[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113780":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113780,787,2,"多选题","消防工程资料移交包括消防工程在设计、施工和验收过程中所形成的（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","安装文件",false,{"key":16,"text":17,"correct":14},"B","招标文件",{"key":19,"text":20,"correct":21},"C","技术文件",true,{"key":23,"text":24,"correct":21},"D","经济文件",{"key":26,"text":27,"correct":14},"E","合同文件","CD","2020版教材P170 5）工程移交工程资料移交包括消防工程在设计、施工和验收过程中所形成的技术、经济文件。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]