[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113618":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113618,787,2,"多选题","在压力试验前，需经建设单位和有关部门复查的资料包括（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","管道元件的质量证明文件",true,{"key":16,"text":17,"correct":14},"B","管道组成件的检验或试验记录",{"key":19,"text":20,"correct":14},"C","管道安装记录",{"key":22,"text":23,"correct":24},"D","技术交底记录",false,{"key":26,"text":27,"correct":24},"E","焊工合格证","ABC","2020版教材P82 本题考查的是管道系统试验。在压力试验前，相关资料已经建设单位和有关部门复查。例如，管道元件的质量证明文件、管道组成件的检验或试验记录、管道加工和安装记录、焊接检查记录、检验报告和热处理记录、管道轴测图、设计变更及材料代用文件。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]