[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113795":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113795,787,2,"多选题","施工单位在电梯安装前书面告知中提交的材料有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","施工单位资格证件",true,{"key":16,"text":17,"correct":14},"B","施工人员资格证件",{"key":19,"text":20,"correct":14},"C","施工组织与技术方案",{"key":22,"text":23,"correct":14},"D","工程合同",{"key":25,"text":26,"correct":27},"E","施工记录",false,"ABCD","2020版教材P172 书面告知应提交的资料。包括《特种设备安装改造维修告知单》；施工单位及人员资格证件；施工组织及技术方案；工程合同；安装监督检验约请书，电梯制造单位的资质证件。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]