[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113334":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113334,787,2,"多选题","风管批量制作前，对风管制作工艺进行检验时，应进行（ ）试验。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","风管风压试验",false,{"key":16,"text":17,"correct":18},"B","风管强度试验",true,{"key":20,"text":21,"correct":14},"C","风管真空度试验",{"key":23,"text":24,"correct":18},"D","风管严密性试验",{"key":26,"text":27,"correct":14},"E","风管压强试验","BD","本题考查的是通风与空调系统的检测与试验。风管批量制作前，对风管制作工艺进行检验时，应进行风管强度与严密性试验。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]