[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112786":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1112786,787,1,"单选题","施工现场材料管理的直接责任人是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目经理",false,{"key":16,"text":17,"correct":14},"B","材料员",{"key":19,"text":20,"correct":21},"C","项目部主管材料员",true,{"key":23,"text":24,"correct":14},"D","项目工长","2020版教材P202 （2）施工项目经理是现场材料管理全面领导责任者，施工项目部主管材料人员是施工现场材料管理直接责任人。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]