[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113168":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1113168,787,1,"单选题","下列子分部工程中，不属于液压电梯安装工程的是（）。2017",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","补偿装置安装",true,{"key":16,"text":17,"correct":18},"B","悬挂装置安装",false,{"key":20,"text":21,"correct":18},"C","导轨安装",{"key":23,"text":24,"correct":18},"D","对重（平衡重）安装","本题考查的是电梯的组成。液压电梯安装子分部工程是由设备进场验收，土建交接检验，液压系统，导轨，门系统，轿厢，对重（平衡重），安全部件，悬挂装置，随行电缆，电气装置，整机安装验收等分项工程组成。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]