[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1114052":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1114052,787,2,"多选题","降低项目施工成本的组织措施有（）。2018",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","将成本责任分解到各岗位",true,{"key":16,"text":17,"correct":18},"B","选择最佳施工方案",false,{"key":20,"text":21,"correct":14},"C","确定合理的工作流程",{"key":23,"text":24,"correct":18},"D","制定资金使用计划",{"key":26,"text":27,"correct":18},"E","采取必要的风险对策","AC","B属于技术措施；D属于经济措施；E属于合同措施。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]