[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,14,50,2160,[13,34,46,58,70,82,94,106,117,129,141,153,165,177,189,201,213,225,237,249,261,273,283,295,307,319,331,343,355,367,379,391,403,414,426,438,450,461,473,485,496,508,520,531,543,555,567,579,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1112502,1,"单选题","风力发电设备安装前技术要求不包括（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","制定专项施工方案",false,{"key":24,"text":25,"correct":26},"B","制定应急预案",true,{"key":28,"text":29,"correct":22},"C","吊车机械要制定防倾倒措施",{"key":31,"text":32,"correct":22},"D","要有防止风机设备损伤的针对性措施","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1112504,"出口压力为22MPa的锅炉为(?)。",[38,40,42,44],{"key":20,"text":39,"correct":22},"高压锅炉",{"key":24,"text":41,"correct":26},"亚临界锅炉",{"key":28,"text":43,"correct":22},"超临界锅炉",{"key":31,"text":45,"correct":22},"超超临界锅炉",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1112505,"球罐散装法施工程序，正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"赤道带安装→下寒带安装→下温带安装→上温带安装→上寒带安装",{"key":24,"text":53,"correct":22},"赤道带安装→下温带安装→上温带安装→下寒带安装→上寒带安装",{"key":28,"text":55,"correct":26},"赤道带安装→下温带安装→下寒带安装→上温带安装→上寒带安装",{"key":31,"text":57,"correct":22},"赤道带安装→上温带安装→上寒带安装→下温带安装→下寒带安装",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1112506,"避免了高空作业，保证了安全，有利于提高质量和工效，在储罐施工中被广泛采用的储罐安装方法是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"正装法",{"key":24,"text":65,"correct":26},"倒装法",{"key":28,"text":67,"correct":22},"充气顶升法",{"key":31,"text":69,"correct":22},"水浮法",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1112507,"焊接H型钢的腹板拼接宽度不应小于300mm，长度不应小于（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"300mm",{"key":24,"text":77,"correct":22},"400mm",{"key":28,"text":79,"correct":22},"500mm",{"key":31,"text":81,"correct":26},"600mm",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1112508,"钢制储罐充水试验的水温不应低于（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"-5℃",{"key":24,"text":89,"correct":22},"0℃",{"key":28,"text":91,"correct":26},"5℃",{"key":31,"text":93,"correct":22},"10℃",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1112509,"低合金结构钢制作的钢结构，加热矫正后应（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"继续升温5℃左右",{"key":24,"text":101,"correct":22},"进行保温",{"key":28,"text":103,"correct":22},"用油冷却",{"key":31,"text":105,"correct":26},"自然冷却",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1112510,"《钢结构工程施工质量验收规范》规定，低合金结构钢在加热矫正后应（ ）。",[110,112,113,115],{"key":20,"text":111,"correct":22},"水冷却",{"key":24,"text":105,"correct":26},{"key":28,"text":114,"correct":22},"油冷却",{"key":31,"text":116,"correct":22},"风冷",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},1112511,"吊车梁和吊车桁架安装就位后不应有（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":26},"下挠",{"key":24,"text":124,"correct":22},"上挠",{"key":28,"text":126,"correct":22},"侧弯",{"key":31,"text":128,"correct":22},"扭曲",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":31,"analysis":33},1112512,"现场组焊的每台球形储罐应制作立焊、横焊、平焊加（ ）位置的产品焊接试件各一块。",[133,135,137,139],{"key":20,"text":134,"correct":22},"纵焊",{"key":24,"text":136,"correct":22},"埋弧焊",{"key":28,"text":138,"correct":22},"环焊",{"key":31,"text":140,"correct":26},"仰焊",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},1112513,"《钢结构工程施工质量验收规范》规定，低合金结构钢在环境温度低于（ ）时，不应进行冷校正和冷弯曲。",[145,147,149,151],{"key":20,"text":146,"correct":22},"18℃",{"key":24,"text":148,"correct":22},"-16℃",{"key":28,"text":150,"correct":22},"-14℃",{"key":31,"text":152,"correct":26},"-12℃",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":31,"analysis":33},1112514,"钢结构制作和安装单位应按规定分别进行高强度螺栓连接摩擦面的（ ）试验，其结果应符合设计要求。",[157,159,161,163],{"key":20,"text":158,"correct":22},"扭矩系数",{"key":24,"text":160,"correct":22},"紧固轴力",{"key":28,"text":162,"correct":22},"弯矩系数",{"key":31,"text":164,"correct":26},"抗滑移系数",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":31,"analysis":33},1112515,"钢结构矫正后，钢材表面不应有明显的凹面说损伤，划痕深度不得大于0.5mm，且不应大于该钢材厚度允许负偏差的（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"4\u002F5",{"key":24,"text":172,"correct":22},"3\u002F4",{"key":28,"text":174,"correct":22},"2\u002F3",{"key":31,"text":176,"correct":26},"1\u002F2",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},1112516,"球罐的焊接顺序不包括（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"先焊纵缝，后焊环缝",{"key":24,"text":184,"correct":26},"先焊长缝，后焊短缝",{"key":28,"text":186,"correct":22},"先焊坡口深度大的一侧",{"key":31,"text":188,"correct":22},"后焊坡口深度小的一侧",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":28,"analysis":33},1112517,"下列项目中，不属于钢制储罐罐体几何尺寸检查内容的是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"罐壁铅垂度偏差",{"key":24,"text":196,"correct":22},"底圈壁板内表面半径偏差",{"key":28,"text":198,"correct":26},"两级及赤道截面内直径偏差",{"key":31,"text":200,"correct":22},"罐底焊后局部凹凸变形",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},1112518,"板式塔的安装程序，正确的是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"吊装就位→内件安装→找平找正→灌浆抹面→防腐保温→检查封闭",{"key":24,"text":208,"correct":26},"吊装就位→找平找正→灌浆抹面→内件安装→检查封闭",{"key":28,"text":210,"correct":22},"吊装就位→找平找正→灌浆抹面→内件安装→检查封闭→防腐保温",{"key":31,"text":212,"correct":22},"内件安装→吊装就位→找平找正→灌浆抹面→防腐保温→检查封闭",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},1112519,"适用于400m3以上的球罐组装、目前国内应用最广技术最成熟的球罐组装方法是（ ）法。",[217,219,221,223],{"key":20,"text":218,"correct":22},"分带",{"key":24,"text":220,"correct":22},"半球",{"key":28,"text":222,"correct":22},"整体",{"key":31,"text":224,"correct":26},"散装",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},1112520,"球罐分带组装方法目前已较少采用，它的主要特点是（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"技术不成熟",{"key":24,"text":232,"correct":22},"电焊工操作技能要求高，作业环境差",{"key":28,"text":234,"correct":22},"只适用于400m3以下小型球罐",{"key":31,"text":236,"correct":26},"可用于公称容积不大于1500m3的球罐组装",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},1112521,"下列关于压力容器焊接试件要求的说法中，错误的是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":26},"分段到现场进行焊接的压力容器免做焊接试件",{"key":24,"text":244,"correct":22},"施焊压力容器的焊工，方可焊接相应的焊接试件",{"key":28,"text":246,"correct":22},"试件检测不合格，允许返修或避开缺陷部位截取试样",{"key":31,"text":248,"correct":22},"焊件试板应同炉、同工艺随容器一起进行热处理",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":28,"analysis":33},1112522,"气柜材料验收时，不属于应核实的文件或项目是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"质量证明书原件或复印件",{"key":24,"text":256,"correct":22},"材料的标志",{"key":28,"text":258,"correct":26},"化学成分复验报告",{"key":31,"text":260,"correct":22},"订货合同技术条件",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1112523,"关于压力容器产品焊接试板要求，下列说法中正确的是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"应制做纵焊缝产品焊接试板，制取试样，进行拉力、剪切和必要的冲击试验",{"key":24,"text":268,"correct":26},"现场组焊的球形储罐应制作立、横、平加仰三块产品焊接试板",{"key":28,"text":270,"correct":22},"焊接试件在容器热处理之前，采用跟容器热处理一样的工艺进行热处理",{"key":31,"text":272,"correct":22},"产品焊接试板经外观检查和射线（或超声）检测，如不合格，应返工处理",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},1112524,"自动化仪表试验用的气源应清洁干燥，露点温度比最低环境温度低（ ）以上。",[277,279,280,282],{"key":20,"text":278,"correct":22},"3℃",{"key":24,"text":91,"correct":22},{"key":28,"text":281,"correct":22},"7℃",{"key":31,"text":93,"correct":26},{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":31,"analysis":33},1112525,"仪表安装施工程序中，综合控制系统试验后的下一步工作是（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"仪表管道安装",{"key":24,"text":290,"correct":22},"仪表单体校验，调整安装",{"key":28,"text":292,"correct":22},"取源部件安装",{"key":31,"text":294,"correct":26},"回路试验、系统试验",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":24,"analysis":33},1112526,"可燃气体检测器和有毒气体检测器的安装位置应根据被测气体的（ ）确定。",[299,301,303,305],{"key":20,"text":300,"correct":22},"压力",{"key":24,"text":302,"correct":26},"密度",{"key":28,"text":304,"correct":22},"燃点和毒性",{"key":31,"text":306,"correct":22},"温度",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":28,"analysis":33},1112527,"分析取源部件的安装要求不包括（ ）。",[311,313,315,317],{"key":20,"text":312,"correct":22},"位置应选在压力稳定、能灵敏反映真实成分变化的地方",{"key":24,"text":314,"correct":22},"取样点的周围不应有层流、涡流",{"key":28,"text":316,"correct":26},"取样点周围不得有生产过程的化学反应",{"key":31,"text":318,"correct":22},"在水平管道上安装分析取源部件时，其安装方位的要求与安装压力取源部件的取压点要求相同",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":28,"analysis":33},1112528,"有关压力取源部件安装说法，不正确的是（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"同一管段上时，压力取源部件应安装在温度取源部件的上游侧",{"key":24,"text":326,"correct":22},"测量气体压力时，取压点在管道的上半部",{"key":28,"text":328,"correct":26},"测量液体压力时，取压点在管道的下半部",{"key":31,"text":330,"correct":22},"测量蒸汽压力时，取压点在管道的上半部",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":20,"analysis":33},1112529,"温度取源部件的安装位置应在（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":26},"介质温度变化灵敏的地方",{"key":24,"text":338,"correct":22},"阀门部件的附近",{"key":28,"text":340,"correct":22},"介质流束稳定处",{"key":31,"text":342,"correct":22},"介质温度稳定的地方",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":24,"analysis":33},1112530,"涡轮流量计和涡街流量计的信号线应使用（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"光纤",{"key":24,"text":350,"correct":26},"屏蔽线",{"key":28,"text":352,"correct":22},"普通线材",{"key":31,"text":354,"correct":22},"数据线",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":31,"analysis":33},1112531,"测温元件安装在易受被测物料强烈冲击的位置，以及当水平安装时，其插入深度大于1m应采取（ ）措施。",[359,361,363,365],{"key":20,"text":360,"correct":22},"防高温",{"key":24,"text":362,"correct":22},"防磨损",{"key":28,"text":364,"correct":22},"防振动",{"key":31,"text":366,"correct":26},"防弯曲",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":24,"analysis":33},1112532,"仪表工程具备交接验收的条件是开通后连续正常运行（ ）。",[371,373,375,377],{"key":20,"text":372,"correct":22},"72h",{"key":24,"text":374,"correct":26},"48h",{"key":28,"text":376,"correct":22},"36h",{"key":31,"text":378,"correct":22},"24h",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},1112533,"仪表调校应遵循的原则有（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":22},"先校验后取证",{"key":24,"text":386,"correct":26},"先单校后联校",{"key":28,"text":388,"correct":22},"先复杂回路后单回路",{"key":31,"text":390,"correct":22},"先网络后单点",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":24,"analysis":33},1112534,"自动化仪表试验的24V直流电源电压波动不应超过（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":22},"±2.5%",{"key":24,"text":398,"correct":26},"±5%",{"key":28,"text":400,"correct":22},"±7.5%",{"key":31,"text":402,"correct":22},"±10%",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},1112535,"仪表设备由温度低于-5℃的环境移入保温库时，应在库内放置（ ）后再开箱。",[407,409,411,413],{"key":20,"text":408,"correct":22},"12h",{"key":24,"text":410,"correct":22},"16h",{"key":28,"text":412,"correct":22},"20h",{"key":31,"text":378,"correct":26},{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},1112536,"在自动化仪表中，不属于现场仪表的是（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":22},"温度检测仪表",{"key":24,"text":421,"correct":22},"压力检测仪表",{"key":28,"text":423,"correct":22},"物位检测仪表",{"key":31,"text":425,"correct":26},"功率测量仪表",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":31,"analysis":33},1112537,"仪表中央控制室内回路试验主要是指控制回路试验和（ ）试验。",[430,432,434,436],{"key":20,"text":431,"correct":22},"反馈回路",{"key":24,"text":433,"correct":22},"放大回路",{"key":28,"text":435,"correct":22},"联锁回路",{"key":31,"text":437,"correct":26},"检测回路",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},1112538,"直接安装在管道上的仪表，应（ ）",[442,444,446,448],{"key":20,"text":443,"correct":26},"安装完毕后进行压力试验",{"key":24,"text":445,"correct":22},"在设备或管道系统进行压力试验前试验",{"key":28,"text":447,"correct":22},"在设备或管道系统进行压力试验后试验",{"key":31,"text":449,"correct":22},"无需进行任何试验",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},1112539,"涡轮流量计的信号线应使用（ ）。",[454,456,457,459],{"key":20,"text":455,"correct":22},"控制线",{"key":24,"text":350,"correct":26},{"key":28,"text":458,"correct":22},"视频线",{"key":31,"text":460,"correct":22},"双绞线",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},1112540,"温度取源部件与管道呈倾斜角度安装时，取源部件轴线应与管道轴线（ ），",[465,467,469,471],{"key":20,"text":466,"correct":22},"垂直",{"key":24,"text":468,"correct":26},"相交",{"key":28,"text":470,"correct":22},"重合",{"key":31,"text":472,"correct":22},"平行",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},1112541,"在水平管道上安装分析取源部件时，其安装方位的要求与安装（ ）要求相同。",[477,479,481,483],{"key":20,"text":478,"correct":26},"压力取源部件的取压点",{"key":24,"text":480,"correct":22},"温度取源部件的取温点",{"key":28,"text":482,"correct":22},"流量取源部件的层流点",{"key":31,"text":484,"correct":22},"液位取源部件的液位点",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":20,"analysis":33},1112542,"调校用的标准仪器、仪表应具备有效的计量检定合格证书，其基本误差的绝对值，不宜超过被校仪表基本误差绝对值的（ ）",[489,491,492,494],{"key":20,"text":490,"correct":26},"1\u002F3",{"key":24,"text":176,"correct":22},{"key":28,"text":493,"correct":22},"1\u002F4",{"key":31,"text":495,"correct":22},"1\u002F5",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":20,"analysis":33},1112543,"取源部件安装完毕后，应随同管道进行（ ）。",[500,502,504,506],{"key":20,"text":501,"correct":26},"压力试验",{"key":24,"text":503,"correct":22},"吹扫清洗",{"key":28,"text":505,"correct":22},"防腐处理",{"key":31,"text":507,"correct":22},"保温处理",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":20,"analysis":33},1112544,"仪表设备的保管要求有（ ）。",[512,514,516,518],{"key":20,"text":513,"correct":26},"控制仪表等精密设备，存放温度宜为5～40℃",{"key":24,"text":515,"correct":22},"相对湿度小于80%的环境内",{"key":28,"text":517,"correct":22},"仪表设备由温度低于﹣5℃的环境移入保温库时，应开箱放置24小时后才能使用",{"key":31,"text":519,"correct":22},"仪表设备及材料在安装前的保管期限一般为2年",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":28,"analysis":33},1112545,"在仪表回路试验后才能进行的工作是（ ）。",[524,525,527,529],{"key":20,"text":292,"correct":22},{"key":24,"text":526,"correct":22},"仪表单体校验",{"key":28,"text":528,"correct":26},"系统试验",{"key":31,"text":530,"correct":22},"仪表电缆敷设",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":24,"analysis":33},1112546,"仪表管道安装施工程序中，阀门压力试验的前一步工作是（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"管路预制、安装",{"key":24,"text":538,"correct":26},"管材及支架的除锈、一次防腐",{"key":28,"text":540,"correct":22},"管道的压力试验与吹扫",{"key":31,"text":542,"correct":22},"管材管件出库检验",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},1112547,"物位取源部件的安装位置，应选择物位变化灵敏，且（ ）的位置。",[547,549,551,553],{"key":20,"text":548,"correct":22},"使检验元件固定牢靠",{"key":24,"text":550,"correct":22},"介质流束呈现死角",{"key":28,"text":552,"correct":22},"震动较大的",{"key":31,"text":554,"correct":26},"检验元件不受物料冲击",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":31,"analysis":33},1112548,"温度取源部件安装在合金管道拐弯处时，错误的做法是（ ）。",[559,561,563,565],{"key":20,"text":560,"correct":22},"在防腐、衬里、吹扫和压力试验前安装",{"key":24,"text":562,"correct":22},"用机械方法开孔",{"key":28,"text":564,"correct":22},"逆着物料流向安装",{"key":31,"text":566,"correct":26},"取源部件轴线与管道轴线垂直相交",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":31,"analysis":33},1112549,"有关仪表施工现场要求，不正确的是（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":22},"应有和符合调校要求的交、直流电源及仪表气源",{"key":24,"text":574,"correct":22},"调校室内温度维持在10～35℃之间",{"key":28,"text":576,"correct":22},"空气相对湿度不大于85%",{"key":31,"text":578,"correct":26},"交流电源电压波动不应超过±5%",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},1112550,"自动化仪表工程施工中，调校用标准仪表其基本误差的绝对值，不宜超过被校仪表基本误差绝对值的（ ）。",[583,584,585,586],{"key":20,"text":176,"correct":22},{"key":24,"text":490,"correct":26},{"key":28,"text":493,"correct":22},{"key":31,"text":495,"correct":22},{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":31,"analysis":33},1112551,"自动化仪表设备安装应遵循的程序是（ ）。",[591,593,595,597],{"key":20,"text":592,"correct":22},"先里后外，先低后高，先轻后重",{"key":24,"text":594,"correct":22},"先外后里，先低后高，先重后轻",{"key":28,"text":596,"correct":22},"先外后里，先高后低，先轻后重",{"key":31,"text":598,"correct":26},"先里后外，先高后低，先重后轻",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":24,"analysis":33},1112552,"有关气体检测器的安装，不正确的是（ ）。",[603,605,607,609],{"key":20,"text":604,"correct":22},"安装位置应根据被测气体的密度确定",{"key":24,"text":606,"correct":26},"被测气体密度大于空气时，检测器应安装距地面位置250～350mm处",{"key":28,"text":608,"correct":22},"被测气体密度小于空气时，检测器应安装在泄漏域的上方",{"key":31,"text":610,"correct":22},"应避开有强磁场干扰的位置",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]