[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113989":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113989,787,2,"多选题","钢网架结构中要求测定挠度值不应超过设计值的1.5倍，其测定应该在（）工序完成后进行。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","网架地面组装",false,{"key":16,"text":17,"correct":14},"B","网架试吊中",{"key":19,"text":20,"correct":21},"C","结构总拼装",true,{"key":23,"text":24,"correct":21},"D","屋面工程",{"key":26,"text":27,"correct":14},"E","单元网格安装","CD","钢网架结构总拼完成后及屋面工程完成后应分别测量其挠度值，且所测的挠度值不应超过相应设计值的1.5倍。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]