[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113880":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113880,787,2,"多选题","杜绝任何（ ）计量器具流入工作岗位。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","精度低的",false,{"key":16,"text":17,"correct":14},"B","等级低的",{"key":19,"text":20,"correct":21},"C","未经检定的",true,{"key":23,"text":24,"correct":21},"D","经检定不合格的",{"key":26,"text":27,"correct":21},"E","超过检定周期的","CDE","2020版教材P332 杜绝任何未经检定的、经检定不合格的或者超过检定周期的计量器具流入工作岗位。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]