[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1114001":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1114001,787,2,"多选题","高层建筑排水管道按设计要求应设置（）。2018",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","阻火圈",true,{"key":16,"text":17,"correct":14},"B","防火套管",{"key":19,"text":20,"correct":21},"C","防雷装置",false,{"key":23,"text":24,"correct":14},"D","伸缩节",{"key":26,"text":27,"correct":21},"E","补偿器","ABD","高层建筑管道施工技术要点。排水塑料管必须按设计要求及位置装设伸缩节。如设计无要求时，伸缩节间距不得大于4m。高层建筑中明设排水管道应按设计要求设置阻火圈或防火套管。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]