[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113280":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1113280,787,2,"多选题","关于电气装置安装注意事项，下列说法正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","电气设备和器材的安装前存放.保管期限应按厂家要求",true,{"key":16,"text":17,"correct":18},"B","电气设备在起吊和搬运中，受力点位置应符合设计图纸规定",false,{"key":20,"text":21,"correct":14},"C","互感器安装就位后，应该将各接地引出端子良好接地",{"key":23,"text":24,"correct":14},"D","电气设备安装用的紧固件应采用镀锌制品",{"key":26,"text":27,"correct":14},"E","按设计要求做好保护接地和工作接地","ACDE","本题考查的是电气设备的施工技术要求。选项B，正确的表述应为“电气设备在起吊和搬运中，受力点位置应符合产品技术文件的规定”。",{"id":6,"name":31,"category":32,"favorite":33},"二建机电工程实务","建筑工程",0]