[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113378":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113378,787,2,"多选题","工程项目索赔发生的原因中，属于不可抗力因素的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","台风",true,{"key":16,"text":17,"correct":18},"B","物价变化",false,{"key":20,"text":21,"correct":14},"C","地震",{"key":23,"text":24,"correct":14},"D","洪水",{"key":26,"text":27,"correct":14},"E","战争","ACDE","本题考查的是施工合同变更与索赔。机电工程项目索赔发生的原因：不可抗力因素。如恶劣气候条件、地震、洪水、战争状态等。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]