[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113550":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113550,787,2,"多选题","有关高程控制测量说法，正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","测区的高程系统，宜采用国家高程基准",true,{"key":16,"text":17,"correct":18},"B","高程测量常用解析法",false,{"key":20,"text":21,"correct":14},"C","—个测区及其周围至少应有3个水准点",{"key":23,"text":24,"correct":18},"D","高程控制测量等级划分为五个级别",{"key":26,"text":27,"correct":14},"E","设备安装过程中最好使用一个水准点作为高程起算点","ACE","2020版教材P23 本题考查的是工程测量的程序和方法。选项B：高程测量的方法有水准测量法、电磁波测距三角高程测量法，常用水准测量法。选项D：高程控制测量等级划分依次为：二、三、四、五等。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]