[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113913":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113913,787,2,"多选题","有关工程分包的施工验收，正确的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","分包单位对所承建的分项、分部工程质量向建设单位负责",false,{"key":16,"text":17,"correct":14},"B","分包汇总有关的分项、分部工程资料",{"key":19,"text":20,"correct":21},"C","总承包单位应对分包工程质量全面负责",true,{"key":23,"text":24,"correct":21},"D","由总承包单位报验",{"key":26,"text":27,"correct":14},"E","所有分包工程共同提出报验，由建设单位组织验收","CD","2020版教材P360~363 本题考查的是工业安装工程施工质量验收的组织与合格规定。当工程由分包单位施工时，分包单位对所承建的分项、分部工程质量向总承包单位负责，总承包单位参加分包单位分项、分部工程的检验，并汇总有关资料。总承包单位应对分包工程质量全面负责，并应由总承包单位报验。当安装单位或安装、调试单位不是一个总承包单位时，可以分别或共同提出报验，由建设单位组织验收。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]