[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112968":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1112968,787,1,"单选题","验收评定工作的基础工作在施工单位，并经第三方的质量监督部门或（ ）来确认。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","质量检测机构",false,{"key":16,"text":17,"correct":18},"B","竣工验收组织",true,{"key":20,"text":21,"correct":14},"C","工程监理单位",{"key":23,"text":24,"correct":14},"D","勘察设计单位","2020版教材P364 一、建筑安装工程施工质量验收程序验收工作的基础工作在施工单位，即主要由施工单位来实施，并经第三方的工程质量监督部门或验收组织来确认。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]