[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112971":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1112971,787,1,"单选题","分包单位对所承担的工程项目质量负责，并应按规定的程序进行（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","自我检查评定",true,{"key":16,"text":17,"correct":18},"B","交工资料整理",false,{"key":20,"text":21,"correct":18},"C","提供规范的试验报告",{"key":23,"text":24,"correct":18},"D","保存好验评记录","2020版教材P364 4、分包单位对总承包单位负责，亦对建设单位负责，因此，分包单位对承建的项目进行检验时，总包单位应参加，检验合格后，分包单位应将工程的有关资料移交总包单位，待建设单位组织单位工程质量验收时，分包单位负责人应参加验收。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]