[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112886":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1112886,787,1,"单选题","施工单位应根据国家有关标准、规范和施工现场的实际负荷情况，编制施工现场“临时用电施工组织设计”，并协助业主向当地电业部门（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","申请用电许可",false,{"key":16,"text":17,"correct":18},"B","申报用电方案",true,{"key":20,"text":21,"correct":14},"C","申报用电额度",{"key":23,"text":24,"correct":14},"D","申请用电安全评审","2020版教材P340 施工单位应根据国家有关标准、规范和施工现场的实际负荷情况，编制施工现场“临时用电施工组织设计”，并协助业主向当地电业部门申报用电方案。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]