[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1114020":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1114020,787,2,"多选题","符合风管安装就位程序的是（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","先下层后上层",false,{"key":16,"text":17,"correct":18},"B","先上层后下层",true,{"key":20,"text":21,"correct":18},"C","先立管后水平管",{"key":23,"text":24,"correct":14},"D","先水平管后立管",{"key":26,"text":27,"correct":14},"E","先大管后小管","BC","还有先主干管后支管。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]