[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":605},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,11,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,213,225,237,249,261,273,285,297,309,321,333,344,356,368,380,392,402,414,426,438,450,460,468,480,492,500,512,521,533,545,557,569,581,593],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1112350,1,"单选题","全站仪与普通测量的区别是不用钢卷尺，可进行（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","水平角测量",false,{"key":24,"text":25,"correct":22},"B","垂直角测量",{"key":27,"text":28,"correct":22},"C","高程测量",{"key":30,"text":31,"correct":32},"D","水平距离测量",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1112351,"安装一次仪器，可以同时测出数个前视点的高程时，可以采用（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"水准法",{"key":24,"text":41,"correct":32},"仪高法",{"key":27,"text":43,"correct":22},"高差法",{"key":30,"text":45,"correct":22},"准高法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1112352,"有关基准线测量原理说法，不正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"基准线测量原理是利用经纬仪和检定钢尺，根据两点成一直线原理测定基准线",{"key":24,"text":53,"correct":22},"只要定出两个基准中心点，就构成一条基准线",{"key":27,"text":55,"correct":32},"相邻安装基准点高差应在5mm以内",{"key":30,"text":57,"correct":22},"沉降观测采用二等水准测量方法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1112353,"在工程测量的基本程序中，设置纵横中心线后，下一步应进行的程序是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"安装过程测量控制",{"key":24,"text":65,"correct":32},"设置标高基准点",{"key":27,"text":67,"correct":22},"设置沉降观测点",{"key":30,"text":69,"correct":22},"实测记录",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1112354,"控制设备安装标高的常用测量仪器是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"光学水准仪",{"key":24,"text":77,"correct":22},"激光准直仪",{"key":27,"text":79,"correct":22},"全站仪",{"key":30,"text":81,"correct":22},"光学经纬仪",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},1112355,"经纬仪的功能和应用不包括（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"控制、地形测量",{"key":24,"text":89,"correct":22},"基础放线",{"key":27,"text":91,"correct":22},"角度测量",{"key":30,"text":93,"correct":32},"距离测量",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1112356,"矿井检测勘探宜采用（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"水下机器人",{"key":24,"text":101,"correct":22},"放样机器人",{"key":27,"text":103,"correct":32},"管道检测机器人",{"key":30,"text":105,"correct":22},"GPS定位系统",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1112357,"有关管线工程的测量，正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"管线中心定位就是将控制点位置测设到地面上去",{"key":24,"text":113,"correct":22},"管线敷设临时水准点必须选在旧建筑物墙角、台阶等处",{"key":27,"text":115,"correct":32},"临时标桩可作为水准点",{"key":30,"text":117,"correct":22},"地下管线工程测量必须在回填后，测量出起、止点，窨井坐标和管顶标高",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1112359,"轴承间隙的检测及调整中，轴颈与轴瓦的侧间隙可用（ ）测量。",[122,124,126,128],{"key":20,"text":123,"correct":22},"压铅法",{"key":24,"text":125,"correct":32},"塞尺",{"key":27,"text":127,"correct":22},"游标卡尺",{"key":30,"text":129,"correct":22},"千分表",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1112360,"无垫铁施工时，设备底座上设有安装用调整螺钉时，其调整螺钉支承板上表面水平度允许偏差不大于（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"1\u002F100",{"key":24,"text":137,"correct":32},"1\u002F1000",{"key":27,"text":139,"correct":22},"2\u002F100",{"key":30,"text":141,"correct":22},"2\u002F1000",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1112361,"设备灌浆可使用的灌浆料很多，下列材料中，不可作为设备二次灌浆使用的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":32},"中石混凝土",{"key":24,"text":149,"correct":22},"无收缩混凝土",{"key":27,"text":151,"correct":22},"微膨胀混凝土",{"key":30,"text":153,"correct":22},"CGM高效无收缩灌浆料",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1112362,"对开式滑动轴承装配内容不包括（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"轴瓦的刮研",{"key":24,"text":161,"correct":22},"轴承的安装",{"key":27,"text":163,"correct":32},"螺纹连接件装配",{"key":30,"text":165,"correct":22},"轴承间隙的检测与调整",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1112363,"设备安装前，要求对设备基础位置和几何尺寸进行（ ），其允许偏差应符合设计文件或国家现行有关规范的规定。",[170,172,174,176],{"key":20,"text":171,"correct":22},"查看",{"key":24,"text":173,"correct":32},"复检",{"key":27,"text":175,"correct":22},"交接验收",{"key":30,"text":177,"correct":22},"施工记录检查",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},1112364,"下列项目中，不属于设备基础外观质量检查验收要求的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"外表面无裂纹、空洞、掉角、露筋",{"key":24,"text":185,"correct":22},"地脚螺栓预留孔内无露筋、凹凸等缺陷",{"key":27,"text":187,"correct":32},"混凝土配合比及混凝土强度符合设计要求",{"key":30,"text":189,"correct":22},"放置垫铁的基础表面平整，中心标板和基准点埋设牢固",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},1112365,"每组垫铁的块数不宜超过（ ）块。",[194,196,198,200],{"key":20,"text":195,"correct":22},"3",{"key":24,"text":197,"correct":22},"4",{"key":27,"text":199,"correct":32},"5",{"key":30,"text":201,"correct":22},"6",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1112366,"机械设备安装中进行水平度调整（找平），通常在设备精加工面上选择测点用（ ）进行测量。",[206,208,210,211],{"key":20,"text":207,"correct":32},"水平仪",{"key":24,"text":209,"correct":22},"经纬仪",{"key":27,"text":79,"correct":22},{"key":30,"text":212,"correct":22},"百分表",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":30,"analysis":33},1112367,"机械设备灌浆分为一次灌浆和二次灌浆，一台大型机械设备二次灌浆是对（ ）进行的灌浆。",[217,219,221,223],{"key":20,"text":218,"correct":22},"地脚螺栓预留孔",{"key":24,"text":220,"correct":22},"部分受力地脚螺栓预留孔",{"key":27,"text":222,"correct":22},"垫铁与基础间的空隙",{"key":30,"text":224,"correct":32},"设备底座和基础间",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":30,"analysis":33},1112368,"环境因素对机械设备安装精度的影响不容忽视。下列环境因素中，不属于影响机械设备安装精度的主要因素是（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"基础温度变形",{"key":24,"text":232,"correct":22},"设备温度变形",{"key":27,"text":234,"correct":22},"安装工程处于进行生产的场所影响作业人员视线、听力、注意力",{"key":30,"text":236,"correct":32},"安装场所湿度大",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1112369,"垫铁组的组合符合要求的是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"每个地脚螺栓旁边至少应有二组垫铁",{"key":24,"text":244,"correct":32},"相邻二组垫铁间的距离，宜为500-1000mm",{"key":27,"text":246,"correct":22},"每组垫铁的块数不宜超过4块",{"key":30,"text":248,"correct":22},"放置平垫铁时，厚的宜放在上面",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},1112370,"按照机械设备安装的一般程序，下列工序中顺序正确的是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"基础检查验收→设备吊装就位→垫铁设置→设备安装调整→设备固定与灌浆",{"key":24,"text":256,"correct":32},"基础检查验收→垫铁设置→设备吊装就位→设备安装调整→设备固定与灌浆",{"key":27,"text":258,"correct":22},"设备吊装就位→基础检查验收→垫铁设置→设备安装调整→设备固定与灌浆",{"key":30,"text":260,"correct":22},"基础检查验收→垫铁设置→设备吊装就位→设备固定与灌浆→设备安装调整",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":20,"analysis":33},1112371,"对于拆迁设备、旧设备以及因精度达不到使用要求的机械设备，其施工及验收要求，应由建设单位和（ ）另行商定。",[265,267,269,271],{"key":20,"text":266,"correct":32},"施工单位",{"key":24,"text":268,"correct":22},"监理单位",{"key":27,"text":270,"correct":22},"设计单位",{"key":30,"text":272,"correct":22},"设备制造单位",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":30,"analysis":33},1112372,"下列项目中，属于设备基础常见质量通病的是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"基础中心线偏差过大",{"key":24,"text":280,"correct":22},"混凝土强度不符合设计要求",{"key":27,"text":282,"correct":22},"混凝土配合比不正确",{"key":30,"text":284,"correct":32},"基础上平面标高超差",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":30,"analysis":33},1112373,"除铸铁垫铁外，设备调整完毕后各垫铁应（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":22},"将垫铁楔紧，但相互间不进行定位焊",{"key":24,"text":292,"correct":22},"相互间不进行定位焊，顶块垫铁与设备底座用定位焊焊牢",{"key":27,"text":294,"correct":22},"相互间及顶块垫铁与设备底座间用定位焊焊牢",{"key":30,"text":296,"correct":32},"相互间用定位焊焊牢，不与设备底座相焊",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},1112374,"机械设备灌浆分为一次灌浆和二次灌浆，大型机械设备一次灌浆应在（ ）进行。",[301,303,305,307],{"key":20,"text":302,"correct":22},"机座就位后",{"key":24,"text":304,"correct":32},"设备粗找正后",{"key":27,"text":306,"correct":22},"设备精找正后",{"key":30,"text":308,"correct":22},"地脚螺栓紧固合格后",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},1112375,"单体试运转考核的主要对象是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":32},"单台机械设备",{"key":24,"text":316,"correct":22},"生产线或联动机组中各设备相互配合",{"key":27,"text":318,"correct":22},"生产线或联动机组中各设备按工艺流程的动作程序",{"key":30,"text":320,"correct":22},"联锁装置",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":30,"analysis":33},1112376,"下列关于影响设备安装精度的因素的说法中，错误的是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"设备制造对安装精度的影响主要是加工精度和装配精度",{"key":24,"text":328,"correct":22},"垫铁埋设对安装精度的影响主要是承载面积和接触情况",{"key":27,"text":330,"correct":22},"测量误差对安装精度的影响主要是仪器精度、基准精度",{"key":30,"text":332,"correct":32},"设备灌浆对安装精度的影响主要是二次灌浆层的厚度",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":27,"analysis":33},1112377,"设备基础对机械设备安装精度影响的主要因素是（ ）。",[337,339,340,342],{"key":20,"text":338,"correct":22},"基础的外形尺寸不合格",{"key":24,"text":284,"correct":22},{"key":27,"text":341,"correct":32},"基础强度不够",{"key":30,"text":343,"correct":22},"预埋地脚螺栓标高超差",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},1112378,"地脚螺栓对安装精度的影响主要是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":32},"地脚螺栓紧固力不够",{"key":24,"text":351,"correct":22},"地脚螺栓中心线偏移过大",{"key":27,"text":353,"correct":22},"地脚螺栓标高超差",{"key":30,"text":355,"correct":22},"预埋地脚螺栓孔深度不够",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},1112379,"控制机械设备安装精度应从人、机、料、法、环等方面着手，尤其强调（ ）的因素。",[360,362,364,366],{"key":20,"text":361,"correct":22},"施工工艺",{"key":24,"text":363,"correct":32},"人员",{"key":27,"text":365,"correct":22},"施工机械和测量器具",{"key":30,"text":367,"correct":22},"环境",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":27,"analysis":33},1112380,"连续生产机组中各单体设备的安装精度偏差要相互补偿，例如控制相邻设备水平度偏差的方向相反，其目的是（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":22},"保证机组的总偏差在规范允许范围内",{"key":24,"text":375,"correct":22},"保证单体设备的安装精度",{"key":27,"text":377,"correct":32},"不产生偏差积累",{"key":30,"text":379,"correct":22},"避免和排除影响安装精度的因素",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":27,"analysis":33},1112381,"不属于过盈配合件的装配方法有（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":22},"压入装配法",{"key":24,"text":387,"correct":22},"低温冷装配法",{"key":27,"text":389,"correct":32},"焊接固定法",{"key":30,"text":391,"correct":22},"加热装配法",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},1112382,"无负荷单体试运转规程由（ ）负责编制，并负责试运转的组织、指挥和操作。",[396,397,399,400],{"key":20,"text":266,"correct":32},{"key":24,"text":398,"correct":22},"建设单位",{"key":27,"text":268,"correct":22},{"key":30,"text":401,"correct":22},"供货厂家",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},1112383,"联轴器装配时，需测量的参数不包括（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"端面间隙",{"key":24,"text":409,"correct":32},"轴向间隙",{"key":27,"text":411,"correct":22},"两轴线倾斜",{"key":30,"text":413,"correct":22},"两轴心径向位移",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},1112384,"下列设备安装的一般程序，正确的是（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":22},"施工准备→基础测量放线→设备开箱检查",{"key":24,"text":421,"correct":32},"基础检查验收→垫铁设置→设备吊装就位",{"key":27,"text":423,"correct":22},"设备吊装就位→设备固定与灌浆→设备安装调整",{"key":30,"text":425,"correct":22},"设备固定与灌浆→润滑与设备加油→零部件清洗与装配",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":33},1112385,"机械设备就位前，按（ ）并依据测量控制网或相关建筑物轴线划定安装的基准线和基准点。",[430,432,434,436],{"key":20,"text":431,"correct":32},"工艺布置图",{"key":24,"text":433,"correct":22},"现场条件",{"key":27,"text":435,"correct":22},"相关标高线",{"key":30,"text":437,"correct":22},"设备结构图",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":27,"analysis":33},1112386,"机械设备安装找平过程中，将设备调整到设计或规范规定的水平状态的方法是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"千斤顶顶升",{"key":24,"text":445,"correct":22},"调整调节螺钉",{"key":27,"text":447,"correct":32},"调整垫铁高度",{"key":30,"text":449,"correct":22},"楔入专用斜铁器",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":27,"analysis":33},1112387,"一次灌浆是设备粗找正后，对（ ）进行的灌浆。",[454,456,458,459],{"key":20,"text":455,"correct":22},"设备底座",{"key":24,"text":457,"correct":22},"设备基础间",{"key":27,"text":218,"correct":32},{"key":30,"text":224,"correct":22},{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":30,"analysis":33},1112388,"在安装现场，过盈配合件的装配方法主要采用（ ）。",[464,465,466,467],{"key":20,"text":385,"correct":22},{"key":24,"text":387,"correct":22},{"key":27,"text":389,"correct":22},{"key":30,"text":391,"correct":32},{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":27,"analysis":33},1112389,"设备单体试运转的顺序是（ ）。",[472,474,476,478],{"key":20,"text":473,"correct":22},"先电动，后手动；先点动，后连续；先低速，后中、高速",{"key":24,"text":475,"correct":22},"先手动，后电动；先连续，后点动；先低速，后中、高速",{"key":27,"text":477,"correct":32},"先手动，后电动；先点动，后连续；先低速，后中、高速",{"key":30,"text":479,"correct":22},"先手动，后电动；先点动，后连续；先中、高速，后低速",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":24,"analysis":33},1112390,"从某种意义上讲，无负荷联动试运转主要是考核（ ）。",[484,486,488,490],{"key":20,"text":485,"correct":22},"机械联锁",{"key":24,"text":487,"correct":32},"电气联锁及自控功能",{"key":27,"text":489,"correct":22},"液压系统",{"key":30,"text":491,"correct":22},"操作控制系统",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":24,"analysis":33},1112391,"无负荷联动试运转规程由（ ）负责编制。",[496,497,498,499],{"key":20,"text":398,"correct":22},{"key":24,"text":266,"correct":32},{"key":27,"text":270,"correct":22},{"key":30,"text":268,"correct":22},{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":20,"analysis":33},1112392,"环境气温下降时，对设备基础造成的影响是（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":32},"设备基础中间下陷",{"key":24,"text":507,"correct":22},"设备基础边缘下陷",{"key":27,"text":509,"correct":22},"设备基础中间上拱",{"key":30,"text":511,"correct":22},"设备基础边缘上拱",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},1112393,"下列单位中，可不参加设备开箱检验的单位是（ ）。",[516,517,519,520],{"key":20,"text":270,"correct":32},{"key":24,"text":518,"correct":22},"供货单位",{"key":27,"text":266,"correct":22},{"key":30,"text":398,"correct":22},{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},1112394,"安装带悬臂转动机构的设备，在安装时应该控制偏差使其悬臂轴（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"水平",{"key":24,"text":528,"correct":32},"上扬",{"key":27,"text":530,"correct":22},"向前倾斜",{"key":30,"text":532,"correct":22},"向下倾斜",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},1112395,"关于母线连接固定的说法，正确的是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":32},"必须采用规定的螺栓规格",{"key":24,"text":540,"correct":22},"螺母侧可以不装弹簧垫圈",{"key":27,"text":542,"correct":22},"螺栓应由上往下穿",{"key":30,"text":544,"correct":22},"紧固用套筒扳手",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},1112396,"现场临时用电架空线路中，直线杆和15°以下的转角杆，采用（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"单横担、双绝缘子",{"key":24,"text":552,"correct":32},"单横担、单绝缘子",{"key":27,"text":554,"correct":22},"双横担、双绝缘子",{"key":30,"text":556,"correct":22},"十字横担",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":27,"analysis":33},1112397,"关于电缆敷设的要求中，正确的有（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"敷设在排管内的电缆，可不采用铠装电缆",{"key":24,"text":564,"correct":22},"由于电缆防水防潮，电缆排管在敷设电缆前，可不进行疏通，清除杂物及积水",{"key":27,"text":566,"correct":32},"排管内穿电缆时，不得损坏电缆护层，可采用无腐蚀性的润滑剂",{"key":30,"text":568,"correct":22},"穿入管中的电缆数量应符合设计要求，交流单芯电缆可单独穿入钢管内",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":27,"analysis":33},1112398,"对电气操作人员的要求不包括（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"具备电工特种作业操作证资格",{"key":24,"text":576,"correct":22},"能正确使用消防用具和设备",{"key":27,"text":578,"correct":32},"懂得电气设备安全故障维修",{"key":30,"text":580,"correct":22},"熟知人身触电紧急救护方法",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":30,"analysis":33},1112399,"二次线路中的弱电回路绝缘电阻测定应按（ ）的规定进行。",[585,587,589,591],{"key":20,"text":586,"correct":22},"设计要求",{"key":24,"text":588,"correct":22},"施工规范",{"key":27,"text":590,"correct":22},"合同要求",{"key":30,"text":592,"correct":32},"制造厂",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":20,"analysis":33},1112400,"架空线路放线过程中，将导线盘架设在放线架上，采用人力或机械力牵行的放线方法是（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":32},"拖放法",{"key":24,"text":600,"correct":22},"拉放法",{"key":27,"text":602,"correct":22},"展放法",{"key":30,"text":604,"correct":22},"拽放法",[606,609,612,615,618,621],{"id":15,"name":607,"category":7,"favorite":608},"领导干部任职前廉政法规知识测试题",92,{"id":610,"name":611,"category":7,"favorite":15},595,"建筑结构与设备",{"id":613,"name":614,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":616,"name":617,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":619,"name":620,"category":7,"favorite":8},534,"BIM工程师",{"id":622,"name":620,"category":7,"favorite":8},535]