[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112668":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1112668,787,1,"单选题","下列文件中，不属于智能化工程验收文件的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","智能化设备产品质量合格检验记录",true,{"key":16,"text":17,"correct":18},"B","设备开箱检验记录",false,{"key":20,"text":21,"correct":18},"C","设计变更记录",{"key":23,"text":24,"correct":18},"D","系统检测记录","2020版教材P156 本题考查的是建筑智能化工程的施工程序。智能化工程验收文件包括：（1）竣工图纸；（2）设计变更记录和工程洽商记录；（3）设备材料进场检验记录和设备开箱检验记录；（4）分项工程质量验收记录；（5）试运行记录；（6）系统检测记录；（7）培训记录和培训资料。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]