[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1113150":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1113150,787,1,"单选题","风管型压力、压差传感器应在应在风管（）完成后进行安装。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","安装",false,{"key":16,"text":17,"correct":14},"B","试验",{"key":19,"text":20,"correct":21},"C","保温层",true,{"key":23,"text":24,"correct":14},"D","防腐","风管型压力、压差传感器和压差开关应在风管保温层完成之后安装。水管型压力、压差传感器的安装应在管道安装时进行，其开孔与焊接工作必须在管道压力试验、清洗、防腐和保温前进行。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]