[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113948":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113948,787,2,"多选题","管线中心测量定位的依据主要是（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","根据地面上已有建筑物进行管线定位",true,{"key":16,"text":17,"correct":18},"B","根据相应设备的位置和标高进行定位",false,{"key":20,"text":21,"correct":18},"C","根据设计图纸进行定位",{"key":23,"text":24,"correct":14},"D","根据控制点进行定位",{"key":26,"text":27,"correct":18},"E","根据管线安装位置的实际情况进行定位","AD","管线中心定位的测量方法：定位时可根据地面上已有建筑物进行管线定位，也可根据控制点进行管线定位。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]