[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113690":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113690,787,2,"多选题","设备、管道保冷层施工技术要求包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","采用层厚大于100mm的保冷制品时，应分两层或多层逐层施工",false,{"key":16,"text":17,"correct":14},"B","半硬质材料作保冷层，拼缝宽度不应大于5mm",{"key":19,"text":20,"correct":21},"C","保冷设备及管道上的支吊架，必须进行保冷",true,{"key":23,"text":24,"correct":21},"D","设备裙座里外均需保冷",{"key":26,"text":27,"correct":21},"E","设备铭牌应粘贴在保冷系统的外表面","CDE","2020版教材P115 本题考查的是绝热层施工技术要求。选项A：采用层厚大于80mm的保冷制品时，应分两层或多层逐层施工。选项B：半硬质材料作保冷层，拼缝宽度不应大于2mm。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]