[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113165":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1113165,787,1,"单选题","曳引式电梯设备进场验收合格后，在驱动主机安装前的工序是（）2014",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","土建交接检验",true,{"key":16,"text":17,"correct":18},"B","轿厢导轨安装",false,{"key":20,"text":21,"correct":18},"C","随行电缆安装",{"key":23,"text":24,"correct":18},"D","安全部件安装","考查内容：电梯工程施工技术。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]