[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113353":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113353,787,2,"多选题","电力驱动的曳引式电梯设备进场验收的要求包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","已经进行书面告知",false,{"key":16,"text":17,"correct":18},"B","随机文件完整",true,{"key":20,"text":21,"correct":14},"C","进行了土建交接验收",{"key":23,"text":24,"correct":18},"D","设备零部件应与装箱单内容相符",{"key":26,"text":27,"correct":18},"E","设备外观不应存在明显的损坏","BDE","本题考查的是电梯工程的验收要求。电力驱动的曳引式或强制式电梯设备进场验收要求：(1)随机文件完整；(2)设备零部件应与装箱单内容相符；(3)设备外观不应存在明显的损坏。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]