[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,19,50,2160,[13,34,46,58,68,80,92,100,112,123,135,147,159,171,183,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,426,437,446,458,470,482,490,502,514,526,536,548,560,572,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1112761,1,"单选题","安装在无特殊防水要求楼板内的套管，其顶部应高出装饰地面（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","齐平",false,{"key":24,"text":25,"correct":26},"B","20mm",true,{"key":28,"text":29,"correct":22},"C","50mm",{"key":31,"text":32,"correct":22},"D","30mm","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1112762,"沟槽式连接水平钢管，支、吊架与接头的净间距不宜小于（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"150mm",{"key":24,"text":41,"correct":22},"100mm",{"key":28,"text":43,"correct":22},"300mm",{"key":31,"text":45,"correct":22},"120mm",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1112763,"汽、水同向流动的热水供暖管道，说法正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"坡度应为3‰，不得小于2‰",{"key":24,"text":53,"correct":22},"坡度不大于22‰",{"key":28,"text":55,"correct":22},"坡度应为1%",{"key":31,"text":57,"correct":22},"以上都对",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1112764,"散热器支管的坡度，说法正确的是（ ）。",[62,63,65,66],{"key":20,"text":51,"correct":22},{"key":24,"text":64,"correct":22},"坡度不大于2‰",{"key":28,"text":55,"correct":26},{"key":31,"text":67,"correct":22},"坡度应为3‰",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":28,"analysis":33},1112765,"卫生器具施工程序中，卫生器具排水管道安装的紧后工序是（ ）。",[72,74,76,78],{"key":20,"text":73,"correct":22},"给水配件安装",{"key":24,"text":75,"correct":22},"排水管道安装",{"key":28,"text":77,"correct":26},"灌水试验、通水试验",{"key":31,"text":79,"correct":22},"卫生器具安装",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":20,"analysis":33},1112766,"室外排水管网按排水检查井分段试验。试验时间不少于（ ），逐段观察，管接口无渗漏为合格。",[84,86,88,90],{"key":20,"text":85,"correct":26},"30min",{"key":24,"text":87,"correct":22},"5mim",{"key":28,"text":89,"correct":22},"24h",{"key":31,"text":91,"correct":22},"1.0h",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":31,"analysis":33},1112767,"室内雨水管，灌水达到稳定水面后观察（ ），管道无渗漏为合格。",[96,97,98,99],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":22},{"key":28,"text":89,"correct":22},{"key":31,"text":91,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":20,"analysis":33},1112768,"立管管径≥110mm时，在楼板贯穿部位应设置阻火圈或长度（ ）的防火套管。",[104,106,108,110],{"key":20,"text":105,"correct":26},"≥500mm",{"key":24,"text":107,"correct":22},"≥300mm",{"key":28,"text":109,"correct":22},"≥200mm",{"key":31,"text":111,"correct":22},"≥50mm",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":24,"analysis":33},1112769,"通气管应高出屋面（ ），且必须大于最大积雪厚度。",[116,118,119,121],{"key":20,"text":117,"correct":22},"500mm",{"key":24,"text":43,"correct":26},{"key":28,"text":120,"correct":22},"200mm",{"key":31,"text":122,"correct":22},"1000mm",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":24,"analysis":33},1112770,"室内给水建筑管道工程的施工程序中，管道安装的紧后工序是（ ）。",[127,129,131,133],{"key":20,"text":128,"correct":22},"系统清洗",{"key":24,"text":130,"correct":26},"系统试验",{"key":28,"text":132,"correct":22},"防腐绝热",{"key":31,"text":134,"correct":22},"竣工验收",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":31,"analysis":33},1112771,"悬吊式雨水管的最小坡度为（ ）。",[139,141,143,145],{"key":20,"text":140,"correct":22},"10%",{"key":24,"text":142,"correct":22},"8%",{"key":28,"text":144,"correct":22},"6%",{"key":31,"text":146,"correct":26},"5%",{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":24,"analysis":33},1112772,"室内给水系统中，复合管道在系统试验压力下10min内压力降不大于（ ）。",[151,153,155,157],{"key":20,"text":152,"correct":22},"0.1MPA",{"key":24,"text":154,"correct":26},"0.02MPA",{"key":28,"text":156,"correct":22},"0.3MPA",{"key":31,"text":158,"correct":22},"0.05MPA",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":20,"analysis":33},1112774,"投标报价的基础和前提是（ ）。",[163,165,167,169],{"key":20,"text":164,"correct":26},"施工方案",{"key":24,"text":166,"correct":22},"进度计划",{"key":28,"text":168,"correct":22},"质量标准",{"key":31,"text":170,"correct":22},"安全措施",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":24,"analysis":33},1112775,"依法必须进行招标的项目不包括（ ）。",[175,177,179,181],{"key":20,"text":176,"correct":22},"大型基础设施、公用事业等关系社会公共利益、公众安全的项目",{"key":24,"text":178,"correct":26},"全部使用外资投资的项目",{"key":28,"text":180,"correct":22},"全部或者部分使用国有资金投资或者国家融资的项目",{"key":31,"text":182,"correct":22},"使用国际组织或者外国政府贷款、援助资金的项目",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":185,"answer":20,"analysis":33},1112776,[186,187,188,189],{"key":20,"text":164,"correct":26},{"key":24,"text":166,"correct":22},{"key":28,"text":168,"correct":22},{"key":31,"text":170,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1112777,"招标文件发出之日起到投标人提交投标文件截止之日，最短不得少于（ ）日。",[194,196,198,200],{"key":20,"text":195,"correct":22},"10",{"key":24,"text":197,"correct":22},"15",{"key":28,"text":199,"correct":26},"20",{"key":31,"text":201,"correct":22},"30",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1112778,"使用预算资金（ ）万人民币以上，并且该资金占投资额（ ）以上的项目，必须进行招标项目。",[206,208,210,212],{"key":20,"text":207,"correct":22},"100，10%",{"key":24,"text":209,"correct":26},"200，10%",{"key":28,"text":211,"correct":22},"100，20%",{"key":31,"text":213,"correct":22},"200，20%",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1112779,"投标决策的后期阶段主要工作是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"对招标文件的实质性要求作出响应",{"key":24,"text":221,"correct":26},"研究在投标中采取的策略",{"key":28,"text":223,"correct":22},"审查施工方案",{"key":31,"text":225,"correct":22},"复核或计算工程量",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},1112780,"施工方案经济评价常用的方法是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"因素分析法",{"key":24,"text":233,"correct":22},"排列图法",{"key":28,"text":235,"correct":26},"综合评价法",{"key":31,"text":237,"correct":22},"经验分析法",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1112781,"施工方案的技术经济比较，不包括（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":26},"可追溯性比较",{"key":24,"text":245,"correct":22},"技术先进性比较",{"key":28,"text":247,"correct":22},"经济合理性比较",{"key":31,"text":249,"correct":22},"重要性比较",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":33},1112782,"充分发挥每个个体的优势，采用协调与优化的办法，扬长避短，使人力资源管理功能达到最优，这体现了人力资源管理的（ ）原则。",[254,256,258,260],{"key":20,"text":255,"correct":22},"系统优化",{"key":24,"text":257,"correct":22},"能级对应",{"key":28,"text":259,"correct":26},"互补增值",{"key":31,"text":261,"correct":22},"弹性冗余",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1112783,"对于施工机具的选择，按主要性能参数是为了（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"满足施工方案的需要",{"key":24,"text":269,"correct":26},"满足工程需要和保证质量要求",{"key":28,"text":271,"correct":22},"适合使用场所的环境条件",{"key":31,"text":273,"correct":22},"满足施工部署中的机械设备供应计划",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},1112784,"人力资源动态管理的基本原则不包括（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"动态管理以进度计划和合同为依据",{"key":24,"text":281,"correct":22},"动态管理应允许人力资源在企业内作充分的合理流动",{"key":28,"text":283,"correct":26},"动态管理应以动态平衡和人力资源计划为手段",{"key":31,"text":285,"correct":22},"动态管理应以达到人力资源优化组合，充分调动积极性为目的",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1112785,"编制一般的无损检测程序，并按检测工艺独立进行检测操作，评定检测结果，签发检测报告是（ ）无损检测人员的检测工作。",[290,292,294,296],{"key":20,"text":291,"correct":22},"Ⅰ级",{"key":24,"text":293,"correct":26},"Ⅱ级",{"key":28,"text":295,"correct":22},"Ⅲ级",{"key":31,"text":297,"correct":22},"实习检测员",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":28,"analysis":33},1112786,"施工现场材料管理的直接责任人是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"项目经理",{"key":24,"text":305,"correct":22},"材料员",{"key":28,"text":307,"correct":26},"项目部主管材料员",{"key":31,"text":309,"correct":22},"项目工长",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},1112787,"在施工中，项目部及时向材料部门提出调整供料月计划，作为动态供料的依据，是根据（ ）作出的。",[314,316,318,320],{"key":20,"text":315,"correct":22},"材料部门提出一次性计划",{"key":24,"text":317,"correct":22},"施工图纸、施工进度",{"key":28,"text":319,"correct":22},"施工平面图对现场设施的设计",{"key":31,"text":321,"correct":26},"工程变更及调整的施工预算",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},1112788,"在材料进场验收中，对要求复检的材料应有（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"送料凭证",{"key":24,"text":329,"correct":22},"进料计划",{"key":28,"text":331,"correct":26},"取样送检证明报告",{"key":31,"text":333,"correct":22},"质量保证书或产品合格证",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},1112789,"在材料存储与保管中，施工现场材料的放置要按（ ）实施，标识清楚，摆放有序。",[338,340,342,344],{"key":20,"text":339,"correct":22},"进库时间",{"key":24,"text":341,"correct":22},"材料保质期",{"key":28,"text":343,"correct":22},"领料方便",{"key":31,"text":345,"correct":26},"平面布置图",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},1112790,"在现场需要组装的大型机具，使用前要组织验收，以验证安装质量和（ ），合格后启用。",[350,352,354,356],{"key":20,"text":351,"correct":22},"操作灵便性",{"key":24,"text":353,"correct":22},"机械效率",{"key":28,"text":355,"correct":22},"使用维护性",{"key":31,"text":357,"correct":26},"安全性能",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},1112791,"特种作业要严格执行持证上岗制度并审查证件的有效性和（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"违章记录",{"key":24,"text":365,"correct":22},"编码信息",{"key":28,"text":367,"correct":26},"作业范围",{"key":31,"text":369,"correct":22},"颁发机构",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":28,"analysis":33},1112792,"施工机具使用实施“人机固定”原则，其“三定”制度不包括（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"定机",{"key":24,"text":377,"correct":22},"定人",{"key":28,"text":379,"correct":26},"定期培训",{"key":31,"text":381,"correct":22},"定岗位责任",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":31,"analysis":33},1112793,"施工现场管理人员配备中，施工员根据（ ）配备。",[386,388,390,392],{"key":20,"text":387,"correct":22},"项目规模",{"key":24,"text":389,"correct":22},"项目复杂程度",{"key":28,"text":391,"correct":22},"项目大小",{"key":31,"text":393,"correct":26},"项目专业情况",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},1112794,"施工技术资料应按规定的（ ）进行控制。",[398,400,402,404],{"key":20,"text":399,"correct":26},"工作程序",{"key":24,"text":401,"correct":22},"管理责任制",{"key":28,"text":403,"correct":22},"移交时间",{"key":31,"text":405,"correct":22},"质量要求",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},1112795,"机电工程有多个单位工程组成时，工程文件应按（ ）组卷。",[410,412,414,416],{"key":20,"text":411,"correct":26},"单位工程",{"key":24,"text":413,"correct":22},"分部工程",{"key":28,"text":415,"correct":22},"子分部工程",{"key":31,"text":417,"correct":22},"分项工程",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},1112796,"施工技术资料文件的保存以（ ）为基本单位进行保存。",[422,423,424,425],{"key":20,"text":411,"correct":22},{"key":24,"text":413,"correct":22},{"key":28,"text":415,"correct":22},{"key":31,"text":417,"correct":26},{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":24,"analysis":33},1112797,"机电工程项目施工技术交底由（ ）主持。",[430,431,433,435],{"key":20,"text":303,"correct":22},{"key":24,"text":432,"correct":26},"项目总工程师",{"key":28,"text":434,"correct":22},"公司总工程师",{"key":31,"text":436,"correct":22},"专业工程师",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":24,"analysis":33},1112798,"施工作业进度计划是根据（ ）施工进度计划的编制的。",[441,443,444,445],{"key":20,"text":442,"correct":22},"单项工程",{"key":24,"text":411,"correct":26},{"key":28,"text":413,"correct":22},{"key":31,"text":417,"correct":22},{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":28,"analysis":33},1112799,"在确定各项工程的开竣工时间和相互搭接协调关系时，应考虑的因素不包括（ ）。",[450,452,454,456],{"key":20,"text":451,"correct":22},"保证重点、兼顾一般",{"key":24,"text":453,"correct":22},"满足连续均衡施工要求，提高生产率和经济效益",{"key":28,"text":455,"correct":26},"计划在执行过程中不得变动",{"key":31,"text":457,"correct":22},"全面考虑各种不利条件的限制和影响",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":31,"analysis":33},1112800,"关于机电工程项目施工进度偏差分析的说法，正确的是（ ）。",[462,464,466,468],{"key":20,"text":463,"correct":22},"工作的进度偏差大于该工作的自由时差，此偏差对总工序没有影响",{"key":24,"text":465,"correct":22},"工作的进度偏差大于该工作的自由时差，此偏差必将影响总工期",{"key":28,"text":467,"correct":22},"工作的进度偏差等于该工作的自由时差，此偏差对后续工作有影响",{"key":31,"text":469,"correct":26},"工作的进度偏差大于该工作的总时差，此偏差必将影响总工期",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":24,"analysis":33},1112801,"施工作业进度计划编制的根据是（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":22},"单项工程施工进度计划",{"key":24,"text":477,"correct":26},"单位工程施工进度计划",{"key":28,"text":479,"correct":22},"分部工程施工进度计划",{"key":31,"text":481,"correct":22},"分项工程施工进度计划",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},1112802,"作业进度计划以（ ）为单元编制。",[486,487,488,489],{"key":20,"text":442,"correct":22},{"key":24,"text":411,"correct":22},{"key":28,"text":413,"correct":22},{"key":31,"text":417,"correct":26},{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1112803,"下列因素中，会影响施工图纸提供不及时的因素是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"拖欠工程进度款",{"key":24,"text":497,"correct":26},"规范标准的修订",{"key":28,"text":499,"correct":22},"现场的管控能力",{"key":31,"text":501,"correct":22},"新施工技术交底",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":24,"analysis":33},1112804,"影响下道工序质量的质量控制点应由（ ）共同检查确认并签证。",[506,508,510,512],{"key":20,"text":507,"correct":22},"业主和施工双方质检人员",{"key":24,"text":509,"correct":26},"施工和监理双方质检人员",{"key":28,"text":511,"correct":22},"业主和监理双方质检人员",{"key":31,"text":513,"correct":22},"施工和政府双方质检人员",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":28,"analysis":33},1112805,"下列检验不属于“三检制”的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"自检",{"key":24,"text":521,"correct":22},"互检",{"key":28,"text":523,"correct":26},"送检",{"key":31,"text":525,"correct":22},"专检",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":28,"analysis":33},1112806,"影响下道工序质量的质量控制点应由（ ）检查确认并签证。",[530,532,533,534],{"key":20,"text":531,"correct":22},"由施工、监理和业主三方质检人员",{"key":24,"text":507,"correct":22},{"key":28,"text":509,"correct":26},{"key":31,"text":535,"correct":22},"由施工方质检人员自行",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":31,"analysis":33},1112807,"质量事故的特点不包括（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":22},"复杂性",{"key":24,"text":543,"correct":22},"严重性",{"key":28,"text":545,"correct":22},"可变性",{"key":31,"text":547,"correct":26},"偶然性",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":28,"analysis":33},1112808,"在工程实施的过程中要对合同的履行情况进行合同实施监督、跟踪与调整，监督的内容不包括（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":22},"监督落实合同实施计划",{"key":24,"text":555,"correct":22},"协调项目各相关方之间的工作关系",{"key":28,"text":557,"correct":26},"签订分包合同后，加强合同变更管理",{"key":31,"text":559,"correct":22},"对具体实施工作进行指导",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":31,"analysis":33},1112809,"合同分析的内容中，关于合同价格的内容还应包括计价方法和（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":22},"工程范围",{"key":24,"text":567,"correct":22},"工期要求",{"key":28,"text":569,"correct":22},"合同变更",{"key":31,"text":571,"correct":26},"价格补偿条件",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":20,"analysis":33},1112810,"\"项目索赔中的不可抗力因素，不包括（ ）。 \"",[576,578,580,582],{"key":20,"text":577,"correct":26},"现场火灾",{"key":24,"text":579,"correct":22},"洪水",{"key":28,"text":581,"correct":22},"地震",{"key":31,"text":583,"correct":22},"台风",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":28,"analysis":33},1112812,"安全检查的重点是违章作业和（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":22},"防护措施",{"key":24,"text":591,"correct":22},"交叉作业",{"key":28,"text":593,"correct":26},"违章指挥",{"key":31,"text":595,"correct":22},"规章制度",[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]