[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112798":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1112798,787,1,"单选题","施工作业进度计划是根据（ ）施工进度计划的编制的。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","单项工程",false,{"key":16,"text":17,"correct":18},"B","单位工程",true,{"key":20,"text":21,"correct":14},"C","分部工程",{"key":23,"text":24,"correct":14},"D","分项工程","2020版教材P224 应根据单位工程施工进度计划编制施工作业进度计划",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]