[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113350":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113350,787,2,"多选题","消防工程资料移交包括消防工程在设计、施工和验收过程中所形成的（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","招标文件",false,{"key":16,"text":17,"correct":14},"B","安装文件",{"key":19,"text":20,"correct":21},"C","经济文件",true,{"key":23,"text":24,"correct":21},"D","技术文件",{"key":26,"text":27,"correct":14},"E","合同文件","CD","本题考查的是消防工程验收的组织及验收程序。工程移交包括工程资料移交和工程实体移交两个方面。工程资料移交包括消防工程在设计、施工和验收过程中所形成的技术、经济文件；工程实体移交表明工程的保管要从施工单位转为使用单位或生产单位，并须按工程承包合同约定办理工程实体的移交手续。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]