[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1114055":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1114055,787,2,"多选题","施工现场使用的计量器具，项目经理部必须设专（兼）职计量管理员进行跟踪管理，包括（）的计量器具。2013",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","向外单位租用",true,{"key":16,"text":17,"correct":18},"B","法定计量检定机构",false,{"key":20,"text":21,"correct":14},"C","施工单位自有",{"key":23,"text":24,"correct":18},"D","有相应资质检测单位",{"key":26,"text":27,"correct":14},"E","由建设单位提供","ACE","施工现场使用的计量器具，无论是企业自有的、租用的或是由建设方提供的，均需按照建立的管理制度进行管理。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]