[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113637":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113637,787,2,"多选题","管道穿越墙体、楼板或构筑物所设套管应符合的规定有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","套管内焊缝强度足够",false,{"key":16,"text":17,"correct":14},"B","穿过墙体的套管长度超出墙体50mm",{"key":19,"text":20,"correct":21},"C","穿过楼板的套管应高出楼面50mm",true,{"key":23,"text":24,"correct":21},"D","穿过屋面的管道应设置防水肩和防雨帽",{"key":26,"text":27,"correct":21},"E","管道与套管之间应填塞对管道无害的不燃材料","CDE","2020版教材P80 本题考查的是工业管道施工的技术要求。选项A，管道焊缝不应设置在套管内；选项B，套管穿出墙体的长度不得小于墙体厚度。@##",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]