27,"text":55,"correct":22},"桥架式起重机",{"key":31,"text":57,"correct":22},"缆索型起重机",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1111891,"在流动式起重机吊装重物前必须对其工作位置的地基进行处理，处理后按规定对地基进行（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"加固处理",{"key":24,"text":65,"correct":22},"钻孔试验",{"key":27,"text":67,"correct":29},"耐压力测试",{"key":31,"text":69,"correct":22},"设计强度校核",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1111892,"缆风绳属于桅杆式起重机的（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"桅杆本体",{"key":24,"text":77,"correct":22},"动力系统",{"key":27,"text":79,"correct":29},"稳定系统",{"key":31,"text":81,"correct":22},"起升系统",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1111893,"下列吊装方法中属于按照吊装工艺进行分类的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"吊车抬送法",{"key":24,"text":89,"correct":22},"液压提升吊装",{"key":27,"text":91,"correct":22},"直升飞机吊装",{"key":31,"text":93,"correct":22},"流动式起重机吊装",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1111894,"（ ）适用于在超高空吊装中、小型设备、山区的上山索道。如上海东方明珠高空吊运设备。",[98,100,102,104],{"key":20,"text":99,"correct":22},"无锚点推吊法",{"key":24,"text":101,"correct":22},"旋转法",{"key":27,"text":103,"correct":22},"滑移法",{"key":31,"text":105,"correct":29},"高空斜承索吊运法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1111896,"以下各种金属焊接描述错误的是（ ）",[110,112,114,116],{"key":20,"text":111,"correct":22},"钢结构工程焊接难度分为A（易）、B级（一般）、C级（较难）、D级（难）",{"key":24,"text":113,"correct":29},"铝和氧的化学结合力不强，不易产生未熔合、未焊透缺陷；",{"key":27,"text":115,"correct":22},"从事压力焊缝焊接工作的焊工，应持有《特种设备作业人员证》",{"key":31,"text":117,"correct":22},"焊后热处理可以减少金属焊接应力",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1111897,"锅炉受压元件安装前，应制定（ ），并进行焊接工艺评定。",[122,124,126,128],{"key":20,"text":123,"correct":22},"焊接工艺评定报告",{"key":24,"text":125,"correct":22},"焊接作业指导书",{"key":27,"text":127,"correct":29},"焊接工艺评定作业指导书",{"key":31,"text":129,"correct":22},"焊接施工方案",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1111898,"下列焊缝检查内容中属于GA类长输管道线路而不属于场站施工焊缝检查的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"外观检查",{"key":24,"text":137,"correct":22},"无损检测",{"key":27,"text":139,"correct":29},"力学性能",{"key":31,"text":141,"correct":22},"压力试验",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1111899,"指出以下选项中，属于焊前检验的是（ ）。",[146,148,150,151],{"key":20,"text":147,"correct":22},"目视检测",{"key":24,"text":149,"correct":29},"焊接环境的检查",{"key":27,"text":135,"correct":22},{"key":31,"text":137,"correct":22},{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},1111900,"锅炉受压元件安装前，应进行焊接工艺评定。焊接工艺评定合格后，应编制（ ）。",[156,157,158,159],{"key":20,"text":123,"correct":22},{"key":24,"text":125,"correct":29},{"key":27,"text":127,"correct":22},{"key":31,"text":129,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":24,"analysis":33},1111901,"每条焊道或焊层在下一道焊层覆盖前应清理干净，特别要注意（ ）位置。",[164,166,168,170],{"key":20,"text":165,"correct":22},"焊缝熔池",{"key":24,"text":167,"correct":29},"焊缝金属和熔合面结合处",{"key":27,"text":169,"correct":22},"焊缝周围",{"key":31,"text":171,"correct":22},"焊缝搭接",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":31,"analysis":33},1111902,"焊后热处理应符合的文件不包括（ ）。",[176,178,180,181],{"key":20,"text":177,"correct":22},"设计文件规定",{"key":24,"text":179,"correct":22},"施工标准.规范",{"key":27,"text":123,"correct":22},{"key":31,"text":182,"correct":29},"产品出厂合格证",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":24,"analysis":33},1111903,"用于焊接工艺评定试板焊接设备的选取范围只能是（ ）。",[187,189,191,193],{"key":20,"text":188,"correct":22},"压力容器专用的焊接设备",{"key":24,"text":190,"correct":29},"本单位的焊接设备",{"key":27,"text":192,"correct":22},"焊接工艺评定专用的焊接设备",{"key":31,"text":194,"correct":22},"焊接产品的焊接设备",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":20,"analysis":33},1111904,"焊接工艺评定过程中，拟定预焊接工艺规程之后，下一步要做的工作是（ ）。",[199,201,203,205],{"key":20,"text":200,"correct":29},"评定预焊接工艺规程",{"key":24,"text":202,"correct":22},"签发焊接工艺评定报告",{"key":27,"text":204,"correct":22},"制定焊接作业指导书",{"key":31,"text":206,"correct":22},"进行焊接作业",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":24,"analysis":33},1111905,"下列选项中，不属于焊前检验内容的是（ ）。",[211,213,215,217],{"key":20,"text":212,"correct":22},"获得了焊接工艺（作业）指导书",{"key":24,"text":214,"correct":29},"每条焊道在下一道焊层覆盖前清理干净",{"key":27,"text":216,"correct":22},"接受了技术交底",{"key":31,"text":218,"correct":22},"焊前预热的加热方法.加热宽度.保温要求.测温要求应符合规范要求",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":20,"analysis":33},1111907,"有预紧力的螺纹连接常用紧固方法不包括（ ）。",[223,225,227,229],{"key":20,"text":224,"correct":29},"双螺母锁紧法",{"key":24,"text":226,"correct":22},"测量伸长法",{"key":27,"text":228,"correct":22},"液压拉伸法",{"key":31,"text":230,"correct":22},"加热伸长法",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":24,"analysis":33},1111908,"轴承间隙的检测及调整中，轴颈与轴瓦的侧间隙可用（ ）测量。",[235,237,239,241],{"key":20,"text":236,"correct":22},"压铅法",{"key":24,"text":238,"correct":29},"塞尺",{"key":27,"text":240,"correct":22},"游标卡尺",{"key":31,"text":242,"correct":22},"千分表",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":20,"analysis":33},1111909,"设备灌浆可使用的灌浆料很多，下列材料中，不可作为设备二次灌浆使用的是（ ）。",[247,249,251,253],{"key":20,"text":248,"correct":29},"中石混凝土",{"key":24,"text":250,"correct":22},"无收缩混凝土",{"key":27,"text":252,"correct":22},"微膨胀混凝土",{"key":31,"text":254,"correct":22},"CGM高效无收缩灌浆料",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":24,"analysis":33},1111910,"设备灌浆对安装精度的影响主要是（ ）和密实度。",[259,261,263,265],{"key":20,"text":260,"correct":22},"硬度",{"key":24,"text":262,"correct":29},"强度",{"key":27,"text":264,"correct":22},"刚度",{"key":31,"text":266,"correct":22},"精度",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":31,"analysis":33},1111911,"现场组装的大型设备，各运动部件之间的相对运动精度不包括（ ）。",[271,273,275,277],{"key":20,"text":272,"correct":22},"直线运动精度",{"key":24,"text":274,"correct":22},"圆周运动精度",{"key":27,"text":276,"correct":22},"传动精度",{"key":31,"text":278,"correct":29},"配合精度",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":24,"analysis":33},1111912,"无负荷联动试运转由（ ）负责组织、指挥。",[283,284,286,287],{"key":20,"text":41,"correct":22},{"key":24,"text":285,"correct":29},"施工单位",{"key":27,"text":39,"correct":22},{"key":31,"text":43,"correct":22},{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":24,"analysis":33},1111913,"（ ）是指安装中通过移动设备的方法使设备以其指定的基线对准设定的基准线。",[292,294,296,298],{"key":20,"text":293,"correct":22},"找平",{"key":24,"text":295,"correct":29},"找正",{"key":27,"text":297,"correct":22},"找标高",{"key":31,"text":299,"correct":22},"设备调整",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":20,"analysis":33},1111914,"机械设备就位前，按（ ）并依据测量控制网或相关建筑物轴线等划定安装的基准线和基准点。",[304,306,308,310],{"key":20,"text":305,"correct":29},"工艺布置图",{"key":24,"text":307,"correct":22},"现场条件",{"key":27,"text":309,"correct":22},"相关标高线",{"key":31,"text":311,"correct":22},"设备结构图",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":31,"analysis":33},1111915,"下列属于设备基础常见质量通病的是（ ）。",[316,318,320,322],{"key":20,"text":317,"correct":22},"混凝土强度不够",{"key":24,"text":319,"correct":22},"混凝土配比不正确",{"key":27,"text":321,"correct":22},"基础中心线偏差过大",{"key":31,"text":323,"correct":29},"基础上平面标高超差",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":20,"analysis":33},1111916,"下列不属于影响机械设备安装精度因素的是（ ）。",[328,330,332,334],{"key":20,"text":329,"correct":29},"设备试运转",{"key":24,"text":331,"correct":22},"垫铁埋设",{"key":27,"text":333,"correct":22},"设备灌浆",{"key":31,"text":335,"correct":22},"设备基础",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":27,"analysis":33},1111917,"安装带悬臂转动机构的设备，受力后向下倾斜，为补偿受力引起的偏差变化，在安装时应控制悬臂轴水平度的偏差方向（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":22},"水平",{"key":24,"text":343,"correct":22},"上扬",{"key":27,"text":345,"correct":29},"向上倾斜",{"key":31,"text":347,"correct":22},"向后倾斜",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":24,"analysis":33},1111918,"设备基础的质量因素中，影响安装精度的主要是( )。",[352,354,356,358],{"key":20,"text":353,"correct":22},"温度和湿度",{"key":24,"text":355,"correct":29},"沉降和强度",{"key":27,"text":357,"correct":22},"表面积和平整度",{"key":31,"text":359,"correct":22},"浇注方式和时间",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":20,"analysis":33},1111919,"在室温条件下，工作温度较高的干燥机与传动电机联轴器找正时，两端面间隙在允许偏差内应选择( )。",[364,366,368,370],{"key":20,"text":365,"correct":29},"较大值",{"key":24,"text":367,"correct":22},"中间值",{"key":27,"text":369,"correct":22},"较小值",{"key":31,"text":371,"correct":22},"最小值",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":27,"analysis":33},1111920,"设备吊装就位的紧后工序是（ ）。",[376,378,379,381],{"key":20,"text":377,"correct":22},"设备清洗",{"key":24,"text":333,"correct":22},{"key":27,"text":380,"correct":29},"设备安装调整",{"key":31,"text":382,"correct":22},"垫铁安装",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},1111921,"关于断路器手车单元接地触头的描述中，正确的是（）",[387,389,391,393],{"key":20,"text":388,"correct":22},"手车推进时接地触头比主触头先接触，手车拉出时接地触头比主触头先断开",{"key":24,"text":390,"correct":29},"手车推进时接地触头比主触头先接触，手车拉出时接地触头比主触头后断开",{"key":27,"text":392,"correct":22},"手车推进时接地触头比主触头后接触，手车拉出时接地触头比主触头先断开",{"key":31,"text":394,"correct":22},"手车推进时接地触头比主触头后接触，手车拉出时接地触头比主触头后断开",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":24,"analysis":33},1111922,"下列选项中，不属于五防连锁的是（）",[399,401,403,405],{"key":20,"text":400,"correct":22},"防止误合断路器",{"key":24,"text":402,"correct":29},"防止带负荷合负荷开关",{"key":27,"text":404,"correct":22},"防止带电合接地开关",{"key":31,"text":406,"correct":22},"防止误入带电间隔",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":27,"analysis":33},1111923,"能用于线路换位及线路分段处，在发生事故时能承受断线张力和控制事故范围的电力杆塔类型是（）",[411,413,415,417],{"key":20,"text":412,"correct":22},"直线杆",{"key":24,"text":414,"correct":22},"转角杆",{"key":27,"text":416,"correct":29},"耐张杆",{"key":31,"text":418,"correct":22},"终端杆",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},1111924,"采用焊接连接的分段水泥杆，焊接后的整杆弯曲度不应超过电杆全长的（ ）。",[423,425,427,429],{"key":20,"text":424,"correct":22},"1\u002F1000",{"key":24,"text":426,"correct":29},"2\u002F1000",{"key":27,"text":428,"correct":22},"3\u002F1000",{"key":31,"text":430,"correct":22},"4\u002F1000",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":24,"analysis":33},1111925,"用于线路转角处，在正常情况下承受导线转角合力，事故断线情况下承受断线张力的电杆是（ ）。",[435,436,437,438],{"key":20,"text":416,"correct":22},{"key":24,"text":414,"correct":29},{"key":27,"text":418,"correct":22},{"key":31,"text":439,"correct":22},"分支杆",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},1111926,"下列不属于架空线路中金具的是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"U字形抱箍",{"key":24,"text":447,"correct":22},"挂板",{"key":27,"text":449,"correct":22},"心形环",{"key":31,"text":451,"correct":29},"瓷横担",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":31,"analysis":33},1111927,"对于1kV及以下的橡塑电缆，敷设前用2500V兆欧表测试（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"交流耐压试验",{"key":24,"text":459,"correct":22},"直流泄漏试验",{"key":27,"text":461,"correct":22},"直流耐压试验",{"key":31,"text":463,"correct":29},"绝缘电阻测试",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":27,"analysis":33},1111928,"下列选项中，油浸电力变压器的一般安装程序正确的是（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"基础检查验收→本体安装→传动装置配装→调整",{"key":24,"text":471,"correct":22},"断路器检查→操作机构检查→真空断路器就位→机械及电气性能试验",{"key":27,"text":473,"correct":29},"开箱检查→二次搬运→设备就位→吊芯检查→附件安装→滤油.注油→交接试验→验收",{"key":31,"text":475,"correct":22},"就位→检查及电气试验→穿转子→调整空气间隙→附属设备及管路安装",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},1111929,"电气设备交接试验中，高压试验结束后对直流试验设备及大电容的被测试设备多次放电的放电时间不少于（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":29},"1min",{"key":24,"text":483,"correct":22},"2min",{"key":27,"text":485,"correct":22},"3min",{"key":31,"text":487,"correct":22},"5min",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":27,"analysis":33},1111930,"架空电力线路安装程序中，立杆的紧后工序是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"横担安装",{"key":24,"text":495,"correct":22},"绝缘子安装",{"key":27,"text":497,"correct":29},"拉线安装",{"key":31,"text":499,"correct":22},"导线架设",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},1111931,"施工现场临时用电架空线路中耐张杆、转角杆采用（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":22},"针式绝缘子",{"key":24,"text":507,"correct":29},"蝶式绝缘子",{"key":27,"text":509,"correct":22},"悬式绝缘子",{"key":31,"text":511,"correct":22},"棒式绝缘子",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":27,"analysis":33},1111932,"防止电缆延燃的措施不包括（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":22},"控制电缆采用全防火处理或采用阻燃电缆",{"key":24,"text":519,"correct":22},"电缆进入电缆沟.电缆隧道要严密防火封堵",{"key":27,"text":521,"correct":29},"电缆沟.电缆隧道内每隔120m设一道防火墙",{"key":31,"text":523,"correct":22},"电力电缆与控制电缆之间设防火隔板",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1111933,"关于母线安装要点的说法错误的是（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":22},"母线弯曲有立弯.平弯及扭弯三种",{"key":24,"text":531,"correct":29},"矩形母线的弯曲应进行热弯，不得进行冷弯",{"key":27,"text":533,"correct":22},"对于母线连接处的钻孔，螺孔的直径不宜大于螺栓1mm",{"key":31,"text":535,"correct":22},"母线加工后，其截面积的减少值，对于铜母线不可超过原截面的3%",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":24,"analysis":33},1111934,"在进行6kV-10kV 的高电压试验时，操作人员与未设防护栏的带电设备最小安全距离是（）",[540,542,544,546],{"key":20,"text":541,"correct":22},"0.5m",{"key":24,"text":543,"correct":29},"0.7m",{"key":27,"text":545,"correct":22},"0.9m",{"key":31,"text":547,"correct":22},"1.5m",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":24,"analysis":33},1111935,"管道工程施工程序中，“管道安装”的紧后工序是（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":22},"管道系统防腐",{"key":24,"text":555,"correct":29},"管道系统检验",{"key":27,"text":557,"correct":22},"管道系统绝热",{"key":31,"text":559,"correct":22},"管道系统试验",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":20,"analysis":33},1111936,"大型储罐的管道与泵或其他有独立基础的设备连接，应在储罐（ ）合格后安装。",[564,566,568,570],{"key":20,"text":565,"correct":29},"充水试验",{"key":24,"text":567,"correct":22},"基础验收",{"key":27,"text":569,"correct":22},"焊接检验",{"key":31,"text":571,"correct":22},"外形尺寸检查",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":31,"analysis":33},1111937,"防腐蚀衬里管道安装施工中，做法错误的是（ ）。",[576,578,580,582],{"key":20,"text":577,"correct":22},"有衬里的管道组成件应保证一定的存放环境，避免阳光和热源的辐射",{"key":24,"text":579,"correct":22},"安装过程中不应碰撞敲打",{"key":27,"text":581,"correct":22},"安装时应采用软质或半硬质垫片",{"key":31,"text":583,"correct":29},"安装过程中必要时可施焊.加热",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":27,"analysis":33},1111938,"泄漏性试验实施的检查重点不包括（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":22},"阀门填料函",{"key":24,"text":591,"correct":22},"法兰或螺纹连接处",{"key":27,"text":593,"correct":29},"焊接接头处",{"key":31,"text":595,"correct":22},"放空阀",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":24,"analysis":33},1111939,"GC类工业管道分为GC1、GC2、GC3三个等级的依据不包括（ ）。",[600,602,604,606],{"key":20,"text":601,"correct":22},"输送的介质",{"key":24,"text":603,"correct":29},"管道材质",{"key":27,"text":605,"correct":22},"设计压力",{"key":31,"text":607,"correct":22},"设计温度",[609,612,615,618,621,624],{"id":15,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":15},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]