[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112738":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1112738,787,1,"单选题","管道穿过建筑地下室侧墙时应在（ ）进行安装。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","室内管道安装后",true,{"key":16,"text":17,"correct":18},"B","室内管道安装前",false,{"key":20,"text":21,"correct":18},"C","室内管道安装中",{"key":23,"text":24,"correct":18},"D","室内管道验收后","2020版教材P131 当管道穿过地下室侧墙时应在室内管道安装结束后再进行安装，安装过程应注意成品保护。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]