[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1114042":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1114042,787,2,"多选题","比较各施工方案技术的先进性，应包括的内容有（）。2018",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","技术水平",true,{"key":16,"text":17,"correct":14},"B","技术创新程度",{"key":19,"text":20,"correct":14},"C","技术效率",{"key":22,"text":23,"correct":14},"D","实施的安全性",{"key":25,"text":26,"correct":27},"E","实施的地域性",false,"ABCD","技术的先进性比较：比较各方案的技术水平；比较各方案的技术创新程度；比较各方案的技术效率；比较各方案实施的安全性。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]