[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,16,50,2160,[13,34,45,57,69,81,93,105,117,129,141,153,165,177,189,201,213,225,237,249,261,273,285,296,308,320,332,344,356,365,377,389,401,413,425,437,445,456,468,480,492,504,516,528,540,552,564,576,587,596],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1112605,1,"单选题","母线槽安装前进行绝缘测试，每节母线槽的绝缘电阻不应小于（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","0.5MΩ",false,{"key":24,"text":25,"correct":22},"B","2MΩ",{"key":27,"text":28,"correct":22},"C","10MΩ",{"key":30,"text":31,"correct":32},"D","20MΩ",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1112606,"三相五线供电中，保护接地线的绝缘层颜色应为（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"黄绿双色",{"key":24,"text":41,"correct":22},"黑白双色",{"key":27,"text":43,"correct":22},"蓝白双色",{"key":30,"text":41,"correct":22},{"id":46,"libraryId":5,"type":15,"typeLabel":16,"stem":47,"options":48,"answer":27,"analysis":33},1112607,"电动机电流干燥法时，其电流大小宜控制在电机额定电流的（ ）。",[49,51,53,55],{"key":20,"text":50,"correct":22},"40%以内",{"key":24,"text":52,"correct":22},"50%以内",{"key":27,"text":54,"correct":32},"60%以内",{"key":30,"text":56,"correct":22},"70%以内",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":24,"analysis":33},1112608,"电动机、电加热器属于（ ）的组成部分。",[61,63,65,67],{"key":20,"text":62,"correct":22},"变配电工程",{"key":24,"text":64,"correct":32},"电气动力工程",{"key":27,"text":66,"correct":22},"电气照明工程",{"key":30,"text":68,"correct":22},"备用电源",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":24,"analysis":33},1112609,"建筑电气装置施工中，配电柜安装固定后的紧后工序是（ ）。",[73,75,77,79],{"key":20,"text":74,"correct":22},"开箱检查",{"key":24,"text":76,"correct":32},"母线连接",{"key":27,"text":78,"correct":22},"调整试验",{"key":30,"text":80,"correct":22},"送电运行",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":30,"analysis":33},1112610,"防雷接地装置施工程序正确的是（ ）。",[85,87,89,91],{"key":20,"text":86,"correct":22},"接地干线安装→接地体安装→引下线敷设→均压环安装",{"key":24,"text":88,"correct":22},"接地干线安装→引下线敷设→接闪带安装→均压环安装",{"key":27,"text":90,"correct":22},"接地干线安装→均压环安装→引下线敷设→接闪带安装",{"key":30,"text":92,"correct":32},"接地干线安装→引下线敷设→均压环安装→接闪带安装",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},1112611,"全长40m的金属梯架，与保护导体可靠连接或接地点至少（ ）。",[97,99,101,103],{"key":20,"text":98,"correct":22},"2处",{"key":24,"text":100,"correct":32},"3处",{"key":27,"text":102,"correct":22},"4处",{"key":30,"text":104,"correct":22},"5处",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":24,"analysis":33},1112612,"镀锌钢导管、可弯曲金属导管和金属柔性导管连接处的两端宜用（ ）固定保护联结导体。",[109,111,113,115],{"key":20,"text":110,"correct":22},"熔焊连接",{"key":24,"text":112,"correct":32},"专用接地卡",{"key":27,"text":114,"correct":22},"套管连接",{"key":30,"text":116,"correct":22},"螺纹连接",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":27,"analysis":33},1112613,"等电位联结线及端子板宜采用（ ）材料。",[121,123,125,127],{"key":20,"text":122,"correct":22},"钢质",{"key":24,"text":124,"correct":22},"铝质",{"key":27,"text":126,"correct":32},"铜质",{"key":30,"text":128,"correct":22},"镀锌",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":20,"analysis":33},1112615,"当利用建筑物外立面混凝土柱内的主钢筋作防雷引下线时，接地测试点通常不少于( )个。",[133,135,137,139],{"key":20,"text":134,"correct":32},"2",{"key":24,"text":136,"correct":22},"3",{"key":27,"text":138,"correct":22},"1",{"key":30,"text":140,"correct":22},"5",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":30,"analysis":33},1112617,"关于单相三孔插座安装接线的要求，正确的是（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"面对插座板，右孔与零线连接，左孔与相线连接，上孔与接地线连接",{"key":24,"text":148,"correct":22},"面对插座板，右孔与相线连接，左孔与接地线连接，上孔与零线连接",{"key":27,"text":150,"correct":22},"面对插座板，右孔与接地线连接，左孔与零线连接，上孔与相线连接",{"key":30,"text":152,"correct":32},"面对插座板，右孔与相线连接，左孔与零线连接，上孔与接地线连接",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},1112618,"关于配电柜的二次回路的配线要求，错误的是（ ）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"铜芯绝缘导线的额定电压不应低于450\u002F750V",{"key":24,"text":160,"correct":32},"电流回路铜芯绝缘导线截面不应小于1.5mm2",{"key":27,"text":162,"correct":22},"电压回路铜芯绝缘导线截面不应小于1.5mm2",{"key":30,"text":164,"correct":22},"测量回路铜芯绝缘导线截面不应小于1.5mm2",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":30,"analysis":33},1112619,"下列镀锌梯架的安装，错误的是（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"镀锌梯架的起始端和终点端均已可靠地接地",{"key":24,"text":172,"correct":22},"镀锌梯架之间的连接处跨接了保护联结导体",{"key":27,"text":174,"correct":22},"镀锌梯架连接板每端有2个防松垫圈固定螺栓",{"key":30,"text":176,"correct":32},"镀锌梯架连接板两端共2个防松螺帽固定螺栓",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},1112620,"关于金属导管与保护导体的连接检查中，正确的抽查是（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"按每个检验批的导管连接头总数抽查3%",{"key":24,"text":184,"correct":22},"按每个检验批的导管连接头总数抽查5%",{"key":27,"text":186,"correct":32},"按每个检验批的导管连接头总数抽查10%",{"key":30,"text":188,"correct":22},"按每个检验批的导管连接头总数抽查20%",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":30,"analysis":33},1112621,"关于导管内穿线和槽盒内敷线的技术要求，正确的是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"同一交流回路导线穿于不同金属导管内",{"key":24,"text":196,"correct":22},"不同交流回路的导线可以穿入同一导管",{"key":27,"text":198,"correct":22},"同一槽盒内可同时敷设绝缘导线和电缆",{"key":30,"text":200,"correct":32},"铜芯绝缘导线的接头不得设置在导管内",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},1112622,"关于电动机送电试运行的要求，错误的是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"电动机的空载试运行时间宜为2h",{"key":24,"text":208,"correct":32},"连续启动2次的间隔不应小于3min",{"key":27,"text":210,"correct":22},"电动机冷却至常温下进行再次启动",{"key":30,"text":212,"correct":22},"转向应与设备上运转指示箭头一致",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":30,"analysis":33},1112623,"下列检查项目中，不属于配电柜主控项目的是（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"配电柜金属框架与保护导体可靠连接",{"key":24,"text":220,"correct":22},"配电线路的线间和线对地绝缘电阻值",{"key":27,"text":222,"correct":22},"抽屉式配电柜推拉灵活，无卡阻现象",{"key":30,"text":224,"correct":32},",配电柜基础框架安装的水平允许偏差",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":30,"analysis":33},1112624,"下列灯具中，灯具的金属外壳需要接地的是（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"离地2.4m的Ⅲ类灯具",{"key":24,"text":232,"correct":22},"离地2.5m的Ⅲ类灯具",{"key":27,"text":234,"correct":22},"离地2.8m的Ⅱ类灯具",{"key":30,"text":236,"correct":32},"离地3.0m的I类灯具",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":30,"analysis":33},1112625,"100kg重的灯具固定及悬吊装置，做恒定均布载荷强度试验的重量是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"100kg",{"key":24,"text":244,"correct":22},"200kg",{"key":27,"text":246,"correct":22},"300kg",{"key":30,"text":248,"correct":32},"500kg",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":30,"analysis":33},1112626,"金属筒体上安装接闪杆，金属筒体作接闪杆的引下线时，其厚度应不小于（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"2.5mm",{"key":24,"text":256,"correct":22},"3mm",{"key":27,"text":258,"correct":22},"3.5mm",{"key":30,"text":260,"correct":32},"4mm",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":30,"analysis":33},1112627,"接闪带采用钢材时应用热镀锌的镀层厚度应不小于（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"35μm",{"key":24,"text":268,"correct":22},"45μm",{"key":27,"text":270,"correct":22},"55μm",{"key":30,"text":272,"correct":32},"65μm",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":27,"analysis":33},1112628,"下列人工接地体的施工，正确的是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"可埋设在腐蚀性的土壤处",{"key":24,"text":280,"correct":22},"接地体顶部距地面不小于0.5m",{"key":27,"text":282,"correct":32},"垂直接地体的长度为2.5m",{"key":30,"text":284,"correct":22},"接地体的水平间距应不小于3m",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},1112629,"三相五线供电中，保护接地线颜色为（ ）。",[289,291,293,294],{"key":20,"text":290,"correct":22},"红黄双色",{"key":24,"text":292,"correct":22},"黄蓝双色",{"key":27,"text":39,"correct":32},{"key":30,"text":295,"correct":22},"淡蓝色",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":27,"analysis":33},1112630,"通风与空调工程按《建筑工程施工质量验收统一标准》GB 50300—2013划分为送风系统、排风系统、防排烟系统、除尘系统、舒适性空调系统等（ ）个子分部工程。",[300,302,304,306],{"key":20,"text":301,"correct":22},"7",{"key":24,"text":303,"correct":22},"14",{"key":27,"text":305,"correct":32},"20",{"key":30,"text":307,"correct":22},"22",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},1112631,"风管系统安装中，边长（直径）大于或等于630mm的（ ）需设置单独支吊架。",[312,314,316,318],{"key":20,"text":313,"correct":32},"防火阀",{"key":24,"text":315,"correct":22},"四通",{"key":27,"text":317,"correct":22},"弯头",{"key":30,"text":319,"correct":22},"三通",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":27,"analysis":33},1112632,"某工程的空调系统设计的工作压力为1000Pa，其风管系统应按（ ）风管制作和安装的要求施工。",[324,326,328,330],{"key":20,"text":325,"correct":22},"常压",{"key":24,"text":327,"correct":22},"低压",{"key":27,"text":329,"correct":32},"中压",{"key":30,"text":331,"correct":22},"高压",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":30,"analysis":33},1112633,"洁净空调系统风管制作的技术要点不包括（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"N5级风管按高压系统的风管要求进行",{"key":24,"text":339,"correct":22},"应在相对较封闭和清洁的环境中进行",{"key":27,"text":341,"correct":22},"风管及部件制作完成后，应清洗洁净",{"key":30,"text":343,"correct":32},"风管不得有纵向接缝",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},1112634,"矩形风管的内斜线和内弧形弯头应设（ ），以减少风管内部阻力和噪声。",[348,350,352,354],{"key":20,"text":349,"correct":32},"导流片",{"key":24,"text":351,"correct":22},"隔板",{"key":27,"text":353,"correct":22},"消声片",{"key":30,"text":355,"correct":22},"夹板",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":30,"analysis":33},1112635,"洁净空调风管系统其中洁净度等级N1至N5的按（ ）系统的风管制作要求。",[360,362,363,364],{"key":20,"text":361,"correct":22},"无压",{"key":24,"text":327,"correct":22},{"key":27,"text":329,"correct":22},{"key":30,"text":331,"correct":32},{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":20,"analysis":33},1112636,"风管系统安装时，法兰垫料应采用不产尘和不易老化的（ ）材料。",[369,371,373,375],{"key":20,"text":370,"correct":32},"弹性",{"key":24,"text":372,"correct":22},"硬质",{"key":27,"text":374,"correct":22},"软质",{"key":30,"text":376,"correct":22},"干净",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":27,"analysis":33},1112637,"风管组对时，风管连接处采用密封材料应满足（ ）的技术条件。",[381,383,385,387],{"key":20,"text":382,"correct":22},"耐高温",{"key":24,"text":384,"correct":22},"耐潮湿",{"key":27,"text":386,"correct":32},"系统功能",{"key":30,"text":388,"correct":22},"抗疲劳",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},1112638,"洁净室及洁净区空气中悬浮粒子洁净度等级共划分为（ ）等级。",[393,395,397,399],{"key":20,"text":394,"correct":22},"6",{"key":24,"text":396,"correct":32},"9",{"key":27,"text":398,"correct":22},"10",{"key":30,"text":400,"correct":22},"12",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":30,"analysis":33},1112639,"洁净空调风管不得有（ ）接缝。",[405,407,409,411],{"key":20,"text":406,"correct":22},"咬口式",{"key":24,"text":408,"correct":22},"焊接",{"key":27,"text":410,"correct":22},"纵向",{"key":30,"text":412,"correct":32},"横向",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":27,"analysis":33},1112640,"净化空调系统的高效过滤器的安装必须在洁净室内装饰工程全部完成，经全面清扫、擦拭，并在空吹（ ）后进行。",[417,419,421,423],{"key":20,"text":418,"correct":22},"4～8h",{"key":24,"text":420,"correct":22},"8～12h",{"key":27,"text":422,"correct":32},"12～24h",{"key":30,"text":424,"correct":22},"24～48h",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":20,"analysis":33},1112641,"风管系统安装完毕。必须进行严密性检验，严密性检验应（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":32},"以主、干管为主",{"key":24,"text":432,"correct":22},"检验全部工程",{"key":27,"text":434,"correct":22},"按系统20%比例抽检",{"key":30,"text":436,"correct":22},"检验全部支管",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":27,"analysis":33},1112642,"高效过滤器安装前，洁净室必须内装修工程全部完成，经全面清扫、擦拭，空吹（ ）后进行。",[441,442,443,444],{"key":20,"text":418,"correct":22},{"key":24,"text":420,"correct":22},{"key":27,"text":422,"correct":32},{"key":30,"text":424,"correct":22},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":30,"analysis":33},1112643,"空调系统带冷（热）源的正常联合试运转，不应少于（ ）小时，当竣工季节与设计条件相差较大时，例如夏季可仅做带冷源的试运转，冬期可仅做带热源的试运转。",[449,451,453,454],{"key":20,"text":450,"correct":22},"24",{"key":24,"text":452,"correct":22},"16",{"key":27,"text":400,"correct":22},{"key":30,"text":455,"correct":32},"8",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},1112644,"洁净空调工程系统的调试应在（ ）下进行，其检测结果应全部符合设计要求。",[460,462,464,466],{"key":20,"text":461,"correct":22},"密封条件",{"key":24,"text":463,"correct":32},"空态或静态",{"key":27,"text":465,"correct":22},"洁净环境",{"key":30,"text":467,"correct":22},"一定温湿度条件",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":27,"analysis":33},1112645,"下列风管工作压力，属于中压风管系统的是（ ）。",[472,474,476,478],{"key":20,"text":473,"correct":22},"P≥-125Pa",{"key":24,"text":475,"correct":22},"1500Pa＜P≤2500Pa",{"key":27,"text":477,"correct":32},"500Pa＜P≤1500Pa",{"key":30,"text":479,"correct":22},"P≤125Pa",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":30,"analysis":33},1112646,"风管穿过需要封闭的防火防爆墙体时，应设置的预埋套管钢板厚度为（ ）。",[484,486,488,490],{"key":20,"text":485,"correct":22},"1.0mm",{"key":24,"text":487,"correct":22},"1.2mm",{"key":27,"text":489,"correct":22},"1.4mm",{"key":30,"text":491,"correct":32},"1.6mm",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":27,"analysis":33},1112647,"各变风量末端装置的最大风量调试结果与设计风流偏差不应大于（ ）",[496,498,500,502],{"key":20,"text":497,"correct":22},"5%",{"key":24,"text":499,"correct":22},"10%",{"key":27,"text":501,"correct":32},"0~15%",{"key":30,"text":503,"correct":22},"20%",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":27,"analysis":33},1112648,"通风与空调工程的施工单位通过系统（ ）后即可进入竣工验收。",[508,510,512,514],{"key":20,"text":509,"correct":22},"测试合格",{"key":24,"text":511,"correct":22},"设备单机试运转及调整",{"key":27,"text":513,"correct":32},"无生产负荷联合试运转及调试",{"key":30,"text":515,"correct":22},"综合效能测定及调整",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},1112649,"制冷机组的安装程序中，机组运输吊装的紧后工序是（ ）。",[520,522,524,526],{"key":20,"text":521,"correct":22},"机组就位安装",{"key":24,"text":523,"correct":32},"减振装置安装",{"key":27,"text":525,"correct":22},"机组配管",{"key":30,"text":527,"correct":22},"基础验收",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":20,"analysis":33},1112650,"通风系统调试的施工程序中，风量平衡调整的紧前工序是（ ）。",[532,534,536,538],{"key":20,"text":533,"correct":32},"风量测试",{"key":24,"text":535,"correct":22},"测试仪器准备",{"key":27,"text":537,"correct":22},"流量测试",{"key":30,"text":539,"correct":22},"风机设备检查",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":30,"analysis":33},1112651,"下列关于金属风管加固的描述，错误的是（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":22},"边长大于630mm的矩形风管，应采取加固措施",{"key":24,"text":547,"correct":22},"边长大于800mm的矩形保温风管，应采取加固措施",{"key":27,"text":549,"correct":22},"单边平面面积大于1.2m2的低压矩形风管，应采取加固措施",{"key":30,"text":551,"correct":32},"管段长度大于1250mm的中压矩形风管，应采取角钢加固措施",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":27,"analysis":33},1112652,"关于空调管道的施工技术要求中，错误的是（ ）。",[556,558,560,562],{"key":20,"text":557,"correct":22},"管道穿楼板和墙体处应设置钢制套管",{"key":24,"text":559,"correct":22},"管道的连接可采用螺纹连接、焊接、法兰连接或卡箍连接",{"key":27,"text":561,"correct":32},"空调冷冻水、制冷剂管道安装完毕后，应进行水压试验",{"key":30,"text":563,"correct":22},"镀锌钢管采用焊接时，焊缝及热影响区的表面应进行二次镀锌处理",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":24,"analysis":33},1112653,"制作风管所采用的非金属复合风管板材的覆面材料必须为（ ）。 A.耐火材料",[568,570,572,574],{"key":20,"text":569,"correct":22},"不燃材料",{"key":24,"text":571,"correct":32},"难燃材料",{"key":27,"text":573,"correct":22},"难燃",{"key":30,"text":575,"correct":22},"1级材料",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},1112654,"关于通风与空调系统调试，不包括的是（ ）。",[580,582,583,585],{"key":20,"text":581,"correct":22},"设备单机试运转及调试",{"key":24,"text":515,"correct":32},{"key":27,"text":584,"correct":22},"防排烟系统的测定和调整",{"key":30,"text":586,"correct":22},"系统非设计满负荷条件下的联合试转运",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":27,"analysis":33},1112655,"通风系统经平衡调整，各风口及吸风罩的总风量与设计风量的允许偏差不应大于（ ）。",[591,592,593,595],{"key":20,"text":497,"correct":22},{"key":24,"text":499,"correct":22},{"key":27,"text":594,"correct":32},"15%",{"key":30,"text":503,"correct":22},{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":30,"analysis":33},1112656,"高效过滤器安装前应进行外观检查，并按规范要求进行现场（ ）。",[600,602,604,606],{"key":20,"text":601,"correct":22},"全面清扫",{"key":24,"text":603,"correct":22},"表面擦拭",{"key":27,"text":605,"correct":22},"滤芯组装",{"key":30,"text":607,"correct":32},"扫描检漏",[609,612,615,618,621,624],{"id":15,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":15},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]