[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":603},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,13,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,222,234,245,257,269,281,293,305,313,325,337,349,361,373,385,397,409,421,433,445,457,469,481,493,501,513,525,537,549,558,570,580,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1112451,1,"单选题","管道试压后的工序有（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","管段预制",false,{"key":24,"text":25,"correct":22},"B","管道安装",{"key":27,"text":28,"correct":29},"C","防腐绝热",true,{"key":31,"text":32,"correct":22},"D","管口焊接","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1112452,"关于伴热管的安装，说法正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"伴热管应绕在主管上",{"key":24,"text":41,"correct":29},"当一根主管需多根伴热管伴热时，伴热管之间的相对位置应固定",{"key":27,"text":43,"correct":22},"可以将伴热管直接点焊在主管上",{"key":31,"text":45,"correct":22},"碳钢伴热管给不锈钢主管伴热时，为了保证伴热效果，应将伴热管紧紧贴合在主管上",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1112453,"关于伴热管与主管的安装要求，正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"伴热管与主管应水平安装",{"key":24,"text":53,"correct":29},"伴热管与主管应平行安装",{"key":27,"text":55,"correct":22},"伴热管与主管应交叉安装",{"key":31,"text":57,"correct":22},"伴热管与主管应垂直安装",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1112454,"设计文件没有规定时，高压钢管的弯曲半径宜大于管子外径的（ ）倍。",[62,64,66,68],{"key":20,"text":63,"correct":22},"3.5",{"key":24,"text":65,"correct":22},"4",{"key":27,"text":67,"correct":22},"4.5",{"key":31,"text":69,"correct":29},"5",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1112455,"大型储罐的管道与泵或其他有独立基础的设备连接，应在储罐（ ）合格后安装。",[74,76,78,80],{"key":20,"text":75,"correct":29},"充水试验",{"key":24,"text":77,"correct":22},"基础验收",{"key":27,"text":79,"correct":22},"焊接检验",{"key":31,"text":81,"correct":22},"外形尺寸检查",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1112456,"泄露性试验实施的检查重点不包括（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"阀门填料函",{"key":24,"text":89,"correct":22},"法兰或螺纹连接处",{"key":27,"text":91,"correct":29},"焊接接头处",{"key":31,"text":93,"correct":22},"放空阀",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1112457,"锅炉过热器管道的吹扫方法是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"水冲洗",{"key":24,"text":101,"correct":22},"人工清洗",{"key":27,"text":103,"correct":29},"蒸汽吹扫",{"key":31,"text":105,"correct":22},"压缩空气吹扫",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1112458,"低压缸组合安装中，低压内缸的通流间隙调整工作应在（ ）进行。",[110,112,114,116],{"key":20,"text":111,"correct":22},"低压内缸就位找正后",{"key":24,"text":113,"correct":22},"隔板调整前",{"key":27,"text":115,"correct":22},"低压转子吊入汽缸前",{"key":31,"text":117,"correct":29},"低压转子在汽缸内定位后",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1112459,"汽轮机轴系对轮中心找正不包括（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":29},"高压对轮中心",{"key":24,"text":125,"correct":22},"中低压对轮中心",{"key":27,"text":127,"correct":22},"低压对轮中心",{"key":31,"text":129,"correct":22},"低压转子—电转子对轮中心的找正",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1112460,"发电机转子穿装方法不包括（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"滑道式方法",{"key":24,"text":137,"correct":22},"接轴方法",{"key":27,"text":139,"correct":29},"液压顶升方法",{"key":31,"text":141,"correct":22},"用两台跑车的方法",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1112461,"电站汽轮机低压外上缸组合安装正确的程序是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"检查水平、垂直结合面间隙→符合要求后试组合→正式组合",{"key":24,"text":149,"correct":22},"试组合→正式组合→检查水平、垂直结合面间隙",{"key":27,"text":151,"correct":22},"检查水平结合面间隙→试组合→检查垂直结合面间隙→符合要求后正式组合",{"key":31,"text":153,"correct":29},"试组合→检查水平、垂直结合面间隙→符合要求后正式组合",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1112462,"组合场占用面积少，便于组件的吊装；但钢材耗用量大，安全状况较差的锅炉受热面组合形式是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"整体组立",{"key":24,"text":161,"correct":22},"分解组立",{"key":27,"text":163,"correct":29},"直立式组合",{"key":31,"text":165,"correct":22},"横卧式组合",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1112463,"发电机设备安装的一般程序中，发电机穿转子之后，要做的工作是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"转子水压试验",{"key":24,"text":173,"correct":29},"氢冷器安装",{"key":27,"text":175,"correct":22},"励磁机安装",{"key":31,"text":177,"correct":22},"气密试验",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},1112464,"锅炉钢架组件就位找正时，一般用水准仪检查大梁的（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"中心位置",{"key":24,"text":185,"correct":22},"垂直度",{"key":27,"text":187,"correct":29},"水平度",{"key":31,"text":189,"correct":22},"挠度",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1112465,"采用上猫爪搁置在轴承面上支承形式的汽轮机，在其高压外缸或中压外缸进行就位、找中时，用（ ）来就位、找中。",[194,196,198,200],{"key":20,"text":195,"correct":29},"下半汽缸",{"key":24,"text":197,"correct":22},"上半汽缸",{"key":27,"text":199,"correct":22},"下猫爪",{"key":31,"text":201,"correct":22},"上猫爪",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1112466,"汽轮机低压外下缸组合程序是在外下缸后段（电机侧）和前段（汽侧）先分别就位，试组合符合要求后，将前、后段分开一段距离，再次清理检查（ ）结合面确认无疑后，再进行正式组合。",[206,208,210,212],{"key":20,"text":207,"correct":22},"水平",{"key":24,"text":209,"correct":29},"垂直",{"key":27,"text":211,"correct":22},"纵向",{"key":31,"text":213,"correct":22},"横向",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1112467,"锅炉钢架安装找正时，一般用水准仪检查大梁的（ ）。",[218,219,220,221],{"key":20,"text":187,"correct":29},{"key":24,"text":185,"correct":22},{"key":27,"text":183,"correct":22},{"key":31,"text":189,"correct":22},{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":27,"analysis":33},1112468,"汽轮机第一次试启动的条件不包括（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"汽轮机安装完毕",{"key":24,"text":229,"correct":22},"辅机部分试运合格",{"key":27,"text":231,"correct":29},"调速保护系统启动位置调整好",{"key":31,"text":233,"correct":22},"按照制造厂的启动要求进行",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},1112469,"下列施工程序中，属于发电机的工序是（ ）。",[238,240,241,243],{"key":20,"text":239,"correct":22},"本体密封检验",{"key":24,"text":175,"correct":29},{"key":27,"text":242,"correct":22},"框架制作安装",{"key":31,"text":244,"correct":22},"操作机构检查",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":31,"analysis":33},1112470,"锅炉本体受热面组合安装的一般程序是：设备清点检查→（ ）→联箱找正划线→管子就位对口、焊接。",[249,251,253,255],{"key":20,"text":250,"correct":22},"压力试验",{"key":24,"text":252,"correct":22},"泄漏性试验",{"key":27,"text":254,"correct":22},"灌水试验",{"key":31,"text":256,"correct":29},"通球试验",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":27,"analysis":33},1112471,"下列关于汽轮机气缸扣盖安装技术要点的表述中，错误的是（ ）。",[261,263,265,267],{"key":20,"text":262,"correct":22},"扣盖全程工作应连续进行，不得中断",{"key":24,"text":264,"correct":22},"正式扣盖之前应将内部零部件全部装齐后进行试扣",{"key":27,"text":266,"correct":29},"试扣空缸要求在自由状态下0.10mm塞尺不入",{"key":31,"text":268,"correct":22},"气缸紧固一般采用冷紧",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":20,"analysis":33},1112472,"发电机设备安装的下述几个工序中，符合发电机安装一般程序的是（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":29},"定子就位→定子及转子水压试验→发电机穿转子→氢冷器安装",{"key":24,"text":276,"correct":22},"定子及转子水压试验→定子就位→发电机穿转子→氢冷器安装",{"key":27,"text":278,"correct":22},"定子就位→定子及转子水压试验→氢冷安装→发电机穿转子",{"key":31,"text":280,"correct":22},"定子就位→发电机穿转子→定子及转子水压试验→氢冷器安装",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},1112473,"热力发电厂中，汽轮机的作用是（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":22},"热能转变为电能",{"key":24,"text":288,"correct":29},"热能转变为机械能",{"key":27,"text":290,"correct":22},"机械能转变为电能",{"key":31,"text":292,"correct":22},"机械能转变为热能",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":27,"analysis":33},1112474,"凝汽器与低压缸排汽口之间的连接，采用具有（ ）的中间连接段。",[297,299,301,303],{"key":20,"text":298,"correct":22},"刚性",{"key":24,"text":300,"correct":22},"旋转性能",{"key":27,"text":302,"correct":29},"伸缩性能",{"key":31,"text":304,"correct":22},"弹性",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":31,"analysis":33},1112475,"低压外上缸组合安装正确的程序是（ ）。",[309,310,311,312],{"key":20,"text":147,"correct":22},{"key":24,"text":149,"correct":22},{"key":27,"text":151,"correct":22},{"key":31,"text":153,"correct":29},{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":24,"analysis":33},1112476,"整体到货的汽轮机高、中压缸，测量运输环节轴向和径向的定位尺寸，并以制造厂的装配记录校核，要在汽缸（ ）进行。",[317,319,321,323],{"key":20,"text":318,"correct":22},"进场后",{"key":24,"text":320,"correct":29},"就位前",{"key":27,"text":322,"correct":22},"就位后",{"key":31,"text":324,"correct":22},"运输至吊装位置前",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":27,"analysis":33},1112478,"锅炉受热面组合形式根据设备的（ ）及现场施工条件来决定。",[329,331,333,335],{"key":20,"text":330,"correct":22},"重量",{"key":24,"text":332,"correct":22},"体积",{"key":27,"text":334,"correct":29},"结构特征",{"key":31,"text":336,"correct":22},"高度",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":20,"analysis":33},1112479,"锅炉安装完毕后要进行烘炉，其目的是（ ）。",[341,343,345,347],{"key":20,"text":342,"correct":29},"在使用时不致损裂",{"key":24,"text":344,"correct":22},"避免受热面结垢而影响传热",{"key":27,"text":346,"correct":22},"清除锅内的铁锈、油脂和污垢",{"key":31,"text":348,"correct":22},"缩短使用时温升时间",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":20,"analysis":33},1112480,"下列设施中，不在蒸汽管路冲洗与吹洗范围的是（ ）。",[353,355,357,359],{"key":20,"text":354,"correct":29},"汽包",{"key":24,"text":356,"correct":22},"锅炉过热器、再热器",{"key":27,"text":358,"correct":22},"减温水管系统",{"key":31,"text":360,"correct":22},"过热蒸汽管道",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":20,"analysis":33},1112481,"下列有关锅炉试运行的说法中，不正确的是（ ）。",[365,367,369,371],{"key":20,"text":366,"correct":29},"锅炉试运行在煮炉前进行",{"key":24,"text":368,"correct":22},"锅炉试运行启动时升压应缓慢，尽量减小壁温差",{"key":27,"text":370,"correct":22},"检查人孔、焊口、法兰等部件，发现有泄漏时及时处理",{"key":31,"text":372,"correct":22},"观察各联箱锅筒钢架支架等的热膨胀及其位移是否正常",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":31,"analysis":33},1112482,"汽轮机本体主要由静止和转动两部分组成，其中属于静止部分的是（ ）。",[377,379,381,383],{"key":20,"text":378,"correct":22},"主轴",{"key":24,"text":380,"correct":22},"叶轮",{"key":27,"text":382,"correct":22},"止推盘",{"key":31,"text":384,"correct":29},"喷嘴组",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},1112483,"汽轮机低压外下缸组合时，汽缸找中心的基准目前多采用（ ）。",[389,391,393,395],{"key":20,"text":390,"correct":22},"激光法",{"key":24,"text":392,"correct":29},"拉钢丝法",{"key":27,"text":394,"correct":22},"假轴法",{"key":31,"text":396,"correct":22},"转子法",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},1112484,"汽轮机安装完毕后的第一次启动，负责的单位是（ ）。",[401,403,405,407],{"key":20,"text":402,"correct":29},"制造厂",{"key":24,"text":404,"correct":22},"生产单位",{"key":27,"text":406,"correct":22},"安装单位",{"key":31,"text":408,"correct":22},"调试单位",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":31,"analysis":33},1112485,"散装锅炉本体安装程序中，尾部受热面安装后的紧后工作是（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"汽包安装",{"key":24,"text":416,"correct":22},"锅炉本体受热面的安装",{"key":27,"text":418,"correct":22},"钢架及梯子平台安装",{"key":31,"text":420,"correct":29},"燃烧设备的安装",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":24,"analysis":33},1112486,"压力表与表管之间装设三通旋塞阀的目的是（ ）。",[425,427,429,431],{"key":20,"text":426,"correct":22},"提高测量精度",{"key":24,"text":428,"correct":29},"吹洗管路",{"key":27,"text":430,"correct":22},"减小水流噪声",{"key":31,"text":432,"correct":22},"缓冲水击对表的冲击",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":20,"analysis":33},1112487,"风力发电设备的安装程序中，机舱安装的紧后工序是（ ）。",[437,439,441,443],{"key":20,"text":438,"correct":29},"发电机安装",{"key":24,"text":440,"correct":22},"塔筒安装",{"key":27,"text":442,"correct":22},"叶轮安装",{"key":31,"text":444,"correct":22},"轮毂组合",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},1112488,"下列设备中，不属于光伏发电设备的是（ ）。",[449,451,453,455],{"key":20,"text":450,"correct":22},"汇流箱",{"key":24,"text":452,"correct":22},"逆变器",{"key":27,"text":454,"correct":29},"变频器",{"key":31,"text":456,"correct":22},"配电箱",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":31,"analysis":33},1112489,"汽轮机凝汽器内部管束进行穿管和连接的时间点是（ ）。",[461,463,465,467],{"key":20,"text":462,"correct":22},"低压加热器安装前",{"key":24,"text":464,"correct":22},"凝汽器壳体管板安装前",{"key":27,"text":466,"correct":22},"低压缸就位前",{"key":31,"text":468,"correct":29},"低压缸就位后",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":33},1112490,"汽轮机转子安装技术要点不包括（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":22},"转子安装可以分为：转子吊装、转子测量和转子、汽缸找中心",{"key":24,"text":476,"correct":29},"转子吊装前应进行吊具的200%的工作负荷试验",{"key":27,"text":478,"correct":22},"转子测量包括轴颈圆度测量",{"key":31,"text":480,"correct":22},"转子测量包括转子水平度测量",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":31,"analysis":33},1112491,"当低压内缸就位找正、（ ）完成后，低压转子吊入汽缸中并定位后，再进行通流间隙调整。",[485,487,489,491],{"key":20,"text":486,"correct":22},"调整水平、标高",{"key":24,"text":488,"correct":22},"试组合",{"key":27,"text":490,"correct":22},"检查垂直结合面",{"key":31,"text":492,"correct":29},"隔板调整",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":20,"analysis":33},1112492,"采用上猫爪搁置在轴承支承面上的支承形式的汽轮机，在高压外缸或中压外缸进行就位、找中时，用（ ）就位、找中。",[497,498,499,500],{"key":20,"text":195,"correct":29},{"key":24,"text":197,"correct":22},{"key":27,"text":199,"correct":22},{"key":31,"text":201,"correct":22},{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":27,"analysis":33},1112493,"发电机转子穿装前应进行单独（ ），消除泄露后再做其他试验。",[505,507,509,511],{"key":20,"text":506,"correct":22},"液压试验",{"key":24,"text":508,"correct":22},"气压试验",{"key":27,"text":510,"correct":29},"气密性试验",{"key":31,"text":512,"correct":22},"漏气量试验",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},1112494,"大型汽轮发电机组轴系对轮中心找正时，应以（ ）为基准。",[517,519,521,523],{"key":20,"text":518,"correct":29},"低压转子",{"key":24,"text":520,"correct":22},"中压转子",{"key":27,"text":522,"correct":22},"高压转子",{"key":31,"text":524,"correct":22},"电机转子",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},1112495,"高温高压锅炉一般采用的主要蒸发受热面是（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"管式水冷壁",{"key":24,"text":532,"correct":29},"膜式水冷壁",{"key":27,"text":534,"correct":22},"对流管束",{"key":31,"text":536,"correct":22},"过热器",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":24,"analysis":33},1112496,"整装锅炉安装的施工程序中，水压试验之后应做的工作是（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"报警及联锁试验",{"key":24,"text":544,"correct":29},"单机试运转",{"key":27,"text":546,"correct":22},"热态调试",{"key":31,"text":548,"correct":22},"系统试运行",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":20,"analysis":33},1112497,"整装锅炉的省煤器为整体组件出厂，安装前应进行（ ），无渗漏方为合格。",[553,555,556,557],{"key":20,"text":554,"correct":29},"水压试验",{"key":24,"text":508,"correct":22},{"key":27,"text":510,"correct":22},{"key":31,"text":512,"correct":22},{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":27,"analysis":33},1112498,"散装锅炉本体安装程序中，正确的是（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":22},"汽包安装→燃烧设备的安装→锅炉本体受热面的安装→尾部受热面的安装",{"key":24,"text":565,"correct":22},"燃烧设备的安装→汽包安装→锅炉本体受热面的安装→尾部受热面的安装",{"key":27,"text":567,"correct":29},"汽包安装→锅炉本体受热面的安装→尾部受热面的安装→燃烧设备的安装",{"key":31,"text":569,"correct":22},"锅炉本体受热面的安装→汽包安装→燃烧设备的安装→尾部受热面的安装",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":27,"analysis":33},1112499,"锅炉安装完毕后要进行烘炉、煮炉，煮炉目的不包括（ ）。",[574,575,576,578],{"key":20,"text":346,"correct":22},{"key":24,"text":344,"correct":22},{"key":27,"text":577,"correct":29},"使锅炉砖墙缓慢干燥，在使用时不致损裂",{"key":31,"text":579,"correct":22},"防止蒸汽品质恶化",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":20,"analysis":33},1112500,"光伏发电设备的安装程序中，光伏组件安装之后，应做的工作是（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":29},"汇流箱安装",{"key":24,"text":587,"correct":22},"逆变器安装",{"key":27,"text":589,"correct":22},"电气设备安装",{"key":31,"text":591,"correct":22},"调试",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":24,"analysis":33},1112501,"风力发电设备的安装程序中，塔筒安装之后，应安装（ ）。",[596,598,600,602],{"key":20,"text":597,"correct":22},"变频器、电器柜",{"key":24,"text":599,"correct":29},"机舱",{"key":27,"text":601,"correct":22},"发电机",{"key":31,"text":380,"correct":22},[604,607,610,613,616,619],{"id":15,"name":605,"category":7,"favorite":606},"领导干部任职前廉政法规知识测试题",92,{"id":608,"name":609,"category":7,"favorite":15},595,"建筑结构与设备",{"id":611,"name":612,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":614,"name":615,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":617,"name":618,"category":7,"favorite":8},534,"BIM工程师",{"id":620,"name":618,"category":7,"favorite":8},535]