[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,17,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,174,186,198,210,222,234,246,258,270,282,294,306,318,330,342,354,366,378,390,402,414,426,438,450,460,472,484,496,508,520,532,541,553,565,577,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1112657,1,"单选题","风与空调系统满负荷条件下的联合试运转及调试的规定，正确的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","系统总风量调试结果与设计风量的允许偏差应为5%",false,{"key":24,"text":25,"correct":22},"B","系统总风量调试结果与设计风量的允许偏差应为10%",{"key":27,"text":28,"correct":22},"C","系统总风量调试结果与设计风量的允许偏差应为0～10%",{"key":30,"text":31,"correct":32},"D","系统总风量调试结果与设计风量的允许偏差应为一5%～+1O%",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1112658,"洁净度等级N6至N9级，且工作压力小于等于1500Pa的系统风管制作要求是按（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"微压系统",{"key":24,"text":41,"correct":22},"低压系统",{"key":27,"text":43,"correct":32},"中压系统",{"key":30,"text":45,"correct":22},"高压系统",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1112659,"净化空调系统的检测和调整应在系统正常运行（ ），达到稳定后进行。",[50,52,54,56],{"key":20,"text":51,"correct":32},"24h及以上",{"key":24,"text":53,"correct":22},"16h及以上",{"key":27,"text":55,"correct":22},"12h及以上",{"key":30,"text":57,"correct":22},"8h及以上",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1112660,"下列不属于通风与空调工程子分部的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"送、排风系统",{"key":24,"text":65,"correct":22},"防排烟系统",{"key":27,"text":67,"correct":22},"空调系统",{"key":30,"text":69,"correct":32},"风管系统",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1112661,"风机安装应符合的规定不包括（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"安装完毕应检查电机接线正确",{"key":24,"text":77,"correct":22},"检查叶片转动灵活，无异常响动",{"key":27,"text":79,"correct":22},"风机落地安装应固定在隔振底座上",{"key":30,"text":81,"correct":22},"风机与风管连接采用柔性短管",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},1112662,"通风空调设备中的水泵单机试运转应符合的规定不包括（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"水泵叶轮旋转方向正确",{"key":24,"text":89,"correct":22},"紧固连接部位无松动",{"key":27,"text":91,"correct":22},"滑动轴承外壳最高温度不得超过70℃",{"key":30,"text":93,"correct":32},"滚动轴承不得超过80℃",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1112663,"变风量空调系统联合试运转及调试中，空气处理机组在设计机外余压条件下，系统总风量不大于（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"10%",{"key":24,"text":101,"correct":32},"-5%～+10%",{"key":27,"text":103,"correct":22},"0～+10%",{"key":30,"text":105,"correct":22},"0～+15%",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1112664,"通风空调工程系统调试的主要内容不包括（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"风量测定与调整",{"key":24,"text":113,"correct":22},"单机试运转",{"key":27,"text":115,"correct":32},"综合效能测定与调整",{"key":30,"text":117,"correct":22},"系统无生产负荷联合试运转及调试",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1112665,"风管系统内管内负压为（ ）属于中压系统。",[122,124,126,128],{"key":20,"text":123,"correct":22},"-500Pa≤P＜-125Pa",{"key":24,"text":125,"correct":32},"-1000Pa≤P＜-500Pa",{"key":27,"text":127,"correct":22},"-2000Pa≤P＜-1000Pa",{"key":30,"text":129,"correct":22},"-1000Pa＜P≤-500Pa",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1112666,"风管系统安装的紧后工序是：（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"通风空调设备安装",{"key":24,"text":137,"correct":22},"空调设备安装",{"key":27,"text":139,"correct":32},"空调水系统安装",{"key":30,"text":141,"correct":22},"管道防腐与绝热",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":30,"analysis":33},1112667,"智能化系统的调试工作由（ ）主持。",[146,148,150,152],{"key":20,"text":147,"correct":22},"总监理工程师",{"key":24,"text":149,"correct":22},"监理工程师",{"key":27,"text":151,"correct":22},"项目负责人",{"key":30,"text":153,"correct":32},"项目专业技术负责人",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1112668,"下列文件中，不属于智能化工程验收文件的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":32},"智能化设备产品质量合格检验记录",{"key":24,"text":161,"correct":22},"设备开箱检验记录",{"key":27,"text":163,"correct":22},"设计变更记录",{"key":30,"text":165,"correct":22},"系统检测记录",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1112669,"智能化工程验收应具备的条件不包括（ ）。",[170,171,172,173],{"key":20,"text":159,"correct":32},{"key":24,"text":161,"correct":22},{"key":27,"text":163,"correct":22},{"key":30,"text":165,"correct":22},{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":30,"analysis":33},1112670,"卫星接收天线的安装内容不包括（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"天线底座接地电阻应小于4Ω",{"key":24,"text":181,"correct":22},"所需收视频率应无微波干扰",{"key":27,"text":183,"correct":22},"卫星接收天线应在避雷针保护范围内",{"key":30,"text":185,"correct":32},"避雷装置的接地与接收设备的室内接地线共用",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},1112671,"消火栓系统施工程序中，箱体稳固的紧后工序是（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"支管安装",{"key":24,"text":193,"correct":32},"附件安装",{"key":27,"text":195,"correct":22},"管道试压",{"key":30,"text":197,"correct":22},"冲洗→系统调试",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":27,"analysis":33},1112672,"建设单位申请消防验收时应当提供的合格证明资料不包括（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"消防产品质量合格证明文件",{"key":24,"text":205,"correct":22},"具有防火性能要求的建筑材料出厂合格证",{"key":27,"text":207,"correct":32},"施工单位质量自检合格证",{"key":30,"text":209,"correct":22},"消防设施检测合格证明文件",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":20,"analysis":33},1112673,"火灾自动报警及联动控制系统施工程序中，线缆敷设的紧后程序是（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":32},"绝缘测试",{"key":24,"text":217,"correct":22},"线槽敷设",{"key":27,"text":219,"correct":22},"设备安装",{"key":30,"text":221,"correct":22},"导管敷设",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},1112674,"自动喷水灭火系统的施工程序中，干管安装完毕之后，应做的工作是（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":32},"报警阀安装",{"key":24,"text":229,"correct":22},"立管安装",{"key":27,"text":231,"correct":22},"喷洒分层干、支管安装",{"key":30,"text":233,"correct":22},"喷洒头安装",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":27,"analysis":33},1112675,"固定消防炮灭火系统施工完毕后，应做（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"强度试验",{"key":24,"text":241,"correct":22},"严密性试验",{"key":27,"text":243,"correct":32},"喷射功能调试",{"key":30,"text":245,"correct":22},"联动试验",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":27,"analysis":33},1112676,"消防工程验收后，经工程移交程序，以明确工程的（ ）责任。",[250,252,254,256],{"key":20,"text":251,"correct":22},"检修保养",{"key":24,"text":253,"correct":22},"检查整改",{"key":27,"text":255,"correct":32},"维护保管",{"key":30,"text":257,"correct":22},"施工保修",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":30,"analysis":33},1112677,"消防工程应严格按照经（ ）审核批准的设计图纸进行施工。",[262,264,266,268],{"key":20,"text":263,"correct":22},"建设单位",{"key":24,"text":265,"correct":22},"设计单位",{"key":27,"text":267,"correct":22},"监理公司",{"key":30,"text":269,"correct":32},"消防部门",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":20,"analysis":33},1112678,"水灭火系统包括消火栓灭火系统和（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":32},"自动喷淋灭火系统",{"key":24,"text":277,"correct":22},"应急疏散系统",{"key":27,"text":279,"correct":22},"消防广播系统",{"key":30,"text":281,"correct":22},"通风系统",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},1112679,"消防水泵及稳压泵的施工程序中，泵体安装的紧后工序是（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"泵体稳固",{"key":24,"text":289,"correct":32},"吸水管路安装",{"key":27,"text":291,"correct":22},"压水管路安装",{"key":30,"text":293,"correct":22},"单机调试",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":20,"analysis":33},1112680,"自动喷水灭火系统施工程序是：施工准备→（ ）→管道试压→管道冲洗→减压装置安装→报警阀配件及其他组件安装→喷洒头安装→系统通水调试等。",[298,300,302,304],{"key":20,"text":299,"correct":32},"干管安装→报警阀安装→立管安装→喷洒分层干、支管安装→喷洒头支管安装",{"key":24,"text":301,"correct":22},"干管安装→立管安装→报警阀安装→喷洒分层干、支管安装",{"key":27,"text":303,"correct":22},"干管安装→管道冲洗→喷洒分层干、支管安装",{"key":30,"text":305,"correct":22},"干管安装→立管安装→喷洒头支管安装",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":24,"analysis":33},1112682,"消防验收的结论评定程序要形成（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"消防设施技术测试报告",{"key":24,"text":313,"correct":32},"消防验收意见书",{"key":27,"text":315,"correct":22},"消防工程整改通知单",{"key":30,"text":317,"correct":22},"工程移交清单",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":27,"analysis":33},1112683,"粗装修消防验收属于消防设施的（ ）验收。",[322,324,326,328],{"key":20,"text":323,"correct":22},"完整性",{"key":24,"text":325,"correct":22},"可用性",{"key":27,"text":327,"correct":32},"功能性",{"key":30,"text":329,"correct":22},"操作性",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},1112684,"建筑物准备投入使用前的消防验收称（ ）验收。",[334,336,338,340],{"key":20,"text":335,"correct":22},"粗装修",{"key":24,"text":337,"correct":32},"精装修",{"key":27,"text":339,"correct":22},"隐蔽工程",{"key":30,"text":341,"correct":22},"现场检查",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":30,"analysis":33},1112685,"消防验收顺序通常为验收受理、现场检查、现场验收、结论评定和（ ）等阶段。",[346,348,350,352],{"key":20,"text":347,"correct":22},"发出通知",{"key":24,"text":349,"correct":22},"现场整改",{"key":27,"text":351,"correct":22},"资料移交",{"key":30,"text":353,"correct":32},"工程移交",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":20,"analysis":33},1112686,"干粉灭火装置的联动控制组件应进行（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":32},"模拟启动试验",{"key":24,"text":361,"correct":22},"模拟停止试验",{"key":27,"text":363,"correct":22},"模拟喷气试验",{"key":30,"text":365,"correct":22},"模拟切换操作试验",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":27,"analysis":33},1112688,"不需要向公安机关消防机构申请消防验收的工程有（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"国家机关办公楼",{"key":24,"text":373,"correct":22},"邮政楼",{"key":27,"text":375,"correct":32},"单体建筑面积小于40000㎡的公共建筑",{"key":30,"text":377,"correct":22},"建筑总面积大于1.5万㎡的民用机场航站楼",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},1112689,"下列分项工程中，不属于水喷雾灭火系统工程的是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"雨淋报警阀安装",{"key":24,"text":385,"correct":32},"储水瓶组的安装",{"key":27,"text":387,"correct":22},"水雾喷头安装",{"key":30,"text":389,"correct":22},"消防水泵的安装",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":30,"analysis":33},1112690,"下列关于消防工程施工要求的描述，错误的是（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"雨淋报警阀组的安装应在供水管网试压、冲洗合格后进行",{"key":24,"text":397,"correct":22},"自动喷水系统的喷头安装须在系统试压、冲洗合格后进行",{"key":27,"text":399,"correct":22},"消火栓系统的减压阀须在试压、冲洗合格后安装",{"key":30,"text":401,"correct":32},"水喷雾系统水雾喷头可以在系统试压冲洗前安装",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":27,"analysis":33},1112691,"下列消火栓系统的调试内容，不包括的是（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"报警阀及附件阀门调试",{"key":24,"text":409,"correct":22},"水源的调试",{"key":27,"text":411,"correct":32},"消防水泵的振动及噪声",{"key":30,"text":413,"correct":22},"消火栓调试",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},1112692,"下列设备安装时，不可以采用橡胶减振装置的是（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":22},"冷水机组",{"key":24,"text":421,"correct":32},"排风兼排烟的风机",{"key":27,"text":423,"correct":22},"空调机组",{"key":30,"text":425,"correct":22},"屋面冷却塔",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":24,"analysis":33},1112693,"钢板制作的消防水箱进出水管道宜采用的连接方式是（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":22},"焊接连接",{"key":24,"text":433,"correct":32},"法兰连接",{"key":27,"text":435,"correct":22},"螺纹连接",{"key":30,"text":437,"correct":22},"电热熔接",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":30,"analysis":33},1112694,"排烟防火阀的安装方向应正确，阀门应（ ）方向关闭。",[442,444,446,448],{"key":20,"text":443,"correct":22},"垂直气流",{"key":24,"text":445,"correct":22},"逆气流",{"key":27,"text":447,"correct":22},"平等气流",{"key":30,"text":449,"correct":32},"顺气流",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},1112695,"消防工程的验收应由（ ）组织向国家相关主管机构申报。",[454,455,457,459],{"key":20,"text":263,"correct":32},{"key":24,"text":456,"correct":22},"监理单位",{"key":27,"text":458,"correct":22},"施工单位",{"key":30,"text":265,"correct":22},{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":24,"analysis":33},1112696,"消防验收程序中的现场检查主要是核查工程实体是否符合经（ ）的消防设计。",[464,466,468,470],{"key":20,"text":465,"correct":22},"深化修改",{"key":24,"text":467,"correct":32},"审核批准",{"key":27,"text":469,"correct":22},"业主同意",{"key":30,"text":471,"correct":22},"图纸交底",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},1112697,"储存锌粉、碳化钙、低亚硫酸钠等遇水燃烧物品的仓库，不得设置（ ）灭火系统。",[476,478,480,482],{"key":20,"text":477,"correct":32},"室内外消防给水",{"key":24,"text":479,"correct":22},"防烟排烟系统",{"key":27,"text":481,"correct":22},"软质材料",{"key":30,"text":483,"correct":22},"火灾自动报警",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":30,"analysis":33},1112698,"石油天然气油罐区的灭火系统宜设置（ ）灭火系统。",[488,490,492,494],{"key":20,"text":489,"correct":22},"固定水炮",{"key":24,"text":491,"correct":22},"消火栓给水",{"key":27,"text":493,"correct":22},"自动喷洒",{"key":30,"text":495,"correct":32},"低倍数泡沫",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":24,"analysis":33},1112699,"防排烟风管的允许漏风量，应按（ ）系统风管确定。",[500,502,504,506],{"key":20,"text":501,"correct":22},"微压",{"key":24,"text":503,"correct":32},"中压",{"key":27,"text":505,"correct":22},"低压",{"key":30,"text":507,"correct":22},"高压",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":20,"analysis":33},1112700,"防火分区隔墙两侧的排烟防火阀，距墙表面应不大于（ ）。",[512,514,516,518],{"key":20,"text":513,"correct":32},"200mm",{"key":24,"text":515,"correct":22},"250mm",{"key":27,"text":517,"correct":22},"150mm",{"key":30,"text":519,"correct":22},"300mm",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":27,"analysis":33},1112701,"发生器、混合储存装置属于（ ）的组成。",[524,526,528,530],{"key":20,"text":525,"correct":22},"干粉灭火系统",{"key":24,"text":527,"correct":22},"气体灭火系统",{"key":27,"text":529,"correct":32},"泡沫灭火系统",{"key":30,"text":531,"correct":22},"火灾自动报警系统",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":20,"analysis":33},1112703,"建设工程消防验收由（ ）组织实施",[536,538,539,540],{"key":20,"text":537,"correct":32},"由住房和城乡建设主管部门",{"key":24,"text":456,"correct":22},{"key":27,"text":263,"correct":22},{"key":30,"text":458,"correct":22},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":20,"analysis":33},1112704,"电梯验收资料不包括（ ）。",[545,547,549,551],{"key":20,"text":546,"correct":32},"电梯试验合格证书",{"key":24,"text":548,"correct":22},"土建交接检验记录",{"key":27,"text":550,"correct":22},"设备进场验收记录",{"key":30,"text":552,"correct":22},"分项工程验收记录",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":27,"analysis":33},1112705,"自动扶梯的梯级或自动人行道的踏板或胶带上空，垂直净高度严禁（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"小于1.2m",{"key":24,"text":560,"correct":22},"小于1.5m",{"key":27,"text":562,"correct":32},"小于2.3m",{"key":30,"text":564,"correct":22},"小于2.5m",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":27,"analysis":33},1112706,"电力驱动的曳引式或强制式电梯施工程序中，轨道安装完毕之后，应做的工作是（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"曳引机安装",{"key":24,"text":572,"correct":22},"机房设备安装",{"key":27,"text":574,"correct":32},"轿厢组装",{"key":30,"text":576,"correct":22},"缓冲器安装",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":24,"analysis":33},1112707,"当相邻两层电梯门地坎间的距离大于（ ）时，其间必须设置井道安全门，井道安全门严禁向井道内开启，且必须装有安全门处于关闭时电梯才能运行的电气安全装置",[581,583,585,587],{"key":20,"text":582,"correct":22},"2m",{"key":24,"text":584,"correct":32},"11m",{"key":27,"text":586,"correct":22},"6m",{"key":30,"text":588,"correct":22},"8m",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":30,"analysis":33},1112708,"电梯井道内应设置永久性电气照明，井道照明电压宜采用（ ）安全电压。",[593,595,597,599],{"key":20,"text":594,"correct":22},"6V",{"key":24,"text":596,"correct":22},"12V",{"key":27,"text":598,"correct":22},"24V",{"key":30,"text":600,"correct":32},"36V",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":30,"analysis":33},1112709,"电梯电缆导体对地之间的绝缘电阻必须大于（ ）。",[605,607,609,611],{"key":20,"text":606,"correct":22},"100Ω／V",{"key":24,"text":608,"correct":22},"200Ω／V",{"key":27,"text":610,"correct":22},"500Ω／V",{"key":30,"text":612,"correct":32},"1000Ω／V",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]