[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":619},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,12,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,561,573,585,597,607],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1112401,1,"单选题","有关电缆的接地，下列说法不正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","三芯电力电缆终端处的金属护层必须接地良好",false,{"key":24,"text":25,"correct":26},"B","电缆的屏蔽层和铠装层应铅焊接地线",true,{"key":28,"text":29,"correct":22},"C","过零序电流互感器时，接地点在互感器以下时，接地线应直接接地",{"key":31,"text":32,"correct":22},"D","过零序电流互感器时，接地点在互感器以上时，接地线应穿过互感器接地","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1112402,"电缆封端应严密，并根据要求做绝缘试验。（ ）以上的电缆，应做交流耐压试验和直流泄漏试验",[38,40,42,44],{"key":20,"text":39,"correct":22},"3.6kV",{"key":24,"text":41,"correct":22},"4.8kV",{"key":28,"text":43,"correct":26},"6kV",{"key":31,"text":45,"correct":22},"2.4kV",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1112403,"电缆桥架经过建筑物伸缩缝时，应断开（ ）间隙。",[50,52,54,56],{"key":20,"text":51,"correct":22},"50-100mm",{"key":24,"text":53,"correct":22},"50-150mm",{"key":28,"text":55,"correct":26},"100-150mm",{"key":31,"text":57,"correct":22},"150-200mm",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1112404,"10kV高压设备试验时，未设置防护栅的操作人员与其最小安全距离为（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"0.4m",{"key":24,"text":65,"correct":22},"0.5m",{"key":28,"text":67,"correct":22},"0.6m",{"key":31,"text":69,"correct":26},"0.7m",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1112405,"通电检验的逐级顺序原则是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"先低压后高压，先干线后支线",{"key":24,"text":77,"correct":22},"先高压后低压，先支线后干线",{"key":28,"text":79,"correct":22},"先低压后高压，先支线后干线",{"key":31,"text":81,"correct":26},"先高压后低压，先干线后支线",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1112406,"架空电力线路导线架设程序中，导线展放的紧后工序是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"紧线",{"key":24,"text":89,"correct":22},"导线固定",{"key":28,"text":91,"correct":26},"导线连接",{"key":31,"text":93,"correct":22},"跳线连接",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1112407,"水泥电杆的立杆方法不包括（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"汽车起重机立杆",{"key":24,"text":101,"correct":26},"桅杆立杆",{"key":28,"text":103,"correct":22},"三脚架立杆",{"key":31,"text":105,"correct":22},"人字抱杆立杆",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1112408,"电气装置安装的施工程序中，电缆敷设的紧后工序是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"设备安装",{"key":24,"text":113,"correct":26},"回路接通",{"key":28,"text":115,"correct":22},"通电检查",{"key":31,"text":117,"correct":22},"通电调试",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1112409,"电气设备和器材在安装前的保管期限应按（ ）的要求。",[122,124,126,128],{"key":20,"text":123,"correct":22},"产品技术文件",{"key":24,"text":125,"correct":26},"厂家",{"key":28,"text":127,"correct":22},"设备和器材保管的专门规定",{"key":31,"text":129,"correct":22},"时间在一年及以下",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1112410,"配电柜中暂时不使用的电流互感器二次线圈应（ ）后再接地。",[134,136,138,140],{"key":20,"text":135,"correct":26},"短路",{"key":24,"text":137,"correct":22},"拆除",{"key":28,"text":139,"correct":22},"开路",{"key":31,"text":141,"correct":22},"绝缘",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1112411,"母线与设备连接前应进行封闭母线的（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"绝缘电阻测定",{"key":24,"text":149,"correct":22},"直流耐压试验",{"key":28,"text":151,"correct":22},"接地电阻测定",{"key":31,"text":153,"correct":22},"泄漏电流测量",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1112412,"架空导线连接正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"其接触电阻不应超过同长度导线电阻的1.2倍",{"key":24,"text":161,"correct":22},"导线连接处机械强度不应低于导线强度的70%",{"key":28,"text":163,"correct":22},"在任一档距内的每条导线，只能有两个接头",{"key":31,"text":165,"correct":22},"不同金属、不同截面的导线，不一定只在杆上跳线处连接",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1112413,"下列电气设备的安装要求，不正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"所有配件应采用镀锌制品",{"key":24,"text":173,"correct":22},"线圈绕向应符合设计要求",{"key":28,"text":175,"correct":22},"暂时不使用的电流互感器二次线圈应短路后再接地",{"key":31,"text":177,"correct":22},"放电回路应完整且操作灵活",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1112414,"机械牵引敷设电缆的速度一般不超过（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"15m\u002Fmin",{"key":24,"text":185,"correct":22},"20m\u002Fmin",{"key":28,"text":187,"correct":22},"25m\u002Fmin",{"key":31,"text":189,"correct":22},"30m\u002Fmin",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1112415,"380V橡塑电缆通电前应（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"做交流耐压试验",{"key":24,"text":197,"correct":26},"测试绝缘电阻",{"key":28,"text":199,"correct":22},"做直流耐压试验",{"key":31,"text":201,"correct":22},"做泄漏性试验",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1112416,"承受断线张力和控制事故范围的电杆是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"耐张杆",{"key":24,"text":209,"correct":22},"分支杆",{"key":28,"text":211,"correct":22},"终端杆",{"key":31,"text":213,"correct":22},"跨越杆",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},1112417,"油浸电力变压器安装程序中，滤油注油以后，应做的工作是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"附件安装",{"key":24,"text":221,"correct":22},"吊芯检查",{"key":28,"text":223,"correct":26},"交接试验",{"key":31,"text":225,"correct":22},"绝缘测试",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},1112418,"隔离开关的安装程序是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"本体检查→操作机构检查→就位→机械及电气性能试验",{"key":24,"text":233,"correct":22},"开箱检查→本体安装→充加六氟化硫→操作机构安装→检查、调整→绝缘测试→试验",{"key":28,"text":235,"correct":22},"开箱检查→本体安装→操作机构安装→检查、调整→绝缘测试→试验",{"key":31,"text":237,"correct":26},"开箱检查→本体安装→操作机构安装→调整",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},1112419,"架空电力线路安装程序中，立杆的紧后工序是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"横担安装",{"key":24,"text":245,"correct":22},"绝缘子安装",{"key":28,"text":247,"correct":26},"拉线安装",{"key":31,"text":249,"correct":22},"导线架设",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},1112420,"低压架空线的导线一般采用（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"钢芯铝绞线",{"key":24,"text":257,"correct":22},"铝包钢芯铝绞线",{"key":28,"text":259,"correct":22},"钢绞线",{"key":31,"text":261,"correct":26},"塑料铜芯线",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1112421,"施工现场临时用电架空线路中耐张杆、转角杆采用（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"针式绝缘子",{"key":24,"text":269,"correct":26},"蝶式绝缘子",{"key":28,"text":271,"correct":22},"悬式绝缘子",{"key":31,"text":273,"correct":22},"棒式绝缘子",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},1112422,"电缆金属桥架垂直段安装时，（ ）设置一个支架。",[278,280,282,284],{"key":20,"text":279,"correct":22},"每1.5～3m",{"key":24,"text":281,"correct":22},"每1m",{"key":28,"text":283,"correct":26},"每1～1.5m",{"key":31,"text":285,"correct":22},"每1.5m",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1112423,"铠装塑料绝缘单芯电缆的最小允许弯曲半径为电缆外径的（ ）倍。",[290,292,294,296],{"key":20,"text":291,"correct":22},"10",{"key":24,"text":293,"correct":26},"15",{"key":28,"text":295,"correct":22},"20",{"key":31,"text":297,"correct":22},"25",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":28,"analysis":33},1112424,"防止电缆延燃的措施不包括（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"控制电缆采用防火或阻燃电缆",{"key":24,"text":305,"correct":22},"电缆进入电缆沟、电缆隧道要进行防火封堵",{"key":28,"text":307,"correct":26},"电缆沟、电缆隧道内每隔100m设一道防火墙",{"key":31,"text":309,"correct":22},"电力电缆与控制电缆之间设防火隔板",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},1112425,"有关母线的连接固定，正确的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"母线应在找正及固定前，进行导体的焊接",{"key":24,"text":317,"correct":22},"母线与设备连接完毕后，应进行母线绝缘电阻的测试",{"key":28,"text":319,"correct":26},"金属母线与设备连接部位，应设置热胀冷缩或基础沉降的补偿装置",{"key":31,"text":321,"correct":22},"通过焊接将母线固定在支柱绝缘子上",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},1112426,"ABC三相交流母线的相色分别为（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"红绿黄",{"key":24,"text":329,"correct":22},"红黄绿",{"key":28,"text":331,"correct":26},"黄绿红",{"key":31,"text":333,"correct":22},"黄红绿",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},1112427,"下列母线安装偏差中，不符合规定的是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"封闭母线水平度偏差0.1%",{"key":24,"text":341,"correct":22},"动力母线全长偏差18mm",{"key":28,"text":343,"correct":22},"照明母线全长水平偏差4mm",{"key":31,"text":345,"correct":26},"照明母线全长垂直偏差15mm",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1112428,"母线的接地要求错误的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"封闭母线槽全长保护接地不少于2处",{"key":24,"text":353,"correct":26},"封闭母线与接地干线连接采用螺栓连接",{"key":28,"text":355,"correct":22},"分支段母线槽的末端需保护接地",{"key":31,"text":357,"correct":22},"封闭母线可靠接地前，不得进行交接试验和通电试运行",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},1112429,"下列电气设备安装要求，正确的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"电气设备配件应采用镀锌制品",{"key":24,"text":365,"correct":22},"电抗器线圈绕向应施工方便",{"key":28,"text":367,"correct":22},"电流互感器二次线圈应开路后接地",{"key":31,"text":369,"correct":26},"电容器放电回路应完整且操作灵活",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},1112430,"用机械牵引敷设电缆时，允许牵引强度最大的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":26},"铜芯牵引头",{"key":24,"text":377,"correct":22},"铝芯牵引头",{"key":28,"text":379,"correct":22},"铅芯钢丝网套",{"key":31,"text":381,"correct":22},"塑料护套",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},1112431,"直埋电缆的电缆沟与热力管道平行敷设时，最小净距为（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":26},"1.0m",{"key":24,"text":389,"correct":22},"1.5m",{"key":28,"text":391,"correct":22},"2.0m",{"key":31,"text":393,"correct":22},"3.0m",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},1112432,"卷管制作时，同一筒节上两纵焊缝间距不应小于（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"50",{"key":24,"text":401,"correct":22},"100",{"key":28,"text":403,"correct":22},"150",{"key":31,"text":405,"correct":26},"200",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":31,"analysis":33},1112433,"防腐蚀衬里管道组成件，如，橡胶、塑料、玻璃钢、涂料等衬里的管道组成件，应存放在温度为（ ）的室内，并避免阳光和热源辐射。",[410,412,414,416],{"key":20,"text":411,"correct":22},"-10～5℃",{"key":24,"text":413,"correct":22},"B-5～0℃",{"key":28,"text":415,"correct":22},"0～5℃",{"key":31,"text":417,"correct":26},"5～40℃",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},1112434,"管道系统压力试验时对压力表的要求不包括（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"压力表在周检期内并已经校验",{"key":24,"text":425,"correct":26},"压力表精度不得低于1.5级",{"key":28,"text":427,"correct":22},"压力表不少于两块",{"key":31,"text":429,"correct":22},"表的满刻度值应为被测压力的1.5～2倍",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},1112435,"非热力管道不得用（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"水冲洗",{"key":24,"text":437,"correct":22},"空气吹扫",{"key":28,"text":439,"correct":22},"酸洗",{"key":31,"text":441,"correct":26},"蒸汽吹扫",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},1112436,"管道进行气压试验的正确步骤是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"缓慢升压至试验压力的30%→按试验压力的10%逐级升压后每级稳压3min→直至试验压力稳压10min→试验压力降至设计压力涂发泡剂检验不泄漏为合格",{"key":24,"text":449,"correct":26},"缓慢升压至试验压力的50%→按试验压力的10%逐级升压后每级稳压3min→直至试验压力稳压10min→试验压力降至设计压力涂发泡剂检验不泄漏为合格",{"key":28,"text":451,"correct":22},"缓慢升压至试验压力→稳压10min→涂发泡剂检验不泄漏为合格",{"key":31,"text":453,"correct":22},"缓慢升压至试验压力→稳压10min→试验压力降至设计压力保持30min→以压力不降、无渗漏为合格",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},1112437,"设计压力为1.6MPa的管道属于（ ）管道。",[458,460,462,464],{"key":20,"text":459,"correct":26},"低压",{"key":24,"text":461,"correct":22},"中压",{"key":28,"text":463,"correct":22},"高压",{"key":31,"text":465,"correct":22},"超高压",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},1112438,"安全阀的出口管道应接向安全地点，安全阀安装应满足（ ）安装。",[470,472,474,476],{"key":20,"text":471,"correct":26},"垂直",{"key":24,"text":473,"correct":22},"倾角60°",{"key":28,"text":475,"correct":22},"倾角30°",{"key":31,"text":477,"correct":22},"水平",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":31,"analysis":33},1112439,"管道由管道组成件和管道（ ）组成。",[482,484,486,488],{"key":20,"text":483,"correct":22},"安装件",{"key":24,"text":485,"correct":22},"附着件",{"key":28,"text":487,"correct":22},"固定件",{"key":31,"text":489,"correct":26},"支承件",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1112440,"下列关于管道系统液压试验实施要点的说法中，正确的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"液压试验应使用洁净水，对不锈钢管道，水中氯离子含量不得超过50ppm",{"key":24,"text":497,"correct":26},"试验前，注入液体时应排尽气体",{"key":28,"text":499,"correct":22},"试验时环境温度不宜低于0℃，当环境温度低于0℃时应采取防冻措施",{"key":31,"text":501,"correct":22},"承受内压的地上钢管道试验压力为设计压力的1.15倍",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},1112441,"蒸汽管道系统应用蒸汽吹扫，吹扫前先行（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"用水冲洗",{"key":24,"text":509,"correct":22},"用空气吹扫",{"key":28,"text":511,"correct":26},"暖管",{"key":31,"text":513,"correct":22},"排尽气体",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":31,"analysis":33},1112442,"关于阀门的密封试验，说法正确的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"阀门宜用海水试压",{"key":24,"text":521,"correct":22},"阀门的壳体强度试验压力为阀门在20℃时最大允许工作压力的1.6倍",{"key":28,"text":523,"correct":22},"无特殊规定时试验介质温度不得低于0℃",{"key":31,"text":525,"correct":26},"阀门的密封性试验压力为阀门在20℃时最大允许工作压力的1.1倍",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},1112443,"输送介质温度为-40℃＜t≤120℃的工业管道属于（ ）管道。",[530,532,534,536],{"key":20,"text":531,"correct":22},"低温",{"key":24,"text":533,"correct":26},"常温",{"key":28,"text":535,"correct":22},"中温",{"key":31,"text":537,"correct":22},"高温",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},1112444,"下列表述中，正确的是（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"管道由管道安装件和管道附着件组成",{"key":24,"text":545,"correct":22},"管道由管道安装件和管道支承件组成",{"key":28,"text":547,"correct":22},"管道由管道组成件和管道安装件组成",{"key":31,"text":549,"correct":26},"管道由管道组成件和管道支承件组成",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":28,"analysis":33},1112445,"管道系统压力试验前，管道上的膨胀节应（ ）。",[554,556,557,559],{"key":20,"text":555,"correct":22},"隔离",{"key":24,"text":137,"correct":22},{"key":28,"text":558,"correct":26},"设置临时约束装置",{"key":31,"text":560,"correct":22},"处于自然状态",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":20,"analysis":33},1112446,"管道与设备作为一个系统进行液压试验时，当管道的试验压力等于或小于设备的试验压力时.应按（ ）进行试验。",[565,567,569,571],{"key":20,"text":566,"correct":26},"管道的试验压力",{"key":24,"text":568,"correct":22},"设备的试验压力",{"key":28,"text":570,"correct":22},"管道的试验压力的1.15倍",{"key":31,"text":572,"correct":22},"设备的设计压力的1.15倍",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":20,"analysis":33},1112447,"泄漏性试验的试验介质宜采用空气，试验压力为（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":26},"设计压力",{"key":24,"text":580,"correct":22},"工作压力",{"key":28,"text":582,"correct":22},"设计压力的1.15倍",{"key":31,"text":584,"correct":22},"工作压力的1.15倍",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":31,"analysis":33},1112448,"防腐蚀衬里管道安装施工中，做法错误的是（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":22},"有衬里的管道组成件应保证一定的存放环境，避免阳光和热源的辐射",{"key":24,"text":592,"correct":22},"当需要调整安装长度误差时，宜采用更换同材质垫片厚度的方法进行",{"key":28,"text":594,"correct":22},"安装时采用软质或半硬质垫片",{"key":31,"text":596,"correct":26},"安装过程中必要时可施焊、加热",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":31,"analysis":33},1112449,"某条公称直径为DN450mm的天然气管道，适宜采用的吹洗方法是（ ）。",[601,602,604,605],{"key":20,"text":435,"correct":22},{"key":24,"text":603,"correct":22},"人工清理",{"key":28,"text":441,"correct":22},{"key":31,"text":606,"correct":26},"压缩空气吹扫",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":31,"analysis":33},1112450,"属于管道支撑件的是（ ）。",[611,613,615,617],{"key":20,"text":612,"correct":22},"法兰",{"key":24,"text":614,"correct":22},"膨胀接头",{"key":28,"text":616,"correct":22},"过滤器",{"key":31,"text":618,"correct":26},"吊耳",[620,623,626,629,632,635],{"id":15,"name":621,"category":7,"favorite":622},"领导干部任职前廉政法规知识测试题",92,{"id":624,"name":625,"category":7,"favorite":15},595,"建筑结构与设备",{"id":627,"name":628,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":630,"name":631,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":633,"name":634,"category":7,"favorite":8},534,"BIM工程师",{"id":636,"name":634,"category":7,"favorite":8},535]